{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/3984"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/3984","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Evaluation of a continuous process improvement pilot program to reduce or eliminate Trident II D5 launcher processing authority documentation at the Strategic Weapons Facility, Atlantic","abstract":"Strategic Weapons Facility, Atlantic (SWFLANT) launcher third level repair cycle requires extensive Trouble Failure Inspection/Rejection Report (TFIRR) processing authority documentation that results in a loss of contractor man-hours and third level repair cycle time. Strategic Systems Programs (SSP) is using Continuous Improvement (CI) events to optimize repair efforts to free manpower and facility resources to meet increasing repair demands. This thesis evaluated the SSP approved CI Pilot Program to reduce or eliminate TRIDENT II D5 launcher TFIRR processing authority documentation and reduce third level repair cycle times at the Northrop Grumman Electronic Systems-Marine Systems (NGES-MS) facilities at SWFLANT. The Pilot Program achieved a 20% reduction in the man-hours using the modified TFIRR process, demonstrated a more efficient workflow and reduced the total third level repair cycle time. Recommendations for reducing or eliminating excessive processing authority documentation at SWFLANT for the TRIDENT II D5 launcher sub-system include accepting and implementing the CI Pilot Program results for reducing and eliminating TFIRR processing authority documentation as permanent changes to the SSP operational procedures and establishing additional CI process reviews to identify opportunities for documentation and repair cycle time reductions.","abstract_html":"Strategic Weapons Facility, Atlantic (SWFLANT) launcher third level repair cycle requires extensive Trouble Failure Inspection/Rejection Report (TFIRR) processing authority documentation that results in a loss of contractor man-hours and third level repair cycle time. Strategic Systems Programs (SSP) is using Continuous Improvement (CI) events to optimize repair efforts to free manpower and facility resources to meet increasing repair demands. This thesis evaluated the SSP approved CI Pilot Program to reduce or eliminate TRIDENT II D5 launcher TFIRR processing authority documentation and reduce third level repair cycle times at the Northrop Grumman Electronic Systems-Marine Systems (NGES-MS) facilities at SWFLANT. The Pilot Program achieved a 20% reduction in the man-hours using the modified TFIRR process, demonstrated a more efficient workflow and reduced the total third level repair cycle time. Recommendations for reducing or eliminating excessive processing authority documentation at SWFLANT for the TRIDENT II D5 launcher sub-system include accepting and implementing the CI Pilot Program results for reducing and eliminating TFIRR processing authority documentation as permanent changes to the SSP operational procedures and establishing additional CI process reviews to identify opportunities for documentation and repair cycle time reductions.","abstract_has_math":false,"creators":["Fields-Austin, Elizabeth A."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Systems Engineering Management","degree_level":"Masters","degree_discipline":"Systems Engineering Management","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Osmundson, John"],"committee_chairs":[],"committee_members":["Simon, Cary"],"year":2008,"date_issued":"2008-09","date_published":"2008-09","updated_at":"2026-11-19T06:34:19Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["268803099"],"render_values":[{"text":"268803099","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/3984","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/3984","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F3984","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Osmundson, John"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Simon, Cary"]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["Fields-Austin, Elizabeth A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:39:59Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:39:59Z"]},{"key":"dc:date.issued","label":"Date","values":["2008-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["73c095de-fa3b-4d63-8300-9b6aee5b4d62"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Systems Engineering Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Systems Engineering","Maintenance","Third Level Repair","TRIDENT II D5","Launcher"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["268803099"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/3984"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Strategic Weapons Facility, Atlantic (SWFLANT) launcher third level repair cycle requires extensive Trouble Failure Inspection/Rejection Report (TFIRR) processing authority documentation that results in a loss of contractor man-hours and third level repair cycle time. Strategic Systems Programs (SSP) is using Continuous Improvement (CI) events to optimize repair efforts to free manpower and facility resources to meet increasing repair demands. This thesis evaluated the SSP approved CI Pilot Program to reduce or eliminate TRIDENT II D5 launcher TFIRR processing authority documentation and reduce third level repair cycle times at the Northrop Grumman Electronic Systems-Marine Systems (NGES-MS) facilities at SWFLANT. The Pilot Program achieved a 20% reduction in the man-hours using the modified TFIRR process, demonstrated a more efficient workflow and reduced the total third level repair cycle time. Recommendations for reducing or eliminating excessive processing authority documentation at SWFLANT for the TRIDENT II D5 launcher sub-system include accepting and implementing the CI Pilot Program results for reducing and eliminating TFIRR processing authority documentation as permanent changes to the SSP operational procedures and establishing additional CI process reviews to identify opportunities for documentation and repair cycle time reductions."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/evaluationofcont109453984"]},{"key":"dc:title","label":"Title","values":["Evaluation of a continuous process improvement pilot program to reduce or eliminate Trident II D5 launcher processing authority documentation at the Strategic Weapons Facility, Atlantic"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Department of the Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Osmundson, John"],"dc:contributor.committeemember":["Simon, Cary"],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["Fields-Austin, Elizabeth A."],"dc:date.accessioned":["2012-03-14T17:39:59Z"],"dc:date.available":["2012-03-14T17:39:59Z"],"dc:date.issued":["2008-09"],"dc:description.abstract":["Strategic Weapons Facility, Atlantic (SWFLANT) launcher third level repair cycle requires extensive Trouble Failure Inspection/Rejection Report (TFIRR) processing authority documentation that results in a loss of contractor man-hours and third level repair cycle time. Strategic Systems Programs (SSP) is using Continuous Improvement (CI) events to optimize repair efforts to free manpower and facility resources to meet increasing repair demands. This thesis evaluated the SSP approved CI Pilot Program to reduce or eliminate TRIDENT II D5 launcher TFIRR processing authority documentation and reduce third level repair cycle times at the Northrop Grumman Electronic Systems-Marine Systems (NGES-MS) facilities at SWFLANT. The Pilot Program achieved a 20% reduction in the man-hours using the modified TFIRR process, demonstrated a more efficient workflow and reduced the total third level repair cycle time. Recommendations for reducing or eliminating excessive processing authority documentation at SWFLANT for the TRIDENT II D5 launcher sub-system include accepting and implementing the CI Pilot Program results for reducing and eliminating TFIRR processing authority documentation as permanent changes to the SSP operational procedures and establishing additional CI process reviews to identify opportunities for documentation and repair cycle time reductions."],"dc:description.uri":["http://archive.org/details/evaluationofcont109453984"],"dc:identifier.oclc":["268803099"],"dc:identifier.uri":["https://hdl.handle.net/10945/3984"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["73c095de-fa3b-4d63-8300-9b6aee5b4d62"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Systems Engineering","Maintenance","Third Level Repair","TRIDENT II D5","Launcher"],"dc:title":["Evaluation of a continuous process improvement pilot program to reduce or eliminate Trident II D5 launcher processing authority documentation at the Strategic Weapons Facility, Atlantic"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Department of the Navy"],"thesis:degree_discipline":["Systems Engineering Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Systems Engineering Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:34:19Z"}