{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/35085"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/35085","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Public or private: the outsourcing dilemma within the Department of Defense","abstract":"This thesis investigates the outsourcing experience of Commander, U.S. Naval Air Force, Pacific Fleet's experience in implementing an outsourcing initiative as directed by the Chief of Naval Operations. Concerns regarding outsourcing identified are cost growth and administrative. Cost growth concerns include statutory wage rate increases for contractors; changes in contract requirements; deficiencies in written statement of contract requirements; poor contract administration and surveillance; and lack of competition for contracts among contractors. Administrative concerns include lack of contracting authority at the fleet level and loss of control of resources; reduced flexibility; profit motives of contractors; and potential of contractor corruption. Recommendations include determining exact requirements and stating them unambiguously in the contract; intensifying training for contractor administrators; factoring in the costs of oversight; ensuring that a competitive environment exists among contractors prior to outsourcing; and taking stringent precautions against contractor corruption.","abstract_html":"This thesis investigates the outsourcing experience of Commander, U.S. Naval Air Force, Pacific Fleet&#x27;s experience in implementing an outsourcing initiative as directed by the Chief of Naval Operations. Concerns regarding outsourcing identified are cost growth and administrative. Cost growth concerns include statutory wage rate increases for contractors; changes in contract requirements; deficiencies in written statement of contract requirements; poor contract administration and surveillance; and lack of competition for contracts among contractors. Administrative concerns include lack of contracting authority at the fleet level and loss of control of resources; reduced flexibility; profit motives of contractors; and potential of contractor corruption. Recommendations include determining exact requirements and stating them unambiguously in the contract; intensifying training for contractor administrators; factoring in the costs of oversight; ensuring that a competitive environment exists among contractors prior to outsourcing; and taking stringent precautions against contractor corruption.","abstract_has_math":false,"creators":["Snyder, Elizabeth A."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Management","school":null,"contributors":[],"advisors":["McCaffery, Jerry","Jones, Larry"],"committee_chairs":[],"committee_members":[],"year":1995,"date_issued":"1995-03","date_published":"1995-03","updated_at":"2026-11-26T00:13:06Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/35085","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/35085","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F35085","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F35085","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["McCaffery, Jerry","Jones, Larry"]},{"key":"dc:contributor.department","label":"Department","values":["Management"]},{"key":"dc:creator","label":"Author","values":["Snyder, Elizabeth A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["March 1995"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-08-13T22:06:25Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-08-13T22:06:25Z"]},{"key":"dc:date.issued","label":"Date","values":["1995-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/35085"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis investigates the outsourcing experience of Commander, U.S. Naval Air Force, Pacific Fleet's experience in implementing an outsourcing initiative as directed by the Chief of Naval Operations. Concerns regarding outsourcing identified are cost growth and administrative. Cost growth concerns include statutory wage rate increases for contractors; changes in contract requirements; deficiencies in written statement of contract requirements; poor contract administration and surveillance; and lack of competition for contracts among contractors. Administrative concerns include lack of contracting authority at the fleet level and loss of control of resources; reduced flexibility; profit motives of contractors; and potential of contractor corruption. Recommendations include determining exact requirements and stating them unambiguously in the contract; intensifying training for contractor administrators; factoring in the costs of oversight; ensuring that a competitive environment exists among contractors prior to outsourcing; and taking stringent precautions against contractor corruption."]},{"key":"dc:description.award","label":"Dc Description Award","values":["NA"]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["NA"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/publicorprivateo1094535085"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["77 p."]},{"key":"dc:title","label":"Title","values":["Public or private: the outsourcing dilemma within the Department of Defense"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Naval Reserve (U.S.N.R.) author."]}]}],"canonical_facts":{"dc:contributor.advisor":["McCaffery, Jerry","Jones, Larry"],"dc:contributor.department":["Management"],"dc:creator":["Snyder, Elizabeth A."],"dc:date":["March 1995"],"dc:date.accessioned":["2013-08-13T22:06:25Z"],"dc:date.available":["2013-08-13T22:06:25Z"],"dc:date.issued":["1995-03"],"dc:description.abstract":["This thesis investigates the outsourcing experience of Commander, U.S. Naval Air Force, Pacific Fleet's experience in implementing an outsourcing initiative as directed by the Chief of Naval Operations. Concerns regarding outsourcing identified are cost growth and administrative. Cost growth concerns include statutory wage rate increases for contractors; changes in contract requirements; deficiencies in written statement of contract requirements; poor contract administration and surveillance; and lack of competition for contracts among contractors. Administrative concerns include lack of contracting authority at the fleet level and loss of control of resources; reduced flexibility; profit motives of contractors; and potential of contractor corruption. Recommendations include determining exact requirements and stating them unambiguously in the contract; intensifying training for contractor administrators; factoring in the costs of oversight; ensuring that a competitive environment exists among contractors prior to outsourcing; and taking stringent precautions against contractor corruption."],"dc:description.award":["NA"],"dc:description.sponsorship":["NA"],"dc:description.uri":["http://archive.org/details/publicorprivateo1094535085"],"dc:format.extent":["77 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/35085"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Public or private: the outsourcing dilemma within the Department of Defense"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Naval Reserve (U.S.N.R.) author."],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:13:06Z"}