{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/39308"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/39308","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Partnering in the public sector","abstract":"The decade of the 1990's saw the advent of a new attitude in Government contracting. After witnessing several high-profile success stories such as constructing the Atlanta Olympic Park, the Government embraced the concept of Partnering as a primary method of contract administration. The private sector consistently demonstrated an ability to contract for services while realizing a marked decrease in claims and litigation costs with Partnering. Their success was founded in the building of trust within the project team by creating a common bond between previously dissociated parties. This was achieved by each party developing a mutual understanding of the other parties' interests and goals in the project while maintaining a team focus on an ultimate goal of a successful contract. The Government espied Partnering as a way to improve their relationships with contractors and reduce the volume of litigation that seemed to only be increasing in the industry. The Government began a paradigm shift by instilling a new attitude of openness and communication with contractors as well as implementing several contract administration changes. This paper examines the process of Partnering, its key elements and core competencies, and how various agencies apply these principles in their construction management. The paper further researches what goals these organizations have when entering a Partnering relationship and what barriers currently prevent the process from working effectively.","abstract_html":"The decade of the 1990&#x27;s saw the advent of a new attitude in Government contracting. After witnessing several high-profile success stories such as constructing the Atlanta Olympic Park, the Government embraced the concept of Partnering as a primary method of contract administration. The private sector consistently demonstrated an ability to contract for services while realizing a marked decrease in claims and litigation costs with Partnering. Their success was founded in the building of trust within the project team by creating a common bond between previously dissociated parties. This was achieved by each party developing a mutual understanding of the other parties&#x27; interests and goals in the project while maintaining a team focus on an ultimate goal of a successful contract. The Government espied Partnering as a way to improve their relationships with contractors and reduce the volume of litigation that seemed to only be increasing in the industry. The Government began a paradigm shift by instilling a new attitude of openness and communication with contractors as well as implementing several contract administration changes. This paper examines the process of Partnering, its key elements and core competencies, and how various agencies apply these principles in their construction management. The paper further researches what goals these organizations have when entering a Partnering relationship and what barriers currently prevent the process from working effectively.","abstract_has_math":false,"creators":["Sheedy, William Malcolm"],"institution":"University of Florida","degree_name":"Master of Engineering","degree_level":"Masters","degree_discipline":"Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1997,"date_issued":"1997","date_published":"1997","updated_at":"2026-11-19T06:34:19Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/39308","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/39308","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F39308","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Sheedy, William Malcolm"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-06T23:35:32Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-06T23:35:32Z"]},{"key":"dc:date.issued","label":"Date","values":["1997"]},{"key":"dc:publisher","label":"Institution","values":["University of Florida"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Florida"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/39308"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The decade of the 1990's saw the advent of a new attitude in Government contracting. After witnessing several high-profile success stories such as constructing the Atlanta Olympic Park, the Government embraced the concept of Partnering as a primary method of contract administration. The private sector consistently demonstrated an ability to contract for services while realizing a marked decrease in claims and litigation costs with Partnering. Their success was founded in the building of trust within the project team by creating a common bond between previously dissociated parties. This was achieved by each party developing a mutual understanding of the other parties' interests and goals in the project while maintaining a team focus on an ultimate goal of a successful contract. The Government espied Partnering as a way to improve their relationships with contractors and reduce the volume of litigation that seemed to only be increasing in the industry. The Government began a paradigm shift by instilling a new attitude of openness and communication with contractors as well as implementing several contract administration changes. This paper examines the process of Partnering, its key elements and core competencies, and how various agencies apply these principles in their construction management. The paper further researches what goals these organizations have when entering a Partnering relationship and what barriers currently prevent the process from working effectively."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/partneringinpubl1094539308"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["59 p."]},{"key":"dc:title","label":"Title","values":["Partnering in the public sector"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, Civil Engineer Corps, United States Navy"]}]}],"canonical_facts":{"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Sheedy, William Malcolm"],"dc:date.accessioned":["2014-03-06T23:35:32Z"],"dc:date.available":["2014-03-06T23:35:32Z"],"dc:date.issued":["1997"],"dc:description.abstract":["The decade of the 1990's saw the advent of a new attitude in Government contracting. After witnessing several high-profile success stories such as constructing the Atlanta Olympic Park, the Government embraced the concept of Partnering as a primary method of contract administration. The private sector consistently demonstrated an ability to contract for services while realizing a marked decrease in claims and litigation costs with Partnering. Their success was founded in the building of trust within the project team by creating a common bond between previously dissociated parties. This was achieved by each party developing a mutual understanding of the other parties' interests and goals in the project while maintaining a team focus on an ultimate goal of a successful contract. The Government espied Partnering as a way to improve their relationships with contractors and reduce the volume of litigation that seemed to only be increasing in the industry. The Government began a paradigm shift by instilling a new attitude of openness and communication with contractors as well as implementing several contract administration changes. This paper examines the process of Partnering, its key elements and core competencies, and how various agencies apply these principles in their construction management. The paper further researches what goals these organizations have when entering a Partnering relationship and what barriers currently prevent the process from working effectively."],"dc:description.uri":["http://archive.org/details/partneringinpubl1094539308"],"dc:format.extent":["59 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/39308"],"dc:publisher":["University of Florida"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:title":["Partnering in the public sector"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, Civil Engineer Corps, United States Navy"],"thesis:degree_discipline":["Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Engineering"],"thesis:institution_name":["University of Florida"]},"updated_at":"2026-11-19T06:34:19Z"}