{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/42662"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/42662","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A qualitative study of affordability: Virginia and San Antonio class programs","abstract":"During the mid-1990s, the U.S. Navy initiated a wide-ranging series of Department of Defense (DOD) acquisition reforms. Amid this environment of DOD acquisition reform, the U.S. Navy started the Virginia-class submarine program and San Antonio-class amphibious transport dock ship program. Both of these programs sought to reduce ownership costs of these new vessels. This study compares the Virginia-class submarine and San Antonio-class ship across platforms and across time in order to find those factors that appear to affect cost. This study isolates those key metrics and relationships that demonstrate an apparently significant impact on affordability. The purpose of this study is to find the programmatic decisions, environmental circumstances or managerial tools that benefit or jeopardize affordability in a consistent manner, and recommend further study in those areas most likely to promote the development of better practices for affordability throughout a program’s life cycle. The results of this study indicated that the interpretation of affordability changes across the life cycle phases of an acquisition program; however, the factors that affected cost between the Virginia-class submarine and the San Antonio-class ship were comparable across time. The overall findings of affordability across time and between these two acquisition programs were mixed. During the pre-acquisition stage, key elements, which accept a high degree of cost-growth risk, do not appear to be sufficiently responsive to cost-growth mitigation initiatives. The findings suggest that, in the acquisition stage, it is possible to reverse cost-growth by setting a non-negotiable cost target and establishing all other factors as flexible. For the sustainment stage, analysis of the cost effectiveness of an acquisition system’s design is limited by the degree of consistency between operational events and program assumptions and the percentage of life-cycle completion that are supported by actual cost. The sustainment costs to date reflect a successful reduction of total ownership costs for the Virginia-class submarine, and inconclusive findings of cost effectiveness for the San Antonio-class ship.","abstract_html":"During the mid-1990s, the U.S. Navy initiated a wide-ranging series of Department of Defense (DOD) acquisition reforms. Amid this environment of DOD acquisition reform, the U.S. Navy started the Virginia-class submarine program and San Antonio-class amphibious transport dock ship program. Both of these programs sought to reduce ownership costs of these new vessels. This study compares the Virginia-class submarine and San Antonio-class ship across platforms and across time in order to find those factors that appear to affect cost. This study isolates those key metrics and relationships that demonstrate an apparently significant impact on affordability. The purpose of this study is to find the programmatic decisions, environmental circumstances or managerial tools that benefit or jeopardize affordability in a consistent manner, and recommend further study in those areas most likely to promote the development of better practices for affordability throughout a program’s life cycle. The results of this study indicated that the interpretation of affordability changes across the life cycle phases of an acquisition program; however, the factors that affected cost between the Virginia-class submarine and the San Antonio-class ship were comparable across time. The overall findings of affordability across time and between these two acquisition programs were mixed. During the pre-acquisition stage, key elements, which accept a high degree of cost-growth risk, do not appear to be sufficiently responsive to cost-growth mitigation initiatives. The findings suggest that, in the acquisition stage, it is possible to reverse cost-growth by setting a non-negotiable cost target and establishing all other factors as flexible. For the sustainment stage, analysis of the cost effectiveness of an acquisition system’s design is limited by the degree of consistency between operational events and program assumptions and the percentage of life-cycle completion that are supported by actual cost. The sustainment costs to date reflect a successful reduction of total ownership costs for the Virginia-class submarine, and inconclusive findings of cost effectiveness for the San Antonio-class ship.","abstract_has_math":false,"creators":["Knox, Craig A.","Reid, Daniel D.","Winters, Timothy M."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Albright, Thomas","Boudreau, Michael"],"committee_chairs":[],"committee_members":["Nussbaum, Daniel"],"year":2014,"date_issued":"2014-06","date_published":"2014-06","updated_at":"2026-11-19T06:35:03Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/42662","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/42662","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F42662","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F42662","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Albright, Thomas","Boudreau, Michael"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Nussbaum, Daniel"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Knox, Craig A.","Reid, Daniel D.","Winters, Timothy M."