{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/42724"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/42724","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Analysis of the effects of Marine Corps M1A1 Abram’s tank age on operational availability","abstract":"The M1A1 Abram’s Main Battle Tank (MBT) is expected to remain a key piece of USMC equipment beyond 2025. Because the majority of equipment life-cycle costs occur in the operations and support phase, it is imperative that program managers incorporate effective and efficient product support strategies, balancing costs and reliability to create value for the government. The purpose of this project is to determine the effects of age, as measured by the time since the last depot-level rebuild, on equipment operational availability for the M1A1 MBT in the Marine Corps. Our study includes an overview of the history of M1A1 development, Department of Defense materiel maintenance policy, M1A1 rebuild strategy, and prior M1A1 reliability studies. We reviewed depot- and unit-level maintenance records within the USMC’s System Operational Effectiveness database to establish a correlation between years since last rebuild and operational availability (Ao). The objective of our research is to quantify the age-related effects on Ao to better inform the decision-making process of USMC leadership in determining materiel maintenance strategies.","abstract_html":"The M1A1 Abram’s Main Battle Tank (MBT) is expected to remain a key piece of USMC equipment beyond 2025. Because the majority of equipment life-cycle costs occur in the operations and support phase, it is imperative that program managers incorporate effective and efficient product support strategies, balancing costs and reliability to create value for the government. The purpose of this project is to determine the effects of age, as measured by the time since the last depot-level rebuild, on equipment operational availability for the M1A1 MBT in the Marine Corps. Our study includes an overview of the history of M1A1 development, Department of Defense materiel maintenance policy, M1A1 rebuild strategy, and prior M1A1 reliability studies. We reviewed depot- and unit-level maintenance records within the USMC’s System Operational Effectiveness database to establish a correlation between years since last rebuild and operational availability (Ao). The objective of our research is to quantify the age-related effects on Ao to better inform the decision-making process of USMC leadership in determining materiel maintenance strategies.","abstract_has_math":false,"creators":["Scruggs, Andrew M.","Welch, Ryan P."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Naegle, Brad","Kang, Keebom"],"committee_chairs":[],"committee_members":[],"year":2014,"date_issued":"2014-06","date_published":"2014-06","updated_at":"2026-11-19T06:35:03Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/42724","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/42724","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F42724","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F42724","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Naegle, Brad","Kang, Keebom"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Scruggs, Andrew M.","Welch, Ryan P."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-08-13T20:17:59Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-08-13T20:17:59Z"]},{"key":"dc:date.issued","label":"Date","values":["2014-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["M1A1 Abrams MBT","Reliability Centered Maintenance (RCM)","Operational Availability","Materiel Maintenance","Anniston Army Depot","Depot-Level Maintenance"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/42724"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The M1A1 Abram’s Main Battle Tank (MBT) is expected to remain a key piece of USMC equipment beyond 2025. Because the majority of equipment life-cycle costs occur in the operations and support phase, it is imperative that program managers incorporate effective and efficient product support strategies, balancing costs and reliability to create value for the government. The purpose of this project is to determine the effects of age, as measured by the time since the last depot-level rebuild, on equipment operational availability for the M1A1 MBT in the Marine Corps. Our study includes an overview of the history of M1A1 development, Department of Defense materiel maintenance policy, M1A1 rebuild strategy, and prior M1A1 reliability studies. We reviewed depot- and unit-level maintenance records within the USMC’s System Operational Effectiveness database to establish a correlation between years since last rebuild and operational availability (Ao). The objective of our research is to quantify the age-related effects on Ao to better inform the decision-making process of USMC leadership in determining materiel maintenance strategies."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/analysisofeffect1094542724"]},{"key":"dc:title","label":"Title","values":["Analysis of the effects of Marine Corps M1A1 Abram’s tank age on operational availability"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, United States Army;Captain, United States Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Naegle, Brad","Kang, Keebom"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Scruggs, Andrew M.","Welch, Ryan P."],"dc:date.accessioned":["2014-08-13T20:17:59Z"],"dc:date.available":["2014-08-13T20:17:59Z"],"dc:date.issued":["2014-06"],"dc:description.abstract":["The M1A1 Abram’s Main Battle Tank (MBT) is expected to remain a key piece of USMC equipment beyond 2025. Because the majority of equipment life-cycle costs occur in the operations and support phase, it is imperative that program managers incorporate effective and efficient product support strategies, balancing costs and reliability to create value for the government. The purpose of this project is to determine the effects of age, as measured by the time since the last depot-level rebuild, on equipment operational availability for the M1A1 MBT in the Marine Corps. Our study includes an overview of the history of M1A1 development, Department of Defense materiel maintenance policy, M1A1 rebuild strategy, and prior M1A1 reliability studies. We reviewed depot- and unit-level maintenance records within the USMC’s System Operational Effectiveness database to establish a correlation between years since last rebuild and operational availability (Ao). The objective of our research is to quantify the age-related effects on Ao to better inform the decision-making process of USMC leadership in determining materiel maintenance strategies."],"dc:description.uri":["http://archive.org/details/analysisofeffect1094542724"],"dc:identifier.uri":["https://hdl.handle.net/10945/42724"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["M1A1 Abrams MBT","Reliability Centered