{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/3319"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/3319","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"The use of collaborative and three dimensional imaging technology to achieve increased value and efficiency in the cost estimation portion of the shipman environment","abstract":"Maintenance and modernization efforts of the U.S. Navy?s fleet are essential to the U.S.?s ability to project power and deter adversaries from around the world. This maintenance and modernization requires substantial allocation of funds from the already stretched thin budget. In order to facilitate the most cost-effective way of allocating funds the Navy has invested substantial fiscal and human resources to standardize the processes used to accomplish maintenance, modernization and repair for its fleet of ships. In order to realize the full benefit to the available technology, reliable and quantitative measures which capture and measure the full range of benefits provided by technology resources are essential. The Knowledge Value Added (KVA) methodology will be used in this thesis to identify and quantify the benefits that can be realized within the cost estimation portion of the ship maintenance and modernization (SHIPMAIN) program. A proof of concept case was developed to analyze the current cost estimation process with SHIPMAIN. After the completion of the baseline as-is process, the KVA methodology is applied to a notional scenario which uses 3D laser scanning and Product Lifecycle Management to reengineer the current cost estimation process. The notional scenario demonstrates positive returns from the reengineered cost estimation process and the KVA methodology establishes evidence which suggests that operating costs will be reduced by over $176 million and cost estimation efficiency will increase.","abstract_html":"Maintenance and modernization efforts of the U.S. Navy?s fleet are essential to the U.S.?s ability to project power and deter adversaries from around the world. This maintenance and modernization requires substantial allocation of funds from the already stretched thin budget. In order to facilitate the most cost-effective way of allocating funds the Navy has invested substantial fiscal and human resources to standardize the processes used to accomplish maintenance, modernization and repair for its fleet of ships. In order to realize the full benefit to the available technology, reliable and quantitative measures which capture and measure the full range of benefits provided by technology resources are essential. The Knowledge Value Added (KVA) methodology will be used in this thesis to identify and quantify the benefits that can be realized within the cost estimation portion of the ship maintenance and modernization (SHIPMAIN) program. A proof of concept case was developed to analyze the current cost estimation process with SHIPMAIN. After the completion of the baseline as-is process, the KVA methodology is applied to a notional scenario which uses 3D laser scanning and Product Lifecycle Management to reengineer the current cost estimation process. The notional scenario demonstrates positive returns from the reengineered cost estimation process and the KVA methodology establishes evidence which suggests that operating costs will be reduced by over $176 million and cost estimation efficiency will increase.","abstract_has_math":false,"creators":["Cornelius, David H."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S.","degree_level":"Masters","degree_discipline":"Information Technology Management","degree_department":null,"school":null,"contributors":[],"advisors":["Housel, Thomas","Barreto, Albert"],"committee_chairs":[],"committee_members":[],"year":2007,"date_issued":"2007-09","date_published":"2007-09","updated_at":"2026-11-26T00:17:45Z","subjects":["Money","Reliability","Cost effectiveness","Ability","Human beings","Information technology","Management","Ships","Maintenance"],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["176275636"],"render_values":[{"text":"176275636","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/3319","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/3319","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F3319","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F3319","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Housel, Thomas","Barreto, Albert"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Cornelius, David H."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:38:00Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:38:00Z"]},{"key":"dc:date.issued","label":"Date","values":["2007-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Information Technology Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Money","Reliability","Cost effectiveness","Ability","Human beings","Information technology","Management","Ships","Maintenance"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["176275636"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/3319"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Maintenance and modernization efforts of the U.S. Navy?s fleet are essential to the U.S.?s ability to project power and deter adversaries from around the world. This maintenance and modernization requires substantial allocation of funds from the already stretched thin budget. In order to facilitate the most cost-effective way of allocating funds the Navy has invested substantial fiscal and human resources to standardize the processes used to accomplish maintenance, modernization and repair for its fleet of ships. In order to realize the full benefit to the available technology, reliable and quantitative measures which capture and measure the full range of benefits provided by technology resources are essential. The Knowledge Value Added (KVA) methodology will be used in this thesis to identify and quantify the benefits that can be realized within the cost estimation portion of the ship maintenance and modernization (SHIPMAIN) program. A proof of concept case was developed to analyze the current cost estimation process with SHIPMAIN. After the completion of the baseline as-is process, the KVA methodology is applied to a notional scenario which uses 3D laser scanning and Product Lifecycle Management to reengineer the current cost estimation process. The notional scenario demonstrates positive returns from the reengineered cost estimation process and the KVA methodology establishes evidence which suggests that operating costs will be reduced by over $176 million and cost estimation efficiency will increase."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/theuseofcollabor109453319"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xvi, 83 p. : ill. ;"]},{"key":"dc:title","label":"Title","values":["The use of collaborative and three dimensional imaging technology to achieve increased value and efficiency in the cost estimation portion of the shipman environment"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["US Navy (USN) author."]},{"key":"local:etd.verified","label":"Local Etd Verified","values":["no"]}]}],"canonical_facts":{"dc:contributor.advisor":["Housel, Thomas","Barreto, Albert"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Cornelius, David H."],"dc:date.accessioned":["2012-03-14T17:38:00Z"],"dc:date.available":["2012-03-14T17:38:00Z"],"dc:date.issued":["2007-09"],"dc:description.abstract":["Maintenance and modernization efforts of the U.S. Navy?s fleet are essential to the U.S.?s ability to project power and deter adversaries from around the world. This maintenance and modernization requires substantial allocation of funds from the already stretched thin budget. In order to facilitate the most cost-effective way of allocating funds the Navy has invested substantial fiscal and human resources to standardize the processes used to accomplish maintenance, modernization and repair for its fleet of ships. In order to realize the full benefit to the available technology, reliable and quantitative measures which capture and measure the full range of benefits provided by technology resources are essential. The Knowledge Value Added (KVA) methodology will be used in this thesis to identify and quantify the benefits that can be realized within the cost estimation portion of the ship maintenance and modernization (SHIPMAIN) program. A proof of concept case was developed to analyze the current cost estimation process with SHIPMAIN. After the completion of the baseline as-is process, the KVA methodology is applied to a notional scenario which uses 3D laser scanning and Product Lifecycle Management to reengineer the current cost estimation process. The notional scenario demonstrates positive returns from the reengineered cost estimation process and the KVA methodology establishes evidence which suggests that operating costs will be reduced by over $176 million and cost estimation efficiency will increase."],"dc:description.uri":["http://archive.org/details/theuseofcollabor109453319"],"dc:format.extent":["xvi, 83 p. : ill. ;"],"dc:identifier.oclc":["176275636"],"dc:identifier.uri":["https://hdl.handle.net/10945/3319"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.lcsh":["Money","Reliability","Cost effectiveness","Ability","Human beings","Information technology","Management","Ships","Maintenance"],"dc:title":["The use of collaborative and three dimensional imaging technology to achieve increased value and efficiency in the cost estimation portion of the shipman environment"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["US Navy (USN) author."],"local:etd.verified":["no"],"thesis:degree_discipline":["Information Technology Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S."],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:17:45Z"}