{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/34688"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/34688","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Analysis for the design of a U.S. Navy diving and salvage smart stage","abstract":"The Navys Dive and Salvage community is in need of a new dive stage, called the SMART Stage, which will increase the productivity and safety of its users along with matching their capabilities to that of the commercial industry. The existing dive stage is a stainless steel cage that merely transports divers and their tools from the surface towards the worksite at a maximum depth of 300 feet. What modifications and improvements can be made to make the divers safe? Improve productivity? Should this new stage be comprised of commercial off-the-shelf parts or can it be purchased as a pre-fabricated system? This thesis will investigate what is needed to improve the safety and productivity for the community as well as the possible design alternatives of a SMART Stage. This study will perform the Systems Engineering process by carrying out a stakeholder needs analysis to help define the functions and requirements that must be met by the SMART Stage.","abstract_html":"The Navys Dive and Salvage community is in need of a new dive stage, called the SMART Stage, which will increase the productivity and safety of its users along with matching their capabilities to that of the commercial industry. The existing dive stage is a stainless steel cage that merely transports divers and their tools from the surface towards the worksite at a maximum depth of 300 feet. What modifications and improvements can be made to make the divers safe? Improve productivity? Should this new stage be comprised of commercial off-the-shelf parts or can it be purchased as a pre-fabricated system? This thesis will investigate what is needed to improve the safety and productivity for the community as well as the possible design alternatives of a SMART Stage. This study will perform the Systems Engineering process by carrying out a stakeholder needs analysis to help define the functions and requirements that must be met by the SMART Stage.","abstract_has_math":false,"creators":["Kheshti, Puyan A."],"institution":"Monterey California. Naval Postgraduate School","degree_name":"Master of Science","degree_level":"Masters","degree_discipline":"Systems Engineering","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Whitcomb, Cliff"],"committee_chairs":[],"committee_members":["Papoulias, Fotis"],"year":2013,"date_issued":"2013-06","date_published":"2013-06","updated_at":"2026-11-19T06:33:31Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/34688","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/34688","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F34688","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F34688","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Whitcomb, Cliff"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Papoulias, Fotis"]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["Kheshti, Puyan A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["Jun-13"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-08-01T16:51:42Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-08-01T16:51:42Z"]},{"key":"dc:date.issued","label":"Date","values":["2013-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science","Master of Science in Systems Engineering"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["SMART Stage","Navy Dive and Salvage","Systems Engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/34688"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The Navys Dive and Salvage community is in need of a new dive stage, called the SMART Stage, which will increase the productivity and safety of its users along with matching their capabilities to that of the commercial industry. The existing dive stage is a stainless steel cage that merely transports divers and their tools from the surface towards the worksite at a maximum depth of 300 feet. What modifications and improvements can be made to make the divers safe? Improve productivity? Should this new stage be comprised of commercial off-the-shelf parts or can it be purchased as a pre-fabricated system? This thesis will investigate what is needed to improve the safety and productivity for the community as well as the possible design alternatives of a SMART Stage. This study will perform the Systems Engineering process by carrying out a stakeholder needs analysis to help define the functions and requirements that must be met by the SMART Stage."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/analysisfordesig1094534688"]},{"key":"dc:title","label":"Title","values":["Analysis for the design of a U.S. Navy diving and salvage smart stage"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Whitcomb, Cliff"],"dc:contributor.committeemember":["Papoulias, Fotis"],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["Kheshti, Puyan A."],"dc:date":["Jun-13"],"dc:date.accessioned":["2013-08-01T16:51:42Z"],"dc:date.available":["2013-08-01T16:51:42Z"],"dc:date.issued":["2013-06"],"dc:description.abstract":["The Navys Dive and Salvage community is in need of a new dive stage, called the SMART Stage, which will increase the productivity and safety of its users along with matching their capabilities to that of the commercial industry. The existing dive stage is a stainless steel cage that merely transports divers and their tools from the surface towards the worksite at a maximum depth of 300 feet. What modifications and improvements can be made to make the divers safe? Improve productivity? Should this new stage be comprised of commercial off-the-shelf parts or can it be purchased as a pre-fabricated system? This thesis will investigate what is needed to improve the safety and productivity for the community as well as the possible design alternatives of a SMART Stage. This study will perform the Systems Engineering process by carrying out a stakeholder needs analysis to help define the functions and requirements that must be met by the SMART Stage."],"dc:description.uri":["http://archive.org/details/analysisfordesig1094534688"],"dc:identifier.uri":["https://hdl.handle.net/10945/34688"],"dc:publisher":["Monterey California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["SMART Stage","Navy Dive and Salvage","Systems Engineering"],"dc:title":["Analysis for the design of a U.S. Navy diving and salvage smart stage"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Systems Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science","Master of Science in Systems Engineering"]},"updated_at":"2026-11-19T06:33:31Z"}