{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/39702"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/39702","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An analysis of the Cost of Base Realignment Actions (COBRA) model","abstract":"As the result of the deliberations of the 1993 Base Realignment and Closure Commission, the Department of Defense will close or realign over 100 military installations at a cost of over $5.5 billion. The Cost of Base Realignment Actions (COBRA) model is the primary financial analysis tool used by the Base Realignment and Closure Commission and the military departments to evaluate the costs and benefits of proposed base closures and realignments. This thesis examines three critical aspects of the model: the estimation of military construction costs, the prediction of overhead savings, and the choice of discount rate. COBRA cost estimates are compared to actual military construction costs for three Navy bases selected for closure/realignment in 1988: Naval Station, Brooklyn; Naval Station, Sand Point; and Naval Station, Hunters Point. Cost estimating relationships for overhead costs are developed for five categories of Navy/Marine Corps installations and compared to the COBRA models for overhead costs. The discount rate used for COBRA net present value analyses is evaluated with respect to directives in Office of Management and Budget Circular A-94. The final chapter draws conclusions on the accuracy of the COBRA model, identifies changes that may be made to improve the model, and suggests areas that require additional research.","abstract_html":"As the result of the deliberations of the 1993 Base Realignment and Closure Commission, the Department of Defense will close or realign over 100 military installations at a cost of over $5.5 billion. The Cost of Base Realignment Actions (COBRA) model is the primary financial analysis tool used by the Base Realignment and Closure Commission and the military departments to evaluate the costs and benefits of proposed base closures and realignments. This thesis examines three critical aspects of the model: the estimation of military construction costs, the prediction of overhead savings, and the choice of discount rate. COBRA cost estimates are compared to actual military construction costs for three Navy bases selected for closure/realignment in 1988: Naval Station, Brooklyn; Naval Station, Sand Point; and Naval Station, Hunters Point. Cost estimating relationships for overhead costs are developed for five categories of Navy/Marine Corps installations and compared to the COBRA models for overhead costs. The discount rate used for COBRA net present value analyses is evaluated with respect to directives in Office of Management and Budget Circular A-94. The final chapter draws conclusions on the accuracy of the COBRA model, identifies changes that may be made to improve the model, and suggests areas that require additional research.","abstract_has_math":false,"creators":["Kemper, Vernon P."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Financial Management","degree_level":"Masters","degree_discipline":"Financial Management","degree_department":"Department of Administrative Sciences","school":null,"contributors":[],"advisors":["Webb, Natalie J.","Jones, Lawrence R."],"committee_chairs":[],"committee_members":[],"year":1993,"date_issued":"1993-12","date_published":"1993-12","updated_at":"2026-11-21T22:47:20Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/39702","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/39702","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F39702","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Webb, Natalie J.","Jones, Lawrence R."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Kemper, Vernon P."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1993"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-26T23:22:54Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-26T23:22:54Z"]},{"key":"dc:date.issued","label":"Date","values":["1993-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Financial Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Financial Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Cost of Base Realignment Actions Model","COBRA","Base closures","Cost estimating"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/39702"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["As the result of the deliberations of the 1993 Base Realignment and Closure Commission, the Department of Defense will close or realign over 100 military installations at a cost of over $5.5 billion. The Cost of Base Realignment Actions (COBRA) model is the primary financial analysis tool used by the Base Realignment and Closure Commission and the military departments to evaluate the costs and benefits of proposed base closures and realignments. This thesis examines three critical aspects of the model: the estimation of military construction costs, the prediction of overhead savings, and the choice of discount rate. COBRA cost estimates are compared to actual military construction costs for three Navy bases selected for closure/realignment in 1988: Naval Station, Brooklyn; Naval Station, Sand Point; and Naval Station, Hunters Point. Cost estimating relationships for overhead costs are developed for five categories of Navy/Marine Corps installations and compared to the COBRA models for overhead costs. The discount rate used for COBRA net present value analyses is evaluated with respect to directives in Office of Management and Budget Circular A-94. The final chapter draws conclusions on the accuracy of the COBRA model, identifies changes that may be made to improve the model, and suggests areas that require additional research."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/annalysisofcosto1094539702"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["145 p."]},{"key":"dc:title","label":"Title","values":["An analysis of the Cost of Base Realignment Actions (COBRA) model"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Webb, Natalie J.","Jones, Lawrence R."],"dc:contributor.department":["Department of Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Kemper, Vernon P."],"dc:date":["December 1993"],"dc:date.accessioned":["2014-03-26T23:22:54Z"],"dc:date.available":["2014-03-26T23:22:54Z"],"dc:date.issued":["1993-12"],"dc:description.abstract":["As the result of the deliberations of the 1993 Base Realignment and Closure Commission, the Department of Defense will close or realign over 100 military installations at a cost of over $5.5 billion. The Cost of Base Realignment Actions (COBRA) model is the primary financial analysis tool used by the Base Realignment and Closure Commission and the military departments to evaluate the costs and benefits of proposed base closures and realignments. This thesis examines three critical aspects of the model: the estimation of military construction costs, the prediction of overhead savings, and the choice of discount rate. COBRA cost estimates are compared to actual military construction costs for three Navy bases selected for closure/realignment in 1988: Naval Station, Brooklyn; Naval Station, Sand Point; and Naval Station, Hunters Point. Cost estimating relationships for overhead costs are developed for five categories of Navy/Marine Corps installations and compared to the COBRA models for overhead costs. The discount rate used for COBRA net present value analyses is evaluated with respect to directives in Office of Management and Budget Circular A-94. The final chapter draws conclusions on the accuracy of the COBRA model, identifies changes that may be made to improve the model, and suggests areas that require additional research."],"dc:description.uri":["http://archive.org/details/annalysisofcosto1094539702"],"dc:format.extent":["145 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/39702"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Cost of Base Realignment Actions Model","COBRA","Base closures","Cost estimating"],"dc:title":["An analysis of the Cost of Base Realignment Actions (COBRA) model"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Financial Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Financial Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:47:20Z"}