{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/3347"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/3347","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Improving naval shipbuilding project efficiency through rework reduction","abstract":"The rising cost of U.S. Naval Ships and the rate of change in technology require a thorough analysis of current shipbuilding practices. The Navy wants the latest and greatest technology, while at the same time keeping overall cost low. Some technologies are obsolete before completion of the ship's design and construction. A design locked in at Critical Design Review (CDR) undergoes multiple modifications prior to ship's delivery. Design changes drive up cost. The goal is to provide the Warfighter Battlespace Dominance while keeping cost low enough to allow a consistent purchase of additional ships. To accomplish this goal, both industry and the Navy must be aware of what is driving design changes and willing to revise existing practices. The objectives of this thesis are to identify the major sources of rework and to suggest modifications and improvements to existing practices. A review of DoD Acquisition and the Shipbuilding process identifies design changes resulting from requirements volatility, inconsistent execution of Defense Acquisition, and the rigidity of the design and construction process as major sources of rework. Recommendations include improving change management, optimizing the schedule for resilience, and the use of a modular open systems approach to reduce rework.","abstract_html":"The rising cost of U.S. Naval Ships and the rate of change in technology require a thorough analysis of current shipbuilding practices. The Navy wants the latest and greatest technology, while at the same time keeping overall cost low. Some technologies are obsolete before completion of the ship&#x27;s design and construction. A design locked in at Critical Design Review (CDR) undergoes multiple modifications prior to ship&#x27;s delivery. Design changes drive up cost. The goal is to provide the Warfighter Battlespace Dominance while keeping cost low enough to allow a consistent purchase of additional ships. To accomplish this goal, both industry and the Navy must be aware of what is driving design changes and willing to revise existing practices. The objectives of this thesis are to identify the major sources of rework and to suggest modifications and improvements to existing practices. A review of DoD Acquisition and the Shipbuilding process identifies design changes resulting from requirements volatility, inconsistent execution of Defense Acquisition, and the rigidity of the design and construction process as major sources of rework. Recommendations include improving change management, optimizing the schedule for resilience, and the use of a modular open systems approach to reduce rework.","abstract_has_math":false,"creators":["Clark, Deborah L.","Howell, Donna M.","Wilson, Charles E."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Systems Engineering Management","degree_level":"Masters","degree_discipline":"Systems Engineering Management","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Osmundson, John"],"committee_chairs":[],"committee_members":["Cook, Henry B."],"year":2007,"date_issued":"2007-09","date_published":"2007-09","updated_at":"2026-11-19T06:33:04Z","subjects":[],"languages":[],"rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["176163057"],"render_values":[{"text":"176163057","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/3347","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/3347","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F3347","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Osmundson, John"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Cook, Henry B."]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["Clark, Deborah L.","Howell, Donna M.","Wilson, Charles E."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:38:05Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:38:05Z"]},{"key":"dc:date.issued","label":"Date","values":["2007-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["73c095de-fa3b-4d63-8300-9b6aee5b4d62"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Systems Engineering Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Design Changes","Rework","Shipbuilding","Out of Sequence"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["176163057"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/3347"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The rising cost of U.S. Naval Ships and the rate of change in technology require a thorough analysis of current shipbuilding practices. The Navy wants the latest and greatest technology, while at the same time keeping overall cost low. Some technologies are obsolete before completion of the ship's design and construction. A design locked in at Critical Design Review (CDR) undergoes multiple modifications prior to ship's delivery. Design changes drive up cost. The goal is to provide the Warfighter Battlespace Dominance while keeping cost low enough to allow a consistent purchase of additional ships. To accomplish this goal, both industry and the Navy must be aware of what is driving design changes and willing to revise existing practices. The objectives of this thesis are to identify the major sources of rework and to suggest modifications and improvements to existing practices. A review of DoD Acquisition and the Shipbuilding process identifies design changes resulting from requirements volatility, inconsistent execution of Defense Acquisition, and the rigidity of the design and construction process as major sources of rework. Recommendations include improving change management, optimizing the schedule for resilience, and the use of a modular open systems approach to reduce rework."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/improvingnavalsh109453347"]},{"key":"dc:title","label":"Title","values":["Improving naval shipbuilding project efficiency through rework reduction"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Northrop Grumman Corporation"]}]}],"canonical_facts":{"dc:contributor.advisor":["Osmundson, John"],"dc:contributor.committeemember":["Cook, Henry B."],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["Clark, Deborah L.","Howell, Donna M.","Wilson, Charles E."],"dc:date.accessioned":["2012-03-14T17:38:05Z"],"dc:date.available":["2012-03-14T17:38:05Z"],"dc:date.issued":["2007-09"],"dc:description.abstract":["The rising cost of U.S. Naval Ships and the rate of change in technology require a thorough analysis of current shipbuilding practices. The Navy wants the latest and greatest technology, while at the same time keeping overall cost low. Some technologies are obsolete before completion of the ship's design and construction. A design locked in at Critical Design Review (CDR) undergoes multiple modifications prior to ship's delivery. Design changes drive up cost. The goal is to provide the Warfighter Battlespace Dominance while keeping cost low enough to allow a consistent purchase of additional ships. To accomplish this goal, both industry and the Navy must be aware of what is driving design changes and willing to revise existing practices. The objectives of this thesis are to identify the major sources of rework and to suggest modifications and improvements to existing practices. A review of DoD Acquisition and the Shipbuilding process identifies design changes resulting from requirements volatility, inconsistent execution of Defense Acquisition, and the rigidity of the design and construction process as major sources of rework. Recommendations include improving change management, optimizing the schedule for resilience, and the use of a modular open systems approach to reduce rework."],"dc:description.uri":["http://archive.org/details/improvingnavalsh109453347"],"dc:identifier.oclc":["176163057"],"dc:identifier.uri":["https://hdl.handle.net/10945/3347"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["73c095de-fa3b-4d63-8300-9b6aee5b4d62"],"dc:rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Design Changes","Rework","Shipbuilding","Out of Sequence"],"dc:title":["Improving naval shipbuilding project efficiency through rework reduction"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Northrop Grumman Corporation"],"thesis:degree_discipline":["Systems Engineering Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Systems Engineering Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:33:04Z"}