{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/3527"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/3527","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An analysis of the requisition process and readiness for F/A-18E/F Integrated Readiness Support Team (FIRST) program","abstract":"Naval Aviation is beginning a transformation into a new era of logistics support. The beginning of a U.S. Navy/Industry teaming effort started with the U.S. Navy's F/A-18 E/F program. The new aircraft is supported through both standard military logistics programs and a brand new commercial logistics application known as F/A-18 E/F Integrated Readiness Support Teaming (FIRST). The non-traditional contract with Boeing is intended to outsource some maintenance, supply and inventory control for the new aircraft onto Boeing. The intended benefits behind the new concept include reduced costs, increased supply responsiveness and greater efficiency through commercial logistics applications. Promising increased aircraft readiness and seamless implementation, both Boeing and U.S. Navy representatives have great expectations for the new system. Our research investigates the impact FIRST is having on F/A-18 E/F Operational Availability (Ao) through an evaluation of Supply Response Times (SRT) and actual squadron Mission Capability Rates for the period of 01 April 2002 through 30 June 2002. Our results suggest that although repairable parts are currently delivered more quickly through the FIRST program, the contract measurement of SRT may not reflect any long term improvements in F/A-18 E/F readiness.","abstract_html":"Naval Aviation is beginning a transformation into a new era of logistics support. The beginning of a U.S. Navy/Industry teaming effort started with the U.S. Navy&#x27;s F/A-18 E/F program. The new aircraft is supported through both standard military logistics programs and a brand new commercial logistics application known as F/A-18 E/F Integrated Readiness Support Teaming (FIRST). The non-traditional contract with Boeing is intended to outsource some maintenance, supply and inventory control for the new aircraft onto Boeing. The intended benefits behind the new concept include reduced costs, increased supply responsiveness and greater efficiency through commercial logistics applications. Promising increased aircraft readiness and seamless implementation, both Boeing and U.S. Navy representatives have great expectations for the new system. Our research investigates the impact FIRST is having on F/A-18 E/F Operational Availability (Ao) through an evaluation of Supply Response Times (SRT) and actual squadron Mission Capability Rates for the period of 01 April 2002 through 30 June 2002. Our results suggest that although repairable parts are currently delivered more quickly through the FIRST program, the contract measurement of SRT may not reflect any long term improvements in F/A-18 E/F readiness.","abstract_has_math":false,"creators":["Simonson, Bernard L.","Noll, Daniel J."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Eaton, Don","Gates, Bill"],"committee_chairs":[],"committee_members":[],"year":2002,"date_issued":"2002-12","date_published":"2002-12","updated_at":"2026-11-19T06:33:48Z","subjects":["Logistics, Naval","Logistics","Contracting out"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/3527","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/3527","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F3527","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F3527","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Eaton, Don","Gates, Bill"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Simonson, Bernard L.","Noll, Daniel J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:38:37Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:38:37Z"]},{"key":"dc:date.issued","label":"Date","values":["2002-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Logistics","F/A-18 E/F","FIRST","Performance Metrics","Readiness","Operational Availability","Outsourcing"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Logistics, Naval","Logistics","Contracting out"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/3527"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Naval Aviation is beginning a transformation into a new era of logistics support. The beginning of a U.S. Navy/Industry teaming effort started with the U.S. Navy's F/A-18 E/F program. The new aircraft is supported through both standard military logistics programs and a brand new commercial logistics application known as F/A-18 E/F Integrated Readiness Support Teaming (FIRST). The non-traditional contract with Boeing is intended to outsource some maintenance, supply and inventory control for the new aircraft onto Boeing. The intended benefits behind the new concept include reduced costs, increased supply responsiveness and greater efficiency through commercial logistics applications. Promising increased aircraft readiness and seamless implementation, both Boeing and U.S. Navy representatives have great expectations for the new system. Our research investigates the impact FIRST is having on F/A-18 E/F Operational Availability (Ao) through an evaluation of Supply Response Times (SRT) and actual squadron Mission Capability Rates for the period of 01 April 2002 through 30 June 2002. Our results suggest that although repairable parts are currently delivered more quickly through the FIRST program, the contract measurement of SRT may not reflect any long term improvements in F/A-18 E/F readiness."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/annalysisofrequi109453527"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xx, 45 p. : col. ill."]},{"key":"dc:title","label":"Title","values":["An analysis of the requisition process and readiness for F/A-18E/F Integrated Readiness Support Team (FIRST) program"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy","Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Eaton, Don","Gates, Bill"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Simonson, Bernard L.","Noll, Daniel J."],"dc:date.accessioned":["2012-03-14T17:38:37Z"],"dc:date.available":["2012-03-14T17:38:37Z"],"dc:date.issued":["2002-12"],"dc:description.abstract":["Naval Aviation is beginning a transformation into a new era of logistics support. The beginning of a U.S. Navy/Industry teaming effort started with the U.S. Navy's F/A-18 E/F program. The new aircraft is supported through both standard military logistics programs and a brand new commercial logistics application known as F/A-18 E/F Integrated Readiness Support Teaming (FIRST). The non-traditional contract with Boeing is intended to outsource some maintenance, supply and inventory control for the new aircraft onto Boeing. The intended benefits behind the new concept include reduced costs, increased supply responsiveness and greater efficiency through commercial logistics applications. Promising increased aircraft readiness and seamless implementation, both Boeing and U.S. Navy representatives have great expectations for the new system. Our research investigates the impact FIRST is having on F/A-18 E/F Operational Availability (Ao) through an evaluation of Supply Response Times (SRT) and actual squadron Mission Capability Rates for the period of 01 April 2002 through 30 June 2002. Our results suggest that although repairable parts are currently delivered more quickly through the FIRST program, the contract measurement of SRT may not reflect any long term improvements in F/A-18 E/F readiness."],"dc:description.uri":["http://archive.org/details/annalysisofrequi109453527"],"dc:format.extent":["xx, 45 p. : col. ill."],"dc:identifier.uri":["https://hdl.handle.net/10945/3527"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Logistics","F/A-18 E/F","FIRST","Performance Metrics","Readiness","Operational Availability","Outsourcing"],"dc:subject.lcsh":["Logistics, Naval","Logistics","Contracting out"],"dc:title":["An analysis of the requisition process and readiness for F/A-18E/F Integrated Readiness Support Team (FIRST) program"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy","Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:33:48Z"}