{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/39829"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/39829","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A management case study: the implementation of the Rapid Acquisition of Manufactured Parts (RAMP) program","abstract":"This thesis is a management case study which describes the implementation of the Navy's Rapid Acquisition of Manufactured Parts (RAMP) program. The RAMP program was implemented in 1989 by the Naval Supply Systems Command (NAVSUP) to address the problems in procurement of spare parts for the Navy's weapon systems. RAMP technology proposed the use of flexible manufacturing systems and computer integrated manufacturing (CIM) capability to develop self-contained computerized manufacturing cells used to produce small machined parts and printed wire assemblies. The goal of RAMP was to develop and use computerized parts specifications to reduce lead time and cost for manufactured spare parts. This management case study concentrates on the examination of how new technology is implemented into current established organizations. The main focus is on the relationships between the navy commands involved in the implementation: the Navy RAMP sites and the Inventory Control Points (Aviation Support Office and Ships Pans Control Center). The case includes the background and a description of the program, strategic planning, key players, identification of parts, establishment of technical data, cost and competition issues, and the steps taken to organize and implement RAW technology. Teaching notes are included which identify the important issues of the case including strategic planning, customer needs, organizational policy, bid procedures and the communication process.","abstract_html":"This thesis is a management case study which describes the implementation of the Navy&#x27;s Rapid Acquisition of Manufactured Parts (RAMP) program. The RAMP program was implemented in 1989 by the Naval Supply Systems Command (NAVSUP) to address the problems in procurement of spare parts for the Navy&#x27;s weapon systems. RAMP technology proposed the use of flexible manufacturing systems and computer integrated manufacturing (CIM) capability to develop self-contained computerized manufacturing cells used to produce small machined parts and printed wire assemblies. The goal of RAMP was to develop and use computerized parts specifications to reduce lead time and cost for manufactured spare parts. This management case study concentrates on the examination of how new technology is implemented into current established organizations. The main focus is on the relationships between the navy commands involved in the implementation: the Navy RAMP sites and the Inventory Control Points (Aviation Support Office and Ships Pans Control Center). The case includes the background and a description of the program, strategic planning, key players, identification of parts, establishment of technical data, cost and competition issues, and the steps taken to organize and implement RAW technology. Teaching notes are included which identify the important issues of the case including strategic planning, customer needs, organizational policy, bid procedures and the communication process.","abstract_has_math":false,"creators":["Peterson, Marlene J."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Administrative Sciences","school":null,"contributors":[],"advisors":["Euske, Kenneth J."],"committee_chairs":[],"committee_members":["Sessions, Sterling"],"year":1993,"date_issued":"1993-06","date_published":"1993-06","updated_at":"2026-11-21T22:36:33Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/39829","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/39829","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F39829","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F39829","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Euske, Kenneth J."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Sessions, Sterling"]},{"key":"dc:contributor.department","label":"Department","values":["Department of Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Peterson, Marlene J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 1993"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-26T23:23:26Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-26T23:23:26Z"]},{"key":"dc:date.issued","label":"Date","values":["1993-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["RAMP program","Computer Integrated Manufacturing (CIM)","Flexible Manufacturing Systems (FMS)"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/39829"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis is a management case study which describes the implementation of the Navy's Rapid Acquisition of Manufactured Parts (RAMP) program. The RAMP program was implemented in 1989 by the Naval Supply Systems Command (NAVSUP) to address the problems in procurement of spare parts for the Navy's weapon systems. RAMP technology proposed the use of flexible manufacturing systems and computer integrated manufacturing (CIM) capability to develop self-contained computerized manufacturing cells used to produce small machined parts and printed wire assemblies. The goal of RAMP was to develop and use computerized parts specifications to reduce lead time and cost for manufactured spare parts. This management case study concentrates on the examination of how new technology is implemented into current established organizations. The main focus is on the relationships between the navy commands involved in the implementation: the Navy RAMP sites and the Inventory Control Points (Aviation Support Office and Ships Pans Control Center). The case includes the background and a description of the program, strategic planning, key players, identification of parts, establishment of technical data, cost and competition issues, and the steps taken to organize and implement RAW technology. Teaching notes are included which identify the important issues of the case including strategic planning, customer needs, organizational policy, bid procedures and the communication process."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/amanagementcases1094539829"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["60 p."]},{"key":"dc:title","label":"Title","values":["A management case study: the implementation of the Rapid Acquisition of Manufactured Parts (RAMP) program"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Euske, Kenneth J."],"dc:contributor.committeemember":["Sessions, Sterling"],"dc:contributor.department":["Department of Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Peterson, Marlene J."],"dc:date":["June 1993"],"dc:date.accessioned":["2014-03-26T23:23:26Z"],"dc:date.available":["2014-03-26T23:23:26Z"],"dc:date.issued":["1993-06"],"dc:description.abstract":["This thesis is a management case study which describes the implementation of the Navy's Rapid Acquisition of Manufactured Parts (RAMP) program. The RAMP program was implemented in 1989 by the Naval Supply Systems Command (NAVSUP) to address the problems in procurement of spare parts for the Navy's weapon systems. RAMP technology proposed the use of flexible manufacturing systems and computer integrated manufacturing (CIM) capability to develop self-contained computerized manufacturing cells used to produce small machined parts and printed wire assemblies. The goal of RAMP was to develop and use computerized parts specifications to reduce lead time and cost for manufactured spare parts. This management case study concentrates on the examination of how new technology is implemented into current established organizations. The main focus is on the relationships between the navy commands involved in the implementation: the Navy RAMP sites and the Inventory Control Points (Aviation Support Office and Ships Pans Control Center). The case includes the background and a description of the program, strategic planning, key players, identification of parts, establishment of technical data, cost and competition issues, and the steps taken to organize and implement RAW technology. Teaching notes are included which identify the important issues of the case including strategic planning, customer needs, organizational policy, bid procedures and the communication process."],"dc:description.uri":["http://archive.org/details/amanagementcases1094539829"],"dc:format.extent":["60 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/39829"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["RAMP program","Computer Integrated Manufacturing (CIM)","Flexible Manufacturing Systems (FMS)"],"dc:title":["A management case study: the implementation of the Rapid Acquisition of Manufactured Parts (RAMP) program"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:36:33Z"}