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-08-13T20:17:47Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-08-13T20:17:47Z"]},{"key":"dc:date.issued","label":"Date","values":["2014-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["NPS Outstanding Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["c5e66392-520c-4aaf-9b4f-370ce82b601f"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Submarine acquisition","Ship acquisition","Submarine sustainment","Ship sustainment","affordability","cost reduction","decisions","enablers"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/42662"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["During the mid-1990s, the U.S. Navy initiated a wide-ranging series of Department of Defense (DOD) acquisition reforms. Amid this environment of DOD acquisition reform, the U.S. Navy started the Virginia-class submarine program and San Antonio-class amphibious transport dock ship program. Both of these programs sought to reduce ownership costs of these new vessels. This study compares the Virginia-class submarine and San Antonio-class ship across platforms and across time in order to find those factors that appear to affect cost. This study isolates those key metrics and relationships that demonstrate an apparently significant impact on affordability. The purpose of this study is to find the programmatic decisions, environmental circumstances or managerial tools that benefit or jeopardize affordability in a consistent manner, and recommend further study in those areas most likely to promote the development of better practices for affordability throughout a program’s life cycle. The results of this study indicated that the interpretation of affordability changes across the life cycle phases of an acquisition program; however, the factors that affected cost between the Virginia-class submarine and the San Antonio-class ship were comparable across time. The overall findings of affordability across time and between these two acquisition programs were mixed. During the pre-acquisition stage, key elements, which accept a high degree of cost-growth risk, do not appear to be sufficiently responsive to cost-growth mitigation initiatives. The findings suggest that, in the acquisition stage, it is possible to reverse cost-growth by setting a non-negotiable cost target and establishing all other factors as flexible. For the sustainment stage, analysis of the cost effectiveness of an acquisition system’s design is limited by the degree of consistency between operational events and program assumptions and the percentage of life-cycle completion that are supported by actual cost. The sustainment costs to date reflect a successful reduction of total ownership costs for the Virginia-class submarine, and inconclusive findings of cost effectiveness for the San Antonio-class ship."]},{"key":"dc:description.award","label":"Dc Description Award","values":["Outstanding Thesis"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/aqualitativestud1094542662"]},{"key":"dc:title","label":"Title","values":["A qualitative study of affordability: Virginia and San Antonio class programs"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy;Lieutenant Commander, United States Navy;Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Albright, Thomas","Boudreau, Michael"],"dc:contributor.committeemember":["Nussbaum, Daniel"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Knox, Craig A.","Reid, Daniel D.","Winters, Timothy M."],"dc:date.accessioned":["2014-08-13T20:17:47Z"],"dc:date.available":["2014-08-13T20:17:47Z"],"dc:date.issued":["2014-06"],"dc:description.abstract":["During the mid-1990s, the U.S. Navy initiated a wide-ranging series of Department of Defense (DOD) acquisition reforms. Amid this environment of DOD acquisition reform, the U.S. Navy started the Virginia-class submarine program and San Antonio-class amphibious transport dock ship program. Both of these programs sought to reduce ownership costs of these new vessels. This study compares the Virginia-class submarine and San Antonio-class ship across platforms and across time in order to find those factors that appear to affect cost. This study isolates those key metrics and relationships that demonstrate an apparently significant impact on affordability. The purpose of this study is to find the programmatic decisions, environmental circumstances or managerial tools that benefit or jeopardize affordability in a consistent manner, and recommend further study in those areas most likely to promote the development of better practices for affordability throughout a program’s life cycle. The results of this study indicated that the interpretation of affordability changes across the life cycle phases of an acquisition program; however, the factors that affected cost between the Virginia-class submarine and the San Antonio-class ship were comparable across time. The overall findings of affordability across time and between these two acquisition programs were mixed. During the pre-acquisition stage, key elements, which accept a high degree of cost-growth risk, do not appear to be sufficiently responsive to cost-growth mitigation initiatives. The findings suggest that, in the acquisition stage, it is possible to reverse cost-growth by setting a non-negotiable cost target and establishing all other factors as flexible. For the sustainment stage, analysis of the cost effectiveness of an acquisition system’s design is limited by the degree of consistency between operational events and program assumptions and the percentage of life-cycle completion that are supported by actual cost. The sustainment costs to date reflect a successful reduction of total ownership costs for the Virginia-class submarine, and inconclusive findings of cost effectiveness for the San Antonio-class ship."],"dc:description.award":["Outstanding Thesis"],"dc:description.uri":["http://archive.org/details/aqualitativestud1094542662"],"dc:identifier.uri":["https://hdl.handle.net/10945/42662"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["NPS Outstanding Theses and Dissertations"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["c5e66392-520c-4aaf-9b4f-370ce82b601f"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Submarine acquisition","Ship acquisition","Submarine sustainment","Ship sustainment","affordability","cost reduction","decisions","enablers"],"dc:title":["A qualitative study of affordability: Virginia and San Antonio class programs"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy;Lieutenant Commander, United States Navy;Lieutenant, United States Navy"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:35:03Z"}