{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/32830"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/32830","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Conducting a Competitive Prototype Acquisition Program: An Account of the Joint Light Tactical Vehicle (JLTV) Technology Development Phase.","abstract":"The Joint Light Tactical Vehicle (JLTV) was among the first defense programs to require a competitive prototyping acquisition strategy under the 19 Sep 07 USD (AT&L) policy Memorandum, Prototyping and Competition. At Milestone A, the program was directed to inform the requirements process, validate technology maturity, assess commonality of components across a family of vehicles, and assess manufacturing risks. As a result, the joint program office simultaneously executed three weapon system prototyping contracts in a continuously competitive environment while meeting cost, schedule, and performance objectives. The goal of the JAP was to describe the program management strategy used in the JLTV Technology Development (TD) phase. The resulting document is a firsthand perspective from working within the Product Manager (PM). It discusses how TD acquisition phase program objectives were addressed and several unique management solutions. The focus is an account of planning and managing three contracts from Sep 2008 until May 2010. Information from the JLTV TD phase has significantly changed the requirements for the EMD phase. In addition to informing requirements, the program leveraged the competitive environment by maintaining constant emphasis on the contractors to meet cost and schedule. The results demonstrated that competitive prototyping can work.","abstract_html":"The Joint Light Tactical Vehicle (JLTV) was among the first defense programs to require a competitive prototyping acquisition strategy under the 19 Sep 07 USD (AT&amp;L) policy Memorandum, Prototyping and Competition. At Milestone A, the program was directed to inform the requirements process, validate technology maturity, assess commonality of components across a family of vehicles, and assess manufacturing risks. As a result, the joint program office simultaneously executed three weapon system prototyping contracts in a continuously competitive environment while meeting cost, schedule, and performance objectives. The goal of the JAP was to describe the program management strategy used in the JLTV Technology Development (TD) phase. The resulting document is a firsthand perspective from working within the Product Manager (PM). It discusses how TD acquisition phase program objectives were addressed and several unique management solutions. The focus is an account of planning and managing three contracts from Sep 2008 until May 2010. Information from the JLTV TD phase has significantly changed the requirements for the EMD phase. In addition to informing requirements, the program leveraged the competitive environment by maintaining constant emphasis on the contractors to meet cost and schedule. The results demonstrated that competitive prototyping can work.","abstract_has_math":false,"creators":["Grgurich, Joel M."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master Of Science In Program Management","degree_level":"Masters","degree_discipline":"Program Management","degree_department":null,"school":null,"contributors":[],"advisors":["Dopp, David;Bourdreau, Michael"],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013-03","date_published":"2013-03","updated_at":"2026-11-19T06:33:04Z","subjects":[],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/32830","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/32830","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F32830","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F32830","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Dopp, David;Bourdreau, Michael"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Grgurich, Joel M."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-05-08T20:41:55Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-05-08T20:41:55Z"]},{"key":"dc:date.issued","label":"Date","values":["2013-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master Of Science In Program Management"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["JLTV;Joint Light Tactical Vehicle;competitive prototyping;technology development phase"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/32830"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The Joint Light Tactical Vehicle (JLTV) was among the first defense programs to require a competitive prototyping acquisition strategy under the 19 Sep 07 USD (AT&L) policy Memorandum, Prototyping and Competition. At Milestone A, the program was directed to inform the requirements process, validate technology maturity, assess commonality of components across a family of vehicles, and assess manufacturing risks. As a result, the joint program office simultaneously executed three weapon system prototyping contracts in a continuously competitive environment while meeting cost, schedule, and performance objectives. The goal of the JAP was to describe the program management strategy used in the JLTV Technology Development (TD) phase. The resulting document is a firsthand perspective from working within the Product Manager (PM). It discusses how TD acquisition phase program objectives were addressed and several unique management solutions. The focus is an account of planning and managing three contracts from Sep 2008 until May 2010. Information from the JLTV TD phase has significantly changed the requirements for the EMD phase. In addition to informing requirements, the program leveraged the competitive environment by maintaining constant emphasis on the contractors to meet cost and schedule. The results demonstrated that competitive prototyping can work."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/conductingcompet1094532830"]},{"key":"dc:title","label":"Title","values":["Conducting a Competitive Prototype Acquisition Program: An Account of the Joint Light Tactical Vehicle (JLTV) Technology Development Phase."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Department of the Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Dopp, David;Bourdreau, Michael"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Grgurich, Joel M."],"dc:date.accessioned":["2013-05-08T20:41:55Z"],"dc:date.available":["2013-05-08T20:41:55Z"],"dc:date.issued":["2013-03"],"dc:description.abstract":["The Joint Light Tactical Vehicle (JLTV) was among the first defense programs to require a competitive prototyping acquisition strategy under the 19 Sep 07 USD (AT&L) policy Memorandum, Prototyping and Competition. At Milestone A, the program was directed to inform the requirements process, validate technology maturity, assess commonality of components across a family of vehicles, and assess manufacturing risks. As a result, the joint program office simultaneously executed three weapon system prototyping contracts in a continuously competitive environment while meeting cost, schedule, and performance objectives. The goal of the JAP was to describe the program management strategy used in the JLTV Technology Development (TD) phase. The resulting document is a firsthand perspective from working within the Product Manager (PM). It discusses how TD acquisition phase program objectives were addressed and several unique management solutions. The focus is an account of planning and managing three contracts from Sep 2008 until May 2010. Information from the JLTV TD phase has significantly changed the requirements for the EMD phase. In addition to informing requirements, the program leveraged the competitive environment by maintaining constant emphasis on the contractors to meet cost and schedule. The results demonstrated that competitive prototyping can work."],"dc:description.uri":["http://archive.org/details/conductingcompet1094532830"],"dc:identifier.uri":["https://hdl.handle.net/10945/32830"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["JLTV;Joint Light Tactical Vehicle;competitive prototyping;technology development phase"],"dc:title":["Conducting a Competitive Prototype Acquisition Program: An Account of the Joint Light Tactical Vehicle (JLTV) Technology Development Phase."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Department of the Army"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master Of Science In Program Management"]},"updated_at":"2026-11-19T06:33:04Z"}