{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/40054"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/40054","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Optimal Inventory Operating Policies Under Relaxed Delivery Assumptions.","abstract":"Historically, the inventory control problem has been analyzed under the assumption that the exact quantity ordered was delivered in one lot, at the end of a probabilistic or deterministic lead time, or, alternatively, that receipts are the direct result of a continuous, fixed rate production process. In this paper, the effect of relaxation of these assumptions is considered. It is quite common in large inventory systems to have the total quantity ordered delivered in increments phased over time. Contracts providing for delivery of short or excess quantities within tolerances are also frequently encountered. Production rates may be stochastic due to work stoppages, the diversion of resources to meet higher priority requirements and other external factors. A family of models, with a variety of delivery conditions, are presented. The optimal operating policies and costs of these models are compared to the policies and costs resulting from models with conventional delivery assumptions.","abstract_html":"Historically, the inventory control problem has been analyzed under the assumption that the exact quantity ordered was delivered in one lot, at the end of a probabilistic or deterministic lead time, or, alternatively, that receipts are the direct result of a continuous, fixed rate production process. In this paper, the effect of relaxation of these assumptions is considered. It is quite common in large inventory systems to have the total quantity ordered delivered in increments phased over time. Contracts providing for delivery of short or excess quantities within tolerances are also frequently encountered. Production rates may be stochastic due to work stoppages, the diversion of resources to meet higher priority requirements and other external factors. A family of models, with a variety of delivery conditions, are presented. The optimal operating policies and costs of these models are compared to the policies and costs resulting from models with conventional delivery assumptions.","abstract_has_math":false,"creators":["Cook, John Morse"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":null,"school":null,"contributors":[],"advisors":["Schrady, David A."],"committee_chairs":[],"committee_members":[],"year":1968,"date_issued":"1968-06","date_published":"1968-06","updated_at":"2026-11-21T22:45:10Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/40054","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/40054","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F40054","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F40054","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Schrady, David A."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Cook, John Morse"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1968-06"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-27T21:10:23Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-27T21:10:23Z"]},{"key":"dc:date.issued","label":"Date","values":["1968-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/40054"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Historically, the inventory control problem has been analyzed under the assumption that the exact quantity ordered was delivered in one lot, at the end of a probabilistic or deterministic lead time, or, alternatively, that receipts are the direct result of a continuous, fixed rate production process. In this paper, the effect of relaxation of these assumptions is considered. It is quite common in large inventory systems to have the total quantity ordered delivered in increments phased over time. Contracts providing for delivery of short or excess quantities within tolerances are also frequently encountered. Production rates may be stochastic due to work stoppages, the diversion of resources to meet higher priority requirements and other external factors. A family of models, with a variety of delivery conditions, are presented. The optimal operating policies and costs of these models are compared to the policies and costs resulting from models with conventional delivery assumptions."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/optimalinventory1094540054"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["124 p."]},{"key":"dc:title","label":"Title","values":["Optimal Inventory Operating Policies Under Relaxed Delivery Assumptions."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Schrady, David A."],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Cook, John Morse"],"dc:date":["1968-06"],"dc:date.accessioned":["2014-03-27T21:10:23Z"],"dc:date.available":["2014-03-27T21:10:23Z"],"dc:date.issued":["1968-06"],"dc:description.abstract":["Historically, the inventory control problem has been analyzed under the assumption that the exact quantity ordered was delivered in one lot, at the end of a probabilistic or deterministic lead time, or, alternatively, that receipts are the direct result of a continuous, fixed rate production process. In this paper, the effect of relaxation of these assumptions is considered. It is quite common in large inventory systems to have the total quantity ordered delivered in increments phased over time. Contracts providing for delivery of short or excess quantities within tolerances are also frequently encountered. Production rates may be stochastic due to work stoppages, the diversion of resources to meet higher priority requirements and other external factors. A family of models, with a variety of delivery conditions, are presented. The optimal operating policies and costs of these models are compared to the policies and costs resulting from models with conventional delivery assumptions."],"dc:description.uri":["http://archive.org/details/optimalinventory1094540054"],"dc:format.extent":["124 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/40054"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:title":["Optimal Inventory Operating Policies Under Relaxed Delivery Assumptions."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:45:10Z"}