{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/39752"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/39752","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Required Delivery Date (RDD), an alternative to Procurement Adminisistrative [i.e. Administrative] Lead Time (PALT)?","abstract":"The Navy Field Contracting System (NFCS) uses Procurement Administrative Lead Time (PALT) as the primary indicator of procurement effectiveness. However, many procurement activities are attempting to use other indicators to measure procurement effectiveness. Required Delivery Date (RDD) is one measure that has been proposed as a replacement or addition to PALT. A survey of 62 procurement professionals in the NFCS was conducted in order to gauge the reaction to the proposed use of RDD. Respondents indicated that using RDD as an indicator of performance was a good concept, but that it was impractical due to the number of unrealistic RDDs provided by customers. It was further concluded that other concerns such as: obtaining valid receipt dates; additional buyer workload; and vendor considerations may also complicate the use of RDD as a measurement tool. This thesis recommends that activities must decide for themselves if the benefits measuring RDD outweigh the costs of implementing a system designed to track and measure RDD.","abstract_html":"The Navy Field Contracting System (NFCS) uses Procurement Administrative Lead Time (PALT) as the primary indicator of procurement effectiveness. However, many procurement activities are attempting to use other indicators to measure procurement effectiveness. Required Delivery Date (RDD) is one measure that has been proposed as a replacement or addition to PALT. A survey of 62 procurement professionals in the NFCS was conducted in order to gauge the reaction to the proposed use of RDD. Respondents indicated that using RDD as an indicator of performance was a good concept, but that it was impractical due to the number of unrealistic RDDs provided by customers. It was further concluded that other concerns such as: obtaining valid receipt dates; additional buyer workload; and vendor considerations may also complicate the use of RDD as a measurement tool. This thesis recommends that activities must decide for themselves if the benefits measuring RDD outweigh the costs of implementing a system designed to track and measure RDD.","abstract_has_math":false,"creators":["Vickers, Robert Jennings."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Administrative Sciences","school":null,"contributors":[],"advisors":["Lamm, David V.","Adams, Rebecca J."],"committee_chairs":[],"committee_members":[],"year":1993,"date_issued":"1993-12","date_published":"1993-12","updated_at":"2026-11-21T22:37:52Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/39752","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/39752","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F39752","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Lamm, David V.","Adams, Rebecca J."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Vickers, Robert Jennings."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1993"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-26T23:23:07Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-26T23:23:07Z"]},{"key":"dc:date.issued","label":"Date","values":["1993-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Required delivery date","Procurement administrative lead time","Procurement","Purchasing","Leadtime","Contracting","Administrative","Evaluation","Process","Measurement","Department of Defense","Armed Forces","Armed services","Army","Navy","Air Force"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/39752"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The Navy Field Contracting System (NFCS) uses Procurement Administrative Lead Time (PALT) as the primary indicator of procurement effectiveness. However, many procurement activities are attempting to use other indicators to measure procurement effectiveness. Required Delivery Date (RDD) is one measure that has been proposed as a replacement or addition to PALT. A survey of 62 procurement professionals in the NFCS was conducted in order to gauge the reaction to the proposed use of RDD. Respondents indicated that using RDD as an indicator of performance was a good concept, but that it was impractical due to the number of unrealistic RDDs provided by customers. It was further concluded that other concerns such as: obtaining valid receipt dates; additional buyer workload; and vendor considerations may also complicate the use of RDD as a measurement tool. This thesis recommends that activities must decide for themselves if the benefits measuring RDD outweigh the costs of implementing a system designed to track and measure RDD."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/requireddelivery1094539752"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["109 p."]},{"key":"dc:title","label":"Title","values":["Required Delivery Date (RDD), an alternative to Procurement Adminisistrative [i.e. Administrative] Lead Time (PALT)?"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Lamm, David V.","Adams, Rebecca J."],"dc:contributor.department":["Department of Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Vickers, Robert Jennings."],"dc:date":["December 1993"],"dc:date.accessioned":["2014-03-26T23:23:07Z"],"dc:date.available":["2014-03-26T23:23:07Z"],"dc:date.issued":["1993-12"],"dc:description.abstract":["The Navy Field Contracting System (NFCS) uses Procurement Administrative Lead Time (PALT) as the primary indicator of procurement effectiveness. However, many procurement activities are attempting to use other indicators to measure procurement effectiveness. Required Delivery Date (RDD) is one measure that has been proposed as a replacement or addition to PALT. A survey of 62 procurement professionals in the NFCS was conducted in order to gauge the reaction to the proposed use of RDD. Respondents indicated that using RDD as an indicator of performance was a good concept, but that it was impractical due to the number of unrealistic RDDs provided by customers. It was further concluded that other concerns such as: obtaining valid receipt dates; additional buyer workload; and vendor considerations may also complicate the use of RDD as a measurement tool. This thesis recommends that activities must decide for themselves if the benefits measuring RDD outweigh the costs of implementing a system designed to track and measure RDD."],"dc:description.uri":["http://archive.org/details/requireddelivery1094539752"],"dc:format.extent":["109 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/39752"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Required delivery date","Procurement administrative lead time","Procurement","Purchasing","Leadtime","Contracting","Administrative","Evaluation","Process","Measurement","Department of Defense","Armed Forces","Armed services","Army","Navy","Air Force"],"dc:title":["Required Delivery Date (RDD), an alternative to Procurement Adminisistrative [i.e. Administrative] Lead Time (PALT)?"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:37:52Z"}