{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/3915"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/3915","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Improving the U.S. Navy's execution of technical authority through a common risk management and technical assessment process","abstract":"The focus of this paper is on improving the U.S. Navy's execution of technical authority. 1. Technical authority targets compliance with technical criteria and standards. 2. This targeting must be done at the earliest stages of program development and addressed during development of the program acquisition strategy. 3. An executable acquisition strategy must take into consideration the Navy's technical authority responsibility. 4. A successful strategy needs to provide the industry sufficient time to fully develop plans and deliver products, especially in high-risk program areas, and incorporate a system engineering process where the technical authorities can perform their mission. 5. History has shown that costs will increase if technical risks are not adequately addressed. The purpose of this focus -- on improving execution of technical authority -- is to reduce exposure to risks and costs. This thesis defines the relationship between program authority and technical authority, and improves the state of technical authority through common policy development and implementation.","abstract_html":"The focus of this paper is on improving the U.S. Navy&#x27;s execution of technical authority. 1. Technical authority targets compliance with technical criteria and standards. 2. This targeting must be done at the earliest stages of program development and addressed during development of the program acquisition strategy. 3. An executable acquisition strategy must take into consideration the Navy&#x27;s technical authority responsibility. 4. A successful strategy needs to provide the industry sufficient time to fully develop plans and deliver products, especially in high-risk program areas, and incorporate a system engineering process where the technical authorities can perform their mission. 5. History has shown that costs will increase if technical risks are not adequately addressed. The purpose of this focus -- on improving execution of technical authority -- is to reduce exposure to risks and costs. This thesis defines the relationship between program authority and technical authority, and improves the state of technical authority through common policy development and implementation.","abstract_has_math":false,"creators":["Tomaiko, Thomas Andrew"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Systems Engineering Management","degree_level":"Masters","degree_discipline":"Systems Engineering Management","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Matthews, David F.","Roberts, Benjamin J."],"committee_chairs":[],"committee_members":[],"year":2008,"date_issued":"2008-09","date_published":"2008-09","updated_at":"2026-11-19T06:34:19Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["269676482"],"render_values":[{"text":"269676482","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/3915","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/3915","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F3915","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Matthews, David F.","Roberts, Benjamin J."]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["Tomaiko, Thomas Andrew"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:39:45Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:39:45Z"]},{"key":"dc:date.issued","label":"Date","values":["2008-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["73c095de-fa3b-4d63-8300-9b6aee5b4d62"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Systems Engineering Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["technical authority","risk management","common risk management process","technical assessment","technical assessment process","risk analysis","systems engineering","systems engineering management","systems engineering process","program management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["269676482"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/3915"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The focus of this paper is on improving the U.S. Navy's execution of technical authority. 1. Technical authority targets compliance with technical criteria and standards. 2. This targeting must be done at the earliest stages of program development and addressed during development of the program acquisition strategy. 3. An executable acquisition strategy must take into consideration the Navy's technical authority responsibility. 4. A successful strategy needs to provide the industry sufficient time to fully develop plans and deliver products, especially in high-risk program areas, and incorporate a system engineering process where the technical authorities can perform their mission. 5. History has shown that costs will increase if technical risks are not adequately addressed. The purpose of this focus -- on improving execution of technical authority -- is to reduce exposure to risks and costs. This thesis defines the relationship between program authority and technical authority, and improves the state of technical authority through common policy development and implementation."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/improvingusnavys109453915"]},{"key":"dc:title","label":"Title","values":["Improving the U.S. Navy's execution of technical authority through a common risk management and technical assessment process"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Commander, United States Navy (Retired)"]}]}],"canonical_facts":{"dc:contributor.advisor":["Matthews, David F.","Roberts, Benjamin J."],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["Tomaiko, Thomas Andrew"],"dc:date.accessioned":["2012-03-14T17:39:45Z"],"dc:date.available":["2012-03-14T17:39:45Z"],"dc:date.issued":["2008-09"],"dc:description.abstract":["The focus of this paper is on improving the U.S. Navy's execution of technical authority. 1. Technical authority targets compliance with technical criteria and standards. 2. This targeting must be done at the earliest stages of program development and addressed during development of the program acquisition strategy. 3. An executable acquisition strategy must take into consideration the Navy's technical authority responsibility. 4. A successful strategy needs to provide the industry sufficient time to fully develop plans and deliver products, especially in high-risk program areas, and incorporate a system engineering process where the technical authorities can perform their mission. 5. History has shown that costs will increase if technical risks are not adequately addressed. The purpose of this focus -- on improving execution of technical authority -- is to reduce exposure to risks and costs. This thesis defines the relationship between program authority and technical authority, and improves the state of technical authority through common policy development and implementation."],"dc:description.uri":["http://archive.org/details/improvingusnavys109453915"],"dc:identifier.oclc":["269676482"],"dc:identifier.uri":["https://hdl.handle.net/10945/3915"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["73c095de-fa3b-4d63-8300-9b6aee5b4d62"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["technical authority","risk management","common risk management process","technical assessment","technical assessment process","risk analysis","systems engineering","systems engineering management","systems engineering process","program management"],"dc:title":["Improving the U.S. Navy's execution of technical authority through a common risk management and technical assessment process"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Commander, United States Navy (Retired)"],"thesis:degree_discipline":["Systems Engineering Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Systems Engineering Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:34:19Z"}