{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/42601"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/42601","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"What are the effects of protest fear?","abstract":"Fear of the real or perceived consequences of receiving a bid protest exists. U.S. Navy contracting officers have some concern of protests. This concern can be linked to certain consequences on acquisition strategies. There is enough qualitative and quantitative empirical evidence to suggest that fear of protest can impact what would otherwise be prudent business decisions. The greatest concerns are a few instances of inappropriate uses of lowest price technically acceptable and the reduced technical evaluation effectiveness attributed to fear of protests. If fear waters down the source selection hindering its ability to distinguish between the true value of offers, then contracting officers must ask themselves why go through the trouble of a best-value source selection? Could contracting officers simply award to the low bidder? To what extent is the set of stringent source selection rules driving the acquisition team to this result by default (i.e., regardless of source selection method actually employed)? Thus, for the sake of stringent, fairness-based rules, contracted outcomes can be compromised. Whether the tradeoff is prudent remains to be determined. Further research is needed to ascertain these other culprits, then compare the relative effects of fear of protest among other factors.","abstract_html":"Fear of the real or perceived consequences of receiving a bid protest exists. U.S. Navy contracting officers have some concern of protests. This concern can be linked to certain consequences on acquisition strategies. There is enough qualitative and quantitative empirical evidence to suggest that fear of protest can impact what would otherwise be prudent business decisions. The greatest concerns are a few instances of inappropriate uses of lowest price technically acceptable and the reduced technical evaluation effectiveness attributed to fear of protests. If fear waters down the source selection hindering its ability to distinguish between the true value of offers, then contracting officers must ask themselves why go through the trouble of a best-value source selection? Could contracting officers simply award to the low bidder? To what extent is the set of stringent source selection rules driving the acquisition team to this result by default (i.e., regardless of source selection method actually employed)? Thus, for the sake of stringent, fairness-based rules, contracted outcomes can be compromised. Whether the tradeoff is prudent remains to be determined. Further research is needed to ascertain these other culprits, then compare the relative effects of fear of protest among other factors.","abstract_has_math":false,"creators":["Combs, Suquon","Calandruccio, Jason","Colbert, Brian"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Hawkins, Timothy","Yoder, Elliot"],"committee_chairs":[],"committee_members":[],"year":2014,"date_issued":"2014-06","date_published":"2014-06","updated_at":"2026-11-19T06:35:03Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/42601","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/42601","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F42601","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Hawkins, Timothy","Yoder, Elliot"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Combs, Suquon","Calandruccio, Jason","Colbert, Brian"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-08-13T20:17:33Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-08-13T20:17:33Z"]},{"key":"dc:date.issued","label":"Date","values":["2014-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["NPS Outstanding Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["c5e66392-520c-4aaf-9b4f-370ce82b601f"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Contracting","acquisition strategies","fear","protest","LPTA","trade off","source selection","procurement administration lead time","competence","risk","requirement criticality","discussions","technical evaluation effectiveness","performance","transaction cost","authority"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/42601"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Fear of the real or perceived consequences of receiving a bid protest exists. U.S. Navy contracting officers have some concern of protests. This concern can be linked to certain consequences on acquisition strategies. There is enough qualitative and quantitative empirical evidence to suggest that fear of protest can impact what would otherwise be prudent business decisions. The greatest concerns are a few instances of inappropriate uses of lowest price technically acceptable and the reduced technical evaluation effectiveness attributed to fear of protests. If fear waters down the source selection hindering its ability to distinguish between the true value of offers, then contracting officers must ask themselves why go through the trouble of a best-value source selection? Could contracting officers simply award to the low bidder? To what extent is the set of stringent source selection rules driving the acquisition team to this result by default (i.e., regardless of source selection method actually employed)? Thus, for the sake of stringent, fairness-based rules, contracted outcomes can be compromised. Whether the tradeoff is prudent remains to be determined. Further research is needed to ascertain these other culprits, then compare the relative effects of fear of protest among other factors."]},{"key":"dc:description.award","label":"Dc Description Award","values":["Outstanding Thesis"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/whatreeffectsofp1094542601"]},{"key":"dc:title","label":"Title","values":["What are the effects of protest fear?"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, U.S. Navy;Lieutenant Commander, U.S. Navy;Lieutenant, U.S. Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Hawkins, Timothy","Yoder, Elliot"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Combs, Suquon","Calandruccio, Jason","Colbert, Brian"],"dc:date.accessioned":["2014-08-13T20:17:33Z"],"dc:date.available":["2014-08-13T20:17:33Z"],"dc:date.issued":["2014-06"],"dc:description.abstract":["Fear of the real or perceived consequences of receiving a bid protest exists. U.S. Navy contracting officers have some concern of protests. This concern can be linked to certain consequences on acquisition strategies. There is enough qualitative and quantitative empirical evidence to suggest that fear of protest can impact what would otherwise be prudent business decisions. The greatest concerns are a few instances of inappropriate uses of lowest price technically acceptable and the reduced technical evaluation effectiveness attributed to fear of protests. If fear waters down the source selection hindering its ability to distinguish between the true value of offers, then contracting officers must ask themselves why go through the trouble of a best-value source selection? Could contracting officers simply award to the low bidder? To what extent is the set of stringent source selection rules driving the acquisition team to this result by default (i.e., regardless of source selection method actually employed)? Thus, for the sake of stringent, fairness-based rules, contracted outcomes can be compromised. Whether the tradeoff is prudent remains to be determined. Further research is needed to ascertain these other culprits, then compare the relative effects of fear of protest among other factors."],"dc:description.award":["Outstanding Thesis"],"dc:description.uri":["http://archive.org/details/whatreeffectsofp1094542601"],"dc:identifier.uri":["https://hdl.handle.net/10945/42601"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["NPS Outstanding Theses and Dissertations"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["c5e66392-520c-4aaf-9b4f-370ce82b601f"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Contracting","acquisition strategies","fear","protest","LPTA","trade off","source selection","procurement administration lead time","competence","risk","requirement criticality","discussions","technical evaluation effectiveness","performance","transaction cost","authority"],"dc:title":["What are the effects of protest fear?"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, U.S. Navy;Lieutenant Commander, U.S. Navy;Lieutenant, U.S. Navy"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:35:03Z"}