{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/34830"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/34830","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask","abstract":"Control of a Naval construction project is a significant and difficult problem. Project complexity, and contract type, military urgency, and contractor identity affect the degree and type of control necessary. This thesis discusses a summary of essential guidance for performance of functions; the interdependency of cost, quality, time, and performance; and a survey of techniques and methods for managing each of these parameters. A naval construction project can be one of the most difficult problems to manage and evaluate. This is largely due to the difficulty of measuring performance and its interaction with cost, quality, and time. In managing the performance, the results will vary according to the different forms, such as contract administration, formal views, financial and engineering reports, quality assurance and various status indexes.","abstract_html":"Control of a Naval construction project is a significant and difficult problem. Project complexity, and contract type, military urgency, and contractor identity affect the degree and type of control necessary. This thesis discusses a summary of essential guidance for performance of functions; the interdependency of cost, quality, time, and performance; and a survey of techniques and methods for managing each of these parameters. A naval construction project can be one of the most difficult problems to manage and evaluate. This is largely due to the difficulty of measuring performance and its interaction with cost, quality, and time. In managing the performance, the results will vary according to the different forms, such as contract administration, formal views, financial and engineering reports, quality assurance and various status indexes.","abstract_has_math":false,"creators":["Sideris, George"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Management","school":null,"contributors":[],"advisors":["Trietsch, Dan"],"committee_chairs":[],"committee_members":["Papoulias, Photis"],"year":1990,"date_issued":"1990-06","date_published":"1990-06","updated_at":"2026-11-19T06:33:31Z","subjects":["Shipbuilding","Quality control","Dissertations","Academic","Project management."],"languages":[],"rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/34830","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/34830","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F34830","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Trietsch, Dan"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Papoulias, Photis"]},{"key":"dc:contributor.department","label":"Department","values":["Management"]},{"key":"dc:creator","label":"Author","values":["Sideris, George"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1990-06"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-08-01T21:15:21Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-08-01T21:15:21Z"]},{"key":"dc:date.issued","label":"Date","values":["1990-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Project Management","Naval Construction-ship-building","Contract administration"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Shipbuilding","Quality control","Dissertations","Academic","Project management."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/34830"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Control of a Naval construction project is a significant and difficult problem. Project complexity, and contract type, military urgency, and contractor identity affect the degree and type of control necessary. This thesis discusses a summary of essential guidance for performance of functions; the interdependency of cost, quality, time, and performance; and a survey of techniques and methods for managing each of these parameters. A naval construction project can be one of the most difficult problems to manage and evaluate. This is largely due to the difficulty of measuring performance and its interaction with cost, quality, and time. In managing the performance, the results will vary according to the different forms, such as contract administration, formal views, financial and engineering reports, quality assurance and various status indexes."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/whatyoulwayswant1094534830"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["viii, 73 p."]},{"key":"dc:title","label":"Title","values":["What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, Hellenic Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Trietsch, Dan"],"dc:contributor.committeemember":["Papoulias, Photis"],"dc:contributor.department":["Management"],"dc:creator":["Sideris, George"],"dc:date":["1990-06"],"dc:date.accessioned":["2013-08-01T21:15:21Z"],"dc:date.available":["2013-08-01T21:15:21Z"],"dc:date.issued":["1990-06"],"dc:description.abstract":["Control of a Naval construction project is a significant and difficult problem. Project complexity, and contract type, military urgency, and contractor identity affect the degree and type of control necessary. This thesis discusses a summary of essential guidance for performance of functions; the interdependency of cost, quality, time, and performance; and a survey of techniques and methods for managing each of these parameters. A naval construction project can be one of the most difficult problems to manage and evaluate. This is largely due to the difficulty of measuring performance and its interaction with cost, quality, and time. In managing the performance, the results will vary according to the different forms, such as contract administration, formal views, financial and engineering reports, quality assurance and various status indexes."],"dc:description.uri":["http://archive.org/details/whatyoulwayswant1094534830"],"dc:format.extent":["viii, 73 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/34830"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Project Management","Naval Construction-ship-building","Contract administration"],"dc:subject.lcsh":["Shipbuilding","Quality control","Dissertations","Academic","Project management."],"dc:title":["What you always wanted to know about monitoring Naval Ship Construction but you did not dare ask"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, Hellenic Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:33:31Z"}