{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/34636"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/34636","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"The study of the rapid acquisition Mine Resistant Ambush Protected (MRAP) vehicle program and its impact on the warfighter","abstract":"The purpose of this study is to document and analyze the benefit and shortcomings experienced by the various stakeholders, particularly the warfighters. It is also to determine if the accelerated acquisition strategy used for the Mine Resistance Ambush Protected (MRAP) vehicle program provided sufficient benefits to the warfighter to become the model program for future U.S. military major acquisition programs? The urgent need for a vehicle capable of protecting the warfighters in Iraq and Afghanistan against improvised explosive devices (IEDs), rocket-propelled grenades, and small arms fire, prompted the approval of an accelerated acquisition program for the development and purchase of the MRAP vehicle. The time from the initial needs statement in February 2006 to the first fielding of the first MRAPs was less than 18 months. This accelerated acquisition process provided tremendous benefits; however, it was not without its shortcomings. Were the shortcomings outweighed by the benefits in this particular program, and most importantly, will this accelerated acquisition procedure used serve as a model for future major military acquisition programs? Answering these questions is the major focus of this study.","abstract_html":"The purpose of this study is to document and analyze the benefit and shortcomings experienced by the various stakeholders, particularly the warfighters. It is also to determine if the accelerated acquisition strategy used for the Mine Resistance Ambush Protected (MRAP) vehicle program provided sufficient benefits to the warfighter to become the model program for future U.S. military major acquisition programs? The urgent need for a vehicle capable of protecting the warfighters in Iraq and Afghanistan against improvised explosive devices (IEDs), rocket-propelled grenades, and small arms fire, prompted the approval of an accelerated acquisition program for the development and purchase of the MRAP vehicle. The time from the initial needs statement in February 2006 to the first fielding of the first MRAPs was less than 18 months. This accelerated acquisition process provided tremendous benefits; however, it was not without its shortcomings. Were the shortcomings outweighed by the benefits in this particular program, and most importantly, will this accelerated acquisition procedure used serve as a model for future major military acquisition programs? Answering these questions is the major focus of this study.","abstract_has_math":false,"creators":["Bulkley, Michael E.","Davis, Gregory C."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science","degree_level":"Masters","degree_discipline":"Program Management","degree_department":"Program Management","school":null,"contributors":[],"advisors":["Boudreau, Michael W.","Stokes, John E., Jr."],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013-06","date_published":"2013-06","updated_at":"2026-11-24T23:47:28Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/34636","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/34636","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F34636","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F34636","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Boudreau, Michael W.","Stokes, John E., Jr."]},{"key":"dc:contributor.department","label":"Department","values":["Program Management"]},{"key":"dc:creator","label":"Author","values":["Bulkley, Michael E.","Davis, Gregory C."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["Jun-13"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-08-01T16:51:25Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-08-01T16:51:25Z"]},{"key":"dc:date.issued","label":"Date","values":["2013-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science","Master of Science in Program Management"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["MRAP","Mine Resistant Ambush Protected Vehicle","Accelerated Acquisition","Rapid Acquisition","M-ATV","MRAP All-Terrain Vehicle"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/34636"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this study is to document and analyze the benefit and shortcomings experienced by the various stakeholders, particularly the warfighters. It is also to determine if the accelerated acquisition strategy used for the Mine Resistance Ambush Protected (MRAP) vehicle program provided sufficient benefits to the warfighter to become the model program for future U.S. military major acquisition programs? The urgent need for a vehicle capable of protecting the warfighters in Iraq and Afghanistan against improvised explosive devices (IEDs), rocket-propelled grenades, and small arms fire, prompted the approval of an accelerated acquisition program for the development and purchase of the MRAP vehicle. The time from the initial needs statement in February 2006 to the first fielding of the first MRAPs was less than 18 months. This accelerated acquisition process provided tremendous benefits; however, it was not without its shortcomings. Were the shortcomings outweighed by the benefits in this particular program, and most importantly, will this accelerated acquisition procedure used serve as a model for future major military acquisition programs? Answering these questions is the major focus of this study."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/thestudyofrapidc1094534636"]},{"key":"dc:title","label":"Title","values":["The study of the rapid acquisition Mine Resistant Ambush Protected (MRAP) vehicle program and its impact on the warfighter"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, United States Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Boudreau, Michael W.","Stokes, John E., Jr."],"dc:contributor.department":["Program Management"],"dc:creator":["Bulkley, Michael E.","Davis, Gregory C."],"dc:date":["Jun-13"],"dc:date.accessioned":["2013-08-01T16:51:25Z"],"dc:date.available":["2013-08-01T16:51:25Z"],"dc:date.issued":["2013-06"],"dc:description.abstract":["The purpose of this study is to document and analyze the benefit and shortcomings experienced by the various stakeholders, particularly the warfighters. It is also to determine if the accelerated acquisition strategy used for the Mine Resistance Ambush Protected (MRAP) vehicle program provided sufficient benefits to the warfighter to become the model program for future U.S. military major acquisition programs? The urgent need for a vehicle capable of protecting the warfighters in Iraq and Afghanistan against improvised explosive devices (IEDs), rocket-propelled grenades, and small arms fire, prompted the approval of an accelerated acquisition program for the development and purchase of the MRAP vehicle. The time from the initial needs statement in February 2006 to the first fielding of the first MRAPs was less than 18 months. This accelerated acquisition process provided tremendous benefits; however, it was not without its shortcomings. Were the shortcomings outweighed by the benefits in this particular program, and most importantly, will this accelerated acquisition procedure used serve as a model for future major military acquisition programs? Answering these questions is the major focus of this study."],"dc:description.uri":["http://archive.org/details/thestudyofrapidc1094534636"],"dc:identifier.uri":["https://hdl.handle.net/10945/34636"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["MRAP","Mine Resistant Ambush Protected Vehicle","Accelerated Acquisition","Rapid Acquisition","M-ATV","MRAP All-Terrain Vehicle"],"dc:title":["The study of the rapid acquisition Mine Resistant Ambush Protected (MRAP) vehicle program and its impact on the warfighter"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, United States Army"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science","Master of Science in Program Management"]},"updated_at":"2026-11-24T23:47:28Z"}