{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/37705"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/37705","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Small Tactical Unmanned Aerial System (STUAS) Rapid Integration and fielding process (RAIN)","abstract":"The Department of the Navy (DoN) maintains an inventory of Small Tactical Unmanned Aircraft Systems (STUAS). These systems are designed for payload modularity to support user selection of multiple mission configurations in order to meet any unique mission need. Numerous mission ready payloads have been developed for each system, and only need to be integrated in order to become part of the fielded unmanned aerial system (UAS) configuration. Unfortunately, the DoN does not have a method that maintains sufficient systems engineering (SE) discipline to rapidly integrate and field new mission configurations to the fleet in support of aggressive schedules and urgent user needs. The typical fielding time frame can range from 24 to 36 months, instead of the desired 6 to 18 months. Furthermore, without a sufficient SE approach, risk to mission success is not well understood. This paper captures all applicable requirements for fielding a new capability onto an existing UAS, and using an SE approach, outlines a process to rapidly integrate payloads DoN system. The process identified provides a comprehensive list of integration requirements; a cost, schedule, and performance trade-off analysis; technical risk associated with each tradeoff option; and recommendations on how to best support a rapid fielding timeline.","abstract_html":"The Department of the Navy (DoN) maintains an inventory of Small Tactical Unmanned Aircraft Systems (STUAS). These systems are designed for payload modularity to support user selection of multiple mission configurations in order to meet any unique mission need. Numerous mission ready payloads have been developed for each system, and only need to be integrated in order to become part of the fielded unmanned aerial system (UAS) configuration. Unfortunately, the DoN does not have a method that maintains sufficient systems engineering (SE) discipline to rapidly integrate and field new mission configurations to the fleet in support of aggressive schedules and urgent user needs. The typical fielding time frame can range from 24 to 36 months, instead of the desired 6 to 18 months. Furthermore, without a sufficient SE approach, risk to mission success is not well understood. This paper captures all applicable requirements for fielding a new capability onto an existing UAS, and using an SE approach, outlines a process to rapidly integrate payloads DoN system. The process identified provides a comprehensive list of integration requirements; a cost, schedule, and performance trade-off analysis; technical risk associated with each tradeoff option; and recommendations on how to best support a rapid fielding timeline.","abstract_has_math":false,"creators":["Ironhill, Christopher","Otis, Bryan","Lancaster, Frederick","Perez, Angel","Ly, Diana","Tran, Nam"],"institution":"Monterey, California: Naval Postgraduate School","degree_name":"Master Of Science In Systems Engineering","degree_level":"Masters","degree_discipline":"Systems Engineering","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Gehris, Rama","Young, Bonnie"],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013-09","date_published":"2013-09","updated_at":"2026-11-19T06:34:01Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/37705","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/37705","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F37705","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Gehris, Rama","Young, Bonnie"]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["Ironhill, Christopher","Otis, Bryan","Lancaster, Frederick","Perez, Angel","Ly, Diana","Tran, Nam"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["Sep-13"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-11-20T23:36:27Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-11-20T23:36:27Z"]},{"key":"dc:date.issued","label":"Date","values":["2013-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California: Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Systems Engineering Capstone Project Reports"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["aad5eb3c-9f14-4b68-99ea-1a8c4ae89650"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master Of Science In Systems Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Systems engineering","UAV","UAS","rapid fielding","timeline reduction","modeling","simulation","cost","performance","schedule."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/37705"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["SYSTEMS ENGINEERING CAPSTONE PROJECT REPORT"]},{"key":"dc:description.abstract","label":"Abstract","values":["The Department of the Navy (DoN) maintains an inventory of Small Tactical Unmanned Aircraft Systems (STUAS). These systems are designed for payload modularity to support user selection of multiple mission configurations in order to meet any unique mission need. Numerous mission ready payloads have been developed for each system, and only need to be integrated in order to become part of the fielded unmanned aerial system (UAS) configuration. Unfortunately, the DoN does not have a method that maintains sufficient systems engineering (SE) discipline to rapidly integrate and field new mission configurations to the fleet in support of aggressive schedules and urgent user needs. The typical fielding time frame can range from 24 to 36 months, instead of the desired 6 to 18 months. Furthermore, without a sufficient SE approach, risk to mission success is not well understood. This paper captures all applicable requirements for fielding a new capability onto an existing UAS, and using an SE approach, outlines a process to rapidly integrate payloads DoN system. The process identified provides a comprehensive list of integration requirements; a cost, schedule, and performance trade-off analysis; technical risk associated with each tradeoff option; and recommendations on how to best support a rapid fielding timeline."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/smalltacticalunm1094537705"]},{"key":"dc:title","label":"Title","values":["Small Tactical Unmanned Aerial System (STUAS) Rapid Integration and fielding process (RAIN)"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Gehris, Rama","Young, Bonnie"],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["Ironhill, Christopher","Otis, Bryan","Lancaster, Frederick","Perez, Angel","Ly, Diana","Tran, Nam"],"dc:date":["Sep-13"],"dc:date.accessioned":["2013-11-20T23:36:27Z"],"dc:date.available":["2013-11-20T23:36:27Z"],"dc:date.issued":["2013-09"],"dc:description":["SYSTEMS ENGINEERING CAPSTONE PROJECT REPORT"],"dc:description.abstract":["The Department of the Navy (DoN) maintains an inventory of Small Tactical Unmanned Aircraft Systems (STUAS). These systems are designed for payload modularity to support user selection of multiple mission configurations in order to meet any unique mission need. Numerous mission ready payloads have been developed for each system, and only need to be integrated in order to become part of the fielded unmanned aerial system (UAS) configuration. Unfortunately, the DoN does not have a method that maintains sufficient systems engineering (SE) discipline to rapidly integrate and field new mission configurations to the fleet in support of aggressive schedules and urgent user needs. The typical fielding time frame can range from 24 to 36 months, instead of the desired 6 to 18 months. Furthermore, without a sufficient SE approach, risk to mission success is not well understood. This paper captures all applicable requirements for fielding a new capability onto an existing UAS, and using an SE approach, outlines a process to rapidly integrate payloads DoN system. The process identified provides a comprehensive list of integration requirements; a cost, schedule, and performance trade-off analysis; technical risk associated with each tradeoff option; and recommendations on how to best support a rapid fielding timeline."],"dc:description.uri":["http://archive.org/details/smalltacticalunm1094537705"],"dc:identifier.uri":["https://hdl.handle.net/10945/37705"],"dc:publisher":["Monterey, California: Naval Postgraduate School"],"dc:relation.ispartofseries":["Systems Engineering Capstone Project Reports"],"dc:relation.seriesentity":["aad5eb3c-9f14-4b68-99ea-1a8c4ae89650"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Systems engineering","UAV","UAS","rapid fielding","timeline reduction","modeling","simulation","cost","performance","schedule."],"dc:title":["Small Tactical Unmanned Aerial System (STUAS) Rapid Integration and fielding process (RAIN)"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Systems Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master Of Science In Systems Engineering"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:34:01Z"}