{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/34762"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/34762","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An analysis of NCO availability performance metrics and their relation to availability performance","abstract":"The Navys approach to planning and executing Chief of Naval Operations maintenance availabilities has undergone significant changes since 2006. The adoption of unique lean initiatives and defined project management fundamentals have guided shipyard and project leadership as they manage scheduled industrial maintenance for ships and submarines. These business practices have resulted in performance measurement and control data being gathered for shipyard management to use as they analyze availability performance. This thesis reports on the results of exploratory analyses of these data to evaluate associations and trends pertaining to cost and schedule performance since the inception of the lean initiative. The studys analyses suggest that numerous performance metrics display trends which suggest availability performance is improving over the defined lean initiative time frame; that several metrics are functions of the length of the individual availability and require appropriate weighting considerations; and that average weekly interim production bow wave metrics evaluated early in an availability may have predictive abilities concerning availability completion success.","abstract_html":"The Navys approach to planning and executing Chief of Naval Operations maintenance availabilities has undergone significant changes since 2006. The adoption of unique lean initiatives and defined project management fundamentals have guided shipyard and project leadership as they manage scheduled industrial maintenance for ships and submarines. These business practices have resulted in performance measurement and control data being gathered for shipyard management to use as they analyze availability performance. This thesis reports on the results of exploratory analyses of these data to evaluate associations and trends pertaining to cost and schedule performance since the inception of the lean initiative. The studys analyses suggest that numerous performance metrics display trends which suggest availability performance is improving over the defined lean initiative time frame; that several metrics are functions of the length of the individual availability and require appropriate weighting considerations; and that average weekly interim production bow wave metrics evaluated early in an availability may have predictive abilities concerning availability completion success.","abstract_has_math":false,"creators":["White, Matthew J."],"institution":"Monterey, California: Naval Postgraduate School","degree_name":"Master of Science","degree_level":"Masters","degree_discipline":"Systems Engineering","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Whitcomb, Clifford","Jacobs, Patricia"],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013-06","date_published":"2013-06","updated_at":"2026-11-19T06:33:31Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/34762","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/34762","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F34762","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F34762","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Whitcomb, Clifford","Jacobs, Patricia"]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["White, Matthew J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["Jun-13"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-08-01T16:52:01Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-08-01T16:52:01Z"]},{"key":"dc:date.issued","label":"Date","values":["2013-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California: Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science","Master of Science in Systems Engineering"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["CNO Availability","Naval Shipyards","Performance Metrics","Project Management","Navy Industrial Maintenance","Systems Engineering","Process Improvement","Availability Lateness"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/34762"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The Navys approach to planning and executing Chief of Naval Operations maintenance availabilities has undergone significant changes since 2006. The adoption of unique lean initiatives and defined project management fundamentals have guided shipyard and project leadership as they manage scheduled industrial maintenance for ships and submarines. These business practices have resulted in performance measurement and control data being gathered for shipyard management to use as they analyze availability performance. This thesis reports on the results of exploratory analyses of these data to evaluate associations and trends pertaining to cost and schedule performance since the inception of the lean initiative. The studys analyses suggest that numerous performance metrics display trends which suggest availability performance is improving over the defined lean initiative time frame; that several metrics are functions of the length of the individual availability and require appropriate weighting considerations; and that average weekly interim production bow wave metrics evaluated early in an availability may have predictive abilities concerning availability completion success."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/annalysisofncova1094534762"]},{"key":"dc:title","label":"Title","values":["An analysis of NCO availability performance metrics and their relation to availability performance"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Whitcomb, Clifford","Jacobs, Patricia"],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["White, Matthew J."],"dc:date":["Jun-13"],"dc:date.accessioned":["2013-08-01T16:52:01Z"],"dc:date.available":["2013-08-01T16:52:01Z"],"dc:date.issued":["2013-06"],"dc:description.abstract":["The Navys approach to planning and executing Chief of Naval Operations maintenance availabilities has undergone significant changes since 2006. The adoption of unique lean initiatives and defined project management fundamentals have guided shipyard and project leadership as they manage scheduled industrial maintenance for ships and submarines. These business practices have resulted in performance measurement and control data being gathered for shipyard management to use as they analyze availability performance. This thesis reports on the results of exploratory analyses of these data to evaluate associations and trends pertaining to cost and schedule performance since the inception of the lean initiative. The studys analyses suggest that numerous performance metrics display trends which suggest availability performance is improving over the defined lean initiative time frame; that several metrics are functions of the length of the individual availability and require appropriate weighting considerations; and that average weekly interim production bow wave metrics evaluated early in an availability may have predictive abilities concerning availability completion success."],"dc:description.uri":["http://archive.org/details/annalysisofncova1094534762"],"dc:identifier.uri":["https://hdl.handle.net/10945/34762"],"dc:publisher":["Monterey, California: Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["CNO Availability","Naval Shipyards","Performance Metrics","Project Management","Navy Industrial Maintenance","Systems Engineering","Process Improvement","Availability Lateness"],"dc:title":["An analysis of NCO availability performance metrics and their relation to availability performance"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Systems Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science","Master of Science in Systems Engineering"]},"updated_at":"2026-11-19T06:33:31Z"}