{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/3942"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/3942","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Adjusting to random demands of patient care a predictive model for nursing staff scheduling at Naval Medical Center San Diego","abstract":"In this thesis, time series methods were used to forecast the monthly number of nursing Full Time Equivalents (FTEs) required to meet patient care needs at Naval Medical Center San Diego. In order to capture both patient census and patient acuities, the monthly total required workload hours given by the Res-Q system was used. The monthly number of nursing FTEs was calculated by dividing the total monthly workload hours required by 168 hours (per DoD 6010.13-M). The Holt-Winters' time series models were fit using both Excel and JMP software packages. Using three years of historical data to fit the models, the number of nursing FTEs that would be required every month for the fiscal year 2008 for the entire hospital was forecasted with a Mean Absolute Percentage Error (MAPE) of 17.83. Fitting the model to data starting from December 2005, to eliminate historical anomalies, further reduced the MAPE to 8.80. The overall model was, subsequently, partitioned into five sub-models, one for each of the five nursing units, reflecting the hospital's patient and nursing staff mixes. Again after adjusting for missing data points and outliers, the monthly number of nursing FTEs required for 4West, Adult ICU, Surgical, Medical, and Medical Oncology were forecasted with MAPE's of 20.77, 11.42, 13.63, 13.85, and 6.98, respectively.","abstract_html":"In this thesis, time series methods were used to forecast the monthly number of nursing Full Time Equivalents (FTEs) required to meet patient care needs at Naval Medical Center San Diego. In order to capture both patient census and patient acuities, the monthly total required workload hours given by the Res-Q system was used. The monthly number of nursing FTEs was calculated by dividing the total monthly workload hours required by 168 hours (per DoD 6010.13-M). The Holt-Winters&#x27; time series models were fit using both Excel and JMP software packages. Using three years of historical data to fit the models, the number of nursing FTEs that would be required every month for the fiscal year 2008 for the entire hospital was forecasted with a Mean Absolute Percentage Error (MAPE) of 17.83. Fitting the model to data starting from December 2005, to eliminate historical anomalies, further reduced the MAPE to 8.80. The overall model was, subsequently, partitioned into five sub-models, one for each of the five nursing units, reflecting the hospital&#x27;s patient and nursing staff mixes. Again after adjusting for missing data points and outliers, the monthly number of nursing FTEs required for 4West, Adult ICU, Surgical, Medical, and Medical Oncology were forecasted with MAPE&#x27;s of 20.77, 11.42, 13.63, 13.85, and 6.98, respectively.","abstract_has_math":false,"creators":["Chery, Joseph Erol."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S.","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research (OR)","school":null,"contributors":[],"advisors":["Fricker, Ronald D."],"committee_chairs":[],"committee_members":["Whitaker, Lyn R."],"year":2008,"date_issued":"2008-09","date_published":"2008-09","updated_at":"2026-11-19T06:34:19Z","subjects":["Hospital utilization","Length of stay"],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["269386983"],"render_values":[{"text":"269386983","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/3942","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/3942","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F3942","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Fricker, Ronald D."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Whitaker, Lyn R."]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research (OR)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Chery, Joseph Erol."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:39:51Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:39:51Z"]},{"key":"dc:date.issued","label":"Date","values":["2008-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Hospital utilization","Length of stay"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["269386983"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/3942"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["In this thesis, time series methods were used to forecast the monthly number of nursing Full Time Equivalents (FTEs) required to meet patient care needs at Naval Medical Center San Diego. In order to capture both patient census and patient acuities, the monthly total required workload hours given by the Res-Q system was used. The monthly number of nursing FTEs was calculated by dividing the total monthly workload hours required by 168 hours (per DoD 6010.13-M). The Holt-Winters' time series models were fit using both Excel and JMP software packages. Using three years of historical data to fit the models, the number of nursing FTEs that would be required every month for the fiscal year 2008 for the entire hospital was forecasted with a Mean Absolute Percentage Error (MAPE) of 17.83. Fitting the model to data starting from December 2005, to eliminate historical anomalies, further reduced the MAPE to 8.80. The overall model was, subsequently, partitioned into five sub-models, one for each of the five nursing units, reflecting the hospital's patient and nursing staff mixes. Again after adjusting for missing data points and outliers, the monthly number of nursing FTEs required for 4West, Adult ICU, Surgical, Medical, and Medical Oncology were forecasted with MAPE's of 20.77, 11.42, 13.63, 13.85, and 6.98, respectively."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/adjustingtorando109453942"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xvi, 47 p. ;"]},{"key":"dc:title","label":"Title","values":["Adjusting to random demands of patient care a predictive model for nursing staff scheduling at Naval Medical Center San Diego"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["US Navy (USN) author."]},{"key":"local:etd.verified","label":"Local Etd Verified","values":["no"]}]}],"canonical_facts":{"dc:contributor.advisor":["Fricker, Ronald D."],"dc:contributor.committeemember":["Whitaker, Lyn R."],"dc:contributor.department":["Operations Research (OR)"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Chery, Joseph Erol."],"dc:date.accessioned":["2012-03-14T17:39:51Z"],"dc:date.available":["2012-03-14T17:39:51Z"],"dc:date.issued":["2008-09"],"dc:description.abstract":["In this thesis, time series methods were used to forecast the monthly number of nursing Full Time Equivalents (FTEs) required to meet patient care needs at Naval Medical Center San Diego. In order to capture both patient census and patient acuities, the monthly total required workload hours given by the Res-Q system was used. The monthly number of nursing FTEs was calculated by dividing the total monthly workload hours required by 168 hours (per DoD 6010.13-M). The Holt-Winters' time series models were fit using both Excel and JMP software packages. Using three years of historical data to fit the models, the number of nursing FTEs that would be required every month for the fiscal year 2008 for the entire hospital was forecasted with a Mean Absolute Percentage Error (MAPE) of 17.83. Fitting the model to data starting from December 2005, to eliminate historical anomalies, further reduced the MAPE to 8.80. The overall model was, subsequently, partitioned into five sub-models, one for each of the five nursing units, reflecting the hospital's patient and nursing staff mixes. Again after adjusting for missing data points and outliers, the monthly number of nursing FTEs required for 4West, Adult ICU, Surgical, Medical, and Medical Oncology were forecasted with MAPE's of 20.77, 11.42, 13.63, 13.85, and 6.98, respectively."],"dc:description.uri":["http://archive.org/details/adjustingtorando109453942"],"dc:format.extent":["xvi, 47 p. ;"],"dc:identifier.oclc":["269386983"],"dc:identifier.uri":["https://hdl.handle.net/10945/3942"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.lcsh":["Hospital utilization","Length of stay"],"dc:title":["Adjusting to random demands of patient care a predictive model for nursing staff scheduling at Naval Medical Center San Diego"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["US Navy (USN) author."],"local:etd.verified":["no"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S."],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:34:19Z"}