{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/39658"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/39658","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Applying theory of constraints to an aircraft remanufacturing line","abstract":"Theory of Constraints (ToC) is a production philosophy seeking to globally optimize the manufacturer's constraints to meeting his business objective. The constraints to the Department of Defense (DOD) Naval Aviation Depot (NADEP) are: Unknown production resource requirements until aircraft disassembly and unscheduled production workloads due to unexpected high unit operational failure or unit modification. The thesis objective is to analyze the NADEP's remanufacturing process, determine areas that will benefit from the implementation of ToC, and then document managerial tools the depot level manager could use to globally optimize the remanufacturing process. The study focuses on the A-6 remanufacturing line at the NADEP, Alameda, CA. The thesis concludes ToC is a viable methodology, and with the use of Queuing Charts and Critical Resource Scheduling, the NADEP can meet its business objective of providing a cost effective remanufacturing capability to the DOD.","abstract_html":"Theory of Constraints (ToC) is a production philosophy seeking to globally optimize the manufacturer&#x27;s constraints to meeting his business objective. The constraints to the Department of Defense (DOD) Naval Aviation Depot (NADEP) are: Unknown production resource requirements until aircraft disassembly and unscheduled production workloads due to unexpected high unit operational failure or unit modification. The thesis objective is to analyze the NADEP&#x27;s remanufacturing process, determine areas that will benefit from the implementation of ToC, and then document managerial tools the depot level manager could use to globally optimize the remanufacturing process. The study focuses on the A-6 remanufacturing line at the NADEP, Alameda, CA. The thesis concludes ToC is a viable methodology, and with the use of Queuing Charts and Critical Resource Scheduling, the NADEP can meet its business objective of providing a cost effective remanufacturing capability to the DOD.","abstract_has_math":false,"creators":["Beck, James Michael."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Administrative Sciences","school":null,"contributors":[],"advisors":["Liao, Shu S.","Sarigul-Klijn, Martinus"],"committee_chairs":[],"committee_members":[],"year":1993,"date_issued":"1993-12","date_published":"1993-12","updated_at":"2026-11-21T22:38:54Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/39658","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/39658","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F39658","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F39658","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Liao, Shu S.","Sarigul-Klijn, Martinus"]},{"key":"dc:contributor.department","label":"Department","values":["Department of Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Beck, James Michael."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1993"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-26T23:22:40Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-26T23:22:40Z"]},{"key":"dc:date.issued","label":"Date","values":["1993-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Theory of constraints","Aircraft remanufacturing","NADEP","Critical resource scheduling","Queuing theory"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/39658"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Theory of Constraints (ToC) is a production philosophy seeking to globally optimize the manufacturer's constraints to meeting his business objective. The constraints to the Department of Defense (DOD) Naval Aviation Depot (NADEP) are: Unknown production resource requirements until aircraft disassembly and unscheduled production workloads due to unexpected high unit operational failure or unit modification. The thesis objective is to analyze the NADEP's remanufacturing process, determine areas that will benefit from the implementation of ToC, and then document managerial tools the depot level manager could use to globally optimize the remanufacturing process. The study focuses on the A-6 remanufacturing line at the NADEP, Alameda, CA. The thesis concludes ToC is a viable methodology, and with the use of Queuing Charts and Critical Resource Scheduling, the NADEP can meet its business objective of providing a cost effective remanufacturing capability to the DOD."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/applyingoryofcon1094539658"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["81 p."]},{"key":"dc:title","label":"Title","values":["Applying theory of constraints to an aircraft remanufacturing line"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Liao, Shu S.","Sarigul-Klijn, Martinus"],"dc:contributor.department":["Department of Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Beck, James Michael."],"dc:date":["December 1993"],"dc:date.accessioned":["2014-03-26T23:22:40Z"],"dc:date.available":["2014-03-26T23:22:40Z"],"dc:date.issued":["1993-12"],"dc:description.abstract":["Theory of Constraints (ToC) is a production philosophy seeking to globally optimize the manufacturer's constraints to meeting his business objective. The constraints to the Department of Defense (DOD) Naval Aviation Depot (NADEP) are: Unknown production resource requirements until aircraft disassembly and unscheduled production workloads due to unexpected high unit operational failure or unit modification. The thesis objective is to analyze the NADEP's remanufacturing process, determine areas that will benefit from the implementation of ToC, and then document managerial tools the depot level manager could use to globally optimize the remanufacturing process. The study focuses on the A-6 remanufacturing line at the NADEP, Alameda, CA. The thesis concludes ToC is a viable methodology, and with the use of Queuing Charts and Critical Resource Scheduling, the NADEP can meet its business objective of providing a cost effective remanufacturing capability to the DOD."],"dc:description.uri":["http://archive.org/details/applyingoryofcon1094539658"],"dc:format.extent":["81 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/39658"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Theory of constraints","Aircraft remanufacturing","NADEP","Critical resource scheduling","Queuing theory"],"dc:title":["Applying theory of constraints to an aircraft remanufacturing line"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:38:54Z"}