{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/32220"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/32220","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Suitability of Box-Jenkins modeling for Navy repair parts","abstract":"A basic function in the proper management of repair part inventories is the forecasting of future demand. The Navy maintains a database of univariate demand data for its repair part inventories using a quarterly time interval. Historically, Navy repair part demand forecasting has been done using the exponential smoothing procedure. This method is a simple and robust means of forecasting, however it does not make use of any characteristics of the entire time series such as trend, cycles, presence of outliers, or demand clustering. This research begins by developing several simple, robust, and dimensionless time series features. These features are used to predict the suitability of Box- Jenkins (ARIMA) modeling. The ARIMA process is a powerful time series modeling and forecasting technique which possesses flexibility for the inclusion of many time series characteristics. This research project develops a predictive model of ARIMA suitability using both classical regression and a modem expert-system statistical package, ModelQuest. A computationally simple means is presented for determining which time series may benefit from the Box4enkins methodology. Using ARIMA modeling for time series that show significant benefit will provide a more accurate demand forecast and benefit inventory management.","abstract_html":"A basic function in the proper management of repair part inventories is the forecasting of future demand. The Navy maintains a database of univariate demand data for its repair part inventories using a quarterly time interval. Historically, Navy repair part demand forecasting has been done using the exponential smoothing procedure. This method is a simple and robust means of forecasting, however it does not make use of any characteristics of the entire time series such as trend, cycles, presence of outliers, or demand clustering. This research begins by developing several simple, robust, and dimensionless time series features. These features are used to predict the suitability of Box- Jenkins (ARIMA) modeling. The ARIMA process is a powerful time series modeling and forecasting technique which possesses flexibility for the inclusion of many time series characteristics. This research project develops a predictive model of ARIMA suitability using both classical regression and a modem expert-system statistical package, ModelQuest. A computationally simple means is presented for determining which time series may benefit from the Box4enkins methodology. Using ARIMA modeling for time series that show significant benefit will provide a more accurate demand forecast and benefit inventory management.","abstract_has_math":false,"creators":["Businger, Mark P."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":null,"school":null,"contributors":[],"advisors":["Read, R.R."],"committee_chairs":[],"committee_members":[],"year":1996,"date_issued":"1996-09","date_published":"1996-09","updated_at":"2026-11-21T22:45:10Z","subjects":[],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/32220","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/32220","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F32220","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F32220","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Read, R.R."]},{"key":"dc:creator","label":"Author","values":["Businger, Mark P."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["September, 1996"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-04-30T22:06:36Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-04-30T22:06:36Z"]},{"key":"dc:date.issued","label":"Date","values":["1996-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/32220"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["A basic function in the proper management of repair part inventories is the forecasting of future demand. The Navy maintains a database of univariate demand data for its repair part inventories using a quarterly time interval. Historically, Navy repair part demand forecasting has been done using the exponential smoothing procedure. This method is a simple and robust means of forecasting, however it does not make use of any characteristics of the entire time series such as trend, cycles, presence of outliers, or demand clustering. This research begins by developing several simple, robust, and dimensionless time series features. These features are used to predict the suitability of Box- Jenkins (ARIMA) modeling. The ARIMA process is a powerful time series modeling and forecasting technique which possesses flexibility for the inclusion of many time series characteristics. This research project develops a predictive model of ARIMA suitability using both classical regression and a modem expert-system statistical package, ModelQuest. A computationally simple means is presented for determining which time series may benefit from the Box4enkins methodology. Using ARIMA modeling for time series that show significant benefit will provide a more accurate demand forecast and benefit inventory management."]},{"key":"dc:description.award","label":"Dc Description Award","values":["NA"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/suitabilityofbox1094532220"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xii, 59 p."]},{"key":"dc:title","label":"Title","values":["Suitability of Box-Jenkins modeling for Navy repair parts"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Navy (U.S.N.) author"]}]}],"canonical_facts":{"dc:contributor.advisor":["Read, R.R."],"dc:creator":["Businger, Mark P."],"dc:date":["September, 1996"],"dc:date.accessioned":["2013-04-30T22:06:36Z"],"dc:date.available":["2013-04-30T22:06:36Z"],"dc:date.issued":["1996-09"],"dc:description.abstract":["A basic function in the proper management of repair part inventories is the forecasting of future demand. The Navy maintains a database of univariate demand data for its repair part inventories using a quarterly time interval. Historically, Navy repair part demand forecasting has been done using the exponential smoothing procedure. This method is a simple and robust means of forecasting, however it does not make use of any characteristics of the entire time series such as trend, cycles, presence of outliers, or demand clustering. This research begins by developing several simple, robust, and dimensionless time series features. These features are used to predict the suitability of Box- Jenkins (ARIMA) modeling. The ARIMA process is a powerful time series modeling and forecasting technique which possesses flexibility for the inclusion of many time series characteristics. This research project develops a predictive model of ARIMA suitability using both classical regression and a modem expert-system statistical package, ModelQuest. A computationally simple means is presented for determining which time series may benefit from the Box4enkins methodology. Using ARIMA modeling for time series that show significant benefit will provide a more accurate demand forecast and benefit inventory management."],"dc:description.award":["NA"],"dc:description.uri":["http://archive.org/details/suitabilityofbox1094532220"],"dc:format.extent":["xii, 59 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/32220"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:title":["Suitability of Box-Jenkins modeling for Navy repair parts"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Navy (U.S.N.) author"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:45:10Z"}