{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/34729"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/34729","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Analysis and evaluation of forecasting methods and tools to predict future demand for secondary chemical-biological configuration items","abstract":"As the Engineering Support Activity (ESA) for numerous consumable Chemical Biological items managed by the Defense Logistics Agency (DLA), Edgewood Chemical Biological Center (ECBC) must be able to complete reviews of all procurement packages within 15 calendar days. With such little lead time, it would be very beneficial if ECBC had the ability to forecast when DLA procurement actions will occur. This thesis presents an evaluation of the effectiveness of Simple Regression and Exponentially Weighted Moving Average (EWMA) forecasting models to predict the demand of Chemical Biological consumable items using the procurement history data for four specific items. Neither forecasting model proved effective at predicting the demand for the items due in large part to large variation in demand patterns. The inventory policies and supply issues which currently exist at an Army production site were investigated and it was recommended to consider Economic Order Quantity (EOQ) or Just-in-Time (JIT) inventory management models as possible alternatives to achieve smoother demand patterns. Additionally, recommendations were made to examine the integrity of the historical demand data as well as using a Multiple Regression forecast model with several causal effects in addition to time.","abstract_html":"As the Engineering Support Activity (ESA) for numerous consumable Chemical Biological items managed by the Defense Logistics Agency (DLA), Edgewood Chemical Biological Center (ECBC) must be able to complete reviews of all procurement packages within 15 calendar days. With such little lead time, it would be very beneficial if ECBC had the ability to forecast when DLA procurement actions will occur. This thesis presents an evaluation of the effectiveness of Simple Regression and Exponentially Weighted Moving Average (EWMA) forecasting models to predict the demand of Chemical Biological consumable items using the procurement history data for four specific items. Neither forecasting model proved effective at predicting the demand for the items due in large part to large variation in demand patterns. The inventory policies and supply issues which currently exist at an Army production site were investigated and it was recommended to consider Economic Order Quantity (EOQ) or Just-in-Time (JIT) inventory management models as possible alternatives to achieve smoother demand patterns. Additionally, recommendations were made to examine the integrity of the historical demand data as well as using a Multiple Regression forecast model with several causal effects in addition to time.","abstract_has_math":false,"creators":["Ritchey, Chris D."],"institution":"Monterey, California: Naval Postgraduate School","degree_name":"Master of Science","degree_level":"Masters","degree_discipline":"Systems Engineering","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Olwell, David","Wheeler, John W."],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013-06","date_published":"2013-06","updated_at":"2026-11-19T06:33:31Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/34729","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/34729","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F34729","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Olwell, David","Wheeler, John W."]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["Ritchey, Chris D."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["Jun-13"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-08-01T16:51:53Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-08-01T16:51:53Z"]},{"key":"dc:date.issued","label":"Date","values":["2013-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California: Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science","Master of Science in Systems Engineering"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Simple Regression Analysis","Exponentially Weighted Moving Average","Demand Planning","Forecasting Demand","Acquisition Lead Time","Economic Order Quantity","Just-in-Time Inventory Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/34729"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["As the Engineering Support Activity (ESA) for numerous consumable Chemical Biological items managed by the Defense Logistics Agency (DLA), Edgewood Chemical Biological Center (ECBC) must be able to complete reviews of all procurement packages within 15 calendar days. With such little lead time, it would be very beneficial if ECBC had the ability to forecast when DLA procurement actions will occur. This thesis presents an evaluation of the effectiveness of Simple Regression and Exponentially Weighted Moving Average (EWMA) forecasting models to predict the demand of Chemical Biological consumable items using the procurement history data for four specific items. Neither forecasting model proved effective at predicting the demand for the items due in large part to large variation in demand patterns. The inventory policies and supply issues which currently exist at an Army production site were investigated and it was recommended to consider Economic Order Quantity (EOQ) or Just-in-Time (JIT) inventory management models as possible alternatives to achieve smoother demand patterns. Additionally, recommendations were made to examine the integrity of the historical demand data as well as using a Multiple Regression forecast model with several causal effects in addition to time."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/analysisndevalua1094534729"]},{"key":"dc:title","label":"Title","values":["Analysis and evaluation of forecasting methods and tools to predict future demand for secondary chemical-biological configuration items"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, United States Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Olwell, David","Wheeler, John W."],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["Ritchey, Chris D."],"dc:date":["Jun-13"],"dc:date.accessioned":["2013-08-01T16:51:53Z"],"dc:date.available":["2013-08-01T16:51:53Z"],"dc:date.issued":["2013-06"],"dc:description.abstract":["As the Engineering Support Activity (ESA) for numerous consumable Chemical Biological items managed by the Defense Logistics Agency (DLA), Edgewood Chemical Biological Center (ECBC) must be able to complete reviews of all procurement packages within 15 calendar days. With such little lead time, it would be very beneficial if ECBC had the ability to forecast when DLA procurement actions will occur. This thesis presents an evaluation of the effectiveness of Simple Regression and Exponentially Weighted Moving Average (EWMA) forecasting models to predict the demand of Chemical Biological consumable items using the procurement history data for four specific items. Neither forecasting model proved effective at predicting the demand for the items due in large part to large variation in demand patterns. The inventory policies and supply issues which currently exist at an Army production site were investigated and it was recommended to consider Economic Order Quantity (EOQ) or Just-in-Time (JIT) inventory management models as possible alternatives to achieve smoother demand patterns. Additionally, recommendations were made to examine the integrity of the historical demand data as well as using a Multiple Regression forecast model with several causal effects in addition to time."],"dc:description.uri":["http://archive.org/details/analysisndevalua1094534729"],"dc:identifier.uri":["https://hdl.handle.net/10945/34729"],"dc:publisher":["Monterey, California: Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Simple Regression Analysis","Exponentially Weighted Moving Average","Demand Planning","Forecasting Demand","Acquisition Lead Time","Economic Order Quantity","Just-in-Time Inventory Management"],"dc:title":["Analysis and evaluation of forecasting methods and tools to predict future demand for secondary chemical-biological configuration items"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, United States Army"],"thesis:degree_discipline":["Systems Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science","Master of Science in Systems Engineering"]},"updated_at":"2026-11-19T06:33:31Z"}