{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/38043"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/38043","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An analysis of the United States Air Force Energy Saving Performance Contracts","abstract":"The purpose of this paper is to explore the use of Enerrgy Saving Performance Contracts (ESPC) within the Department of Defense, focusing on the United States Air Force's utility and energy acquisition. The significant value of the ESPC is its alternative financing mechanism that authorizes Federal facilities regionalization without upfront investments. The paper focuses on Dyess Air Force Base's ESPC, as Dyess's benchmarking ESPC was selected for the Presidential Award recognition for Leadership in Federal Energy Management. The six major contracting processes within the three main management levels encompass many of the best-preactice characteristics. The interviews referenced herein with the service end-users, both the regional and local contracting officers, allow the reader to further understand how the Integrated Product Team's significant efforts resulted in a successful ESPC.","abstract_html":"The purpose of this paper is to explore the use of Enerrgy Saving Performance Contracts (ESPC) within the Department of Defense, focusing on the United States Air Force&#x27;s utility and energy acquisition. The significant value of the ESPC is its alternative financing mechanism that authorizes Federal facilities regionalization without upfront investments. The paper focuses on Dyess Air Force Base&#x27;s ESPC, as Dyess&#x27;s benchmarking ESPC was selected for the Presidential Award recognition for Leadership in Federal Energy Management. The six major contracting processes within the three main management levels encompass many of the best-preactice characteristics. The interviews referenced herein with the service end-users, both the regional and local contracting officers, allow the reader to further understand how the Integrated Product Team&#x27;s significant efforts resulted in a successful ESPC.","abstract_has_math":false,"creators":["President, Wai"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Adminstration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Rendon, Rene","Hudgens, Bryan"],"committee_chairs":[],"committee_members":[],"year":2007,"date_issued":"2007-12","date_published":"2007-12","updated_at":"2026-11-24T23:53:55Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. As such, it is in the public domain, and under the provisions of Title 17, United States Code, Section 105, may not be copyrighted.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/38043","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/38043","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F38043","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F38043","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Rendon, Rene","Hudgens, Bryan"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["President, Wai"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-12-19T18:13:20Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-12-19T18:13:20Z"]},{"key":"dc:date.issued","label":"Date","values":["2007-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["6855896f-0800-4ea9-9d08-79cbe76c9d8f","af55f39b-c171-452f-90aa-49db2d1b9dc0"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Adminstration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Energy Savings Performance Contracts"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. As such, it is in the public domain, and under the provisions of Title 17, United States Code, Section 105, may not be copyrighted.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/38043"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this paper is to explore the use of Enerrgy Saving Performance Contracts (ESPC) within the Department of Defense, focusing on the United States Air Force's utility and energy acquisition. The significant value of the ESPC is its alternative financing mechanism that authorizes Federal facilities regionalization without upfront investments. The paper focuses on Dyess Air Force Base's ESPC, as Dyess's benchmarking ESPC was selected for the Presidential Award recognition for Leadership in Federal Energy Management. The six major contracting processes within the three main management levels encompass many of the best-preactice characteristics. The interviews referenced herein with the service end-users, both the regional and local contracting officers, allow the reader to further understand how the Integrated Product Team's significant efforts resulted in a successful ESPC."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/annalysisofunite1094538043"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["91 p."]},{"key":"dc:title","label":"Title","values":["An analysis of the United States Air Force Energy Saving Performance Contracts"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Rendon, Rene","Hudgens, Bryan"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["President, Wai"],"dc:date.accessioned":["2013-12-19T18:13:20Z"],"dc:date.available":["2013-12-19T18:13:20Z"],"dc:date.issued":["2007-12"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["The purpose of this paper is to explore the use of Enerrgy Saving Performance Contracts (ESPC) within the Department of Defense, focusing on the United States Air Force's utility and energy acquisition. The significant value of the ESPC is its alternative financing mechanism that authorizes Federal facilities regionalization without upfront investments. The paper focuses on Dyess Air Force Base's ESPC, as Dyess's benchmarking ESPC was selected for the Presidential Award recognition for Leadership in Federal Energy Management. The six major contracting processes within the three main management levels encompass many of the best-preactice characteristics. The interviews referenced herein with the service end-users, both the regional and local contracting officers, allow the reader to further understand how the Integrated Product Team's significant efforts resulted in a successful ESPC."],"dc:description.uri":["http://archive.org/details/annalysisofunite1094538043"],"dc:format.extent":["91 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/38043"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.advisorentity":["6855896f-0800-4ea9-9d08-79cbe76c9d8f","af55f39b-c171-452f-90aa-49db2d1b9dc0"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. As such, it is in the public domain, and under the provisions of Title 17, United States Code, Section 105, may not be copyrighted.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Energy Savings Performance Contracts"],"dc:title":["An analysis of the United States Air Force Energy Saving Performance Contracts"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Adminstration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-24T23:53:55Z"}