{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/4179"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/4179","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Real-time dispatching of rubber tired gantry cranes in container terminals","abstract":"Within the past 50 years, containerization and globalization have driven a change from small container terminals to large container terminals that need efficient logistic models to keep up with the significant growth in container traffic. Efficiently managing rubber-tired gantry cranes and planning container placement within the terminal are two ways to increase the overall efficiency of a terminal. In this thesis, we combine these strategies in a real-time dispatching tool using an approximate dynamic programming heuristic. The heuristic re-optimizes at the rate the quay crane handles containers, incorporating endogenous and exogenous information in each solution. We formulated and solved an Integer Linear Program (ILP) to estimate the heuristic's solution quality. The heuristic finds solutions within seconds and the absolute gap between the heuristic solution and the ILP solutions remained essentially constant as the size of the problem increased.","abstract_html":"Within the past 50 years, containerization and globalization have driven a change from small container terminals to large container terminals that need efficient logistic models to keep up with the significant growth in container traffic. Efficiently managing rubber-tired gantry cranes and planning container placement within the terminal are two ways to increase the overall efficiency of a terminal. In this thesis, we combine these strategies in a real-time dispatching tool using an approximate dynamic programming heuristic. The heuristic re-optimizes at the rate the quay crane handles containers, incorporating endogenous and exogenous information in each solution. We formulated and solved an Integer Linear Program (ILP) to estimate the heuristic&#x27;s solution quality. The heuristic finds solutions within seconds and the absolute gap between the heuristic solution and the ILP solutions remained essentially constant as the size of the problem increased.","abstract_has_math":false,"creators":["McNary, Bradley S."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S.","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":null,"school":null,"contributors":[],"advisors":["Royset, Johannes O."],"committee_chairs":[],"committee_members":["Dell, Robert F."],"year":2008,"date_issued":"2008-03","date_published":"2008-03","updated_at":"2026-11-26T00:02:35Z","subjects":["Container terminals","United States","Management","Business logistics","Gantry cranes","Unitized cargo systems","Cost effectiveness","Marine terminals","Econometric models"],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["227366811"],"render_values":[{"text":"227366811","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/4179","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/4179","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F4179","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F4179","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Royset, Johannes O."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Dell, Robert F."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["McNary, Bradley S."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:40:57Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:40:57Z"]},{"key":"dc:date.issued","label":"Date","values":["2008-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Container terminals","United States","Management","Business logistics","Gantry cranes","Unitized cargo systems","Cost effectiveness","Marine terminals","Econometric models"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["227366811"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/4179"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Within the past 50 years, containerization and globalization have driven a change from small container terminals to large container terminals that need efficient logistic models to keep up with the significant growth in container traffic. Efficiently managing rubber-tired gantry cranes and planning container placement within the terminal are two ways to increase the overall efficiency of a terminal. In this thesis, we combine these strategies in a real-time dispatching tool using an approximate dynamic programming heuristic. The heuristic re-optimizes at the rate the quay crane handles containers, incorporating endogenous and exogenous information in each solution. We formulated and solved an Integer Linear Program (ILP) to estimate the heuristic's solution quality. The heuristic finds solutions within seconds and the absolute gap between the heuristic solution and the ILP solutions remained essentially constant as the size of the problem increased."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/realtimedispatch109454179"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xiv, 41 p. : ill.(some col.) ;"]},{"key":"dc:title","label":"Title","values":["Real-time dispatching of rubber tired gantry cranes in container terminals"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["US Navy (USN) author."]},{"key":"local:etd.verified","label":"Local Etd Verified","values":["no"]}]}],"canonical_facts":{"dc:contributor.advisor":["Royset, Johannes O."],"dc:contributor.committeemember":["Dell, Robert F."],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["McNary, Bradley S."],"dc:date.accessioned":["2012-03-14T17:40:57Z"],"dc:date.available":["2012-03-14T17:40:57Z"],"dc:date.issued":["2008-03"],"dc:description.abstract":["Within the past 50 years, containerization and globalization have driven a change from small container terminals to large container terminals that need efficient logistic models to keep up with the significant growth in container traffic. Efficiently managing rubber-tired gantry cranes and planning container placement within the terminal are two ways to increase the overall efficiency of a terminal. In this thesis, we combine these strategies in a real-time dispatching tool using an approximate dynamic programming heuristic. The heuristic re-optimizes at the rate the quay crane handles containers, incorporating endogenous and exogenous information in each solution. We formulated and solved an Integer Linear Program (ILP) to estimate the heuristic's solution quality. The heuristic finds solutions within seconds and the absolute gap between the heuristic solution and the ILP solutions remained essentially constant as the size of the problem increased."],"dc:description.uri":["http://archive.org/details/realtimedispatch109454179"],"dc:format.extent":["xiv, 41 p. : ill.(some col.) ;"],"dc:identifier.oclc":["227366811"],"dc:identifier.uri":["https://hdl.handle.net/10945/4179"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.lcsh":["Container terminals","United States","Management","Business logistics","Gantry cranes","Unitized cargo systems","Cost effectiveness","Marine terminals","Econometric models"],"dc:title":["Real-time dispatching of rubber tired gantry cranes in container terminals"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["US Navy (USN) author."],"local:etd.verified":["no"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S."],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:02:35Z"}