{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/35220"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/35220","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Base realignment and closure action scheduler (BRACAS)","abstract":"This thesis develops a mixed integer linear optimization model, BRACAS, to help construct optimal implementation schedules for base realignment and closure actions. Given a list of installations for realignment and closure, BRACAS maximizes the net present value of future savings less the one-time costs while satisfying yearly budget constraints. BRACAS provides insights on the adequacy of the budget and tradeoffs between budget and savings. Modeling issues that have impact on further use of the model such as solution persistence' and alternate computation of savings are examined. With solution persistence incorporated, BRACAS is capable of generating an optimal schedule that maintains continuity with a previous schedule. Between June and August 1995 BRACAS helped the Army Base Realignment and Closure Office determine budget levels and implementation schedules for the 1995 round of base realignments and closures.","abstract_html":"This thesis develops a mixed integer linear optimization model, BRACAS, to help construct optimal implementation schedules for base realignment and closure actions. Given a list of installations for realignment and closure, BRACAS maximizes the net present value of future savings less the one-time costs while satisfying yearly budget constraints. BRACAS provides insights on the adequacy of the budget and tradeoffs between budget and savings. Modeling issues that have impact on further use of the model such as solution persistence&#x27; and alternate computation of savings are examined. With solution persistence incorporated, BRACAS is capable of generating an optimal schedule that maintains continuity with a previous schedule. Between June and August 1995 BRACAS helped the Army Base Realignment and Closure Office determine budget levels and implementation schedules for the 1995 round of base realignments and closures.","abstract_has_math":false,"creators":["Wong, Chen-Guan"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research","school":null,"contributors":[],"advisors":["Bradley, Gordon H."],"committee_chairs":[],"committee_members":[],"year":1995,"date_issued":"1995-09","date_published":"1995-09","updated_at":"2026-11-21T23:24:54Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/35220","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/35220","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F35220","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F35220","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Bradley, Gordon H."]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research"]},{"key":"dc:creator","label":"Author","values":["Wong, Chen-Guan"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["September 1995"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-08-13T22:07:09Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-08-13T22:07:09Z"]},{"key":"dc:date.issued","label":"Date","values":["1995-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/35220"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis develops a mixed integer linear optimization model, BRACAS, to help construct optimal implementation schedules for base realignment and closure actions. Given a list of installations for realignment and closure, BRACAS maximizes the net present value of future savings less the one-time costs while satisfying yearly budget constraints. BRACAS provides insights on the adequacy of the budget and tradeoffs between budget and savings. Modeling issues that have impact on further use of the model such as solution persistence' and alternate computation of savings are examined. With solution persistence incorporated, BRACAS is capable of generating an optimal schedule that maintains continuity with a previous schedule. Between June and August 1995 BRACAS helped the Army Base Realignment and Closure Office determine budget levels and implementation schedules for the 1995 round of base realignments and closures."]},{"key":"dc:description.award","label":"Dc Description Award","values":["NA"]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["NA"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/baserealignmentn1094535220"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["49 p."]},{"key":"dc:title","label":"Title","values":["Base realignment and closure action scheduler (BRACAS)"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Singapore Army author."]}]}],"canonical_facts":{"dc:contributor.advisor":["Bradley, Gordon H."],"dc:contributor.department":["Operations Research"],"dc:creator":["Wong, Chen-Guan"],"dc:date":["September 1995"],"dc:date.accessioned":["2013-08-13T22:07:09Z"],"dc:date.available":["2013-08-13T22:07:09Z"],"dc:date.issued":["1995-09"],"dc:description.abstract":["This thesis develops a mixed integer linear optimization model, BRACAS, to help construct optimal implementation schedules for base realignment and closure actions. Given a list of installations for realignment and closure, BRACAS maximizes the net present value of future savings less the one-time costs while satisfying yearly budget constraints. BRACAS provides insights on the adequacy of the budget and tradeoffs between budget and savings. Modeling issues that have impact on further use of the model such as solution persistence' and alternate computation of savings are examined. With solution persistence incorporated, BRACAS is capable of generating an optimal schedule that maintains continuity with a previous schedule. Between June and August 1995 BRACAS helped the Army Base Realignment and Closure Office determine budget levels and implementation schedules for the 1995 round of base realignments and closures."],"dc:description.award":["NA"],"dc:description.sponsorship":["NA"],"dc:description.uri":["http://archive.org/details/baserealignmentn1094535220"],"dc:format.extent":["49 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/35220"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Base realignment and closure action scheduler (BRACAS)"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Singapore Army author."],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T23:24:54Z"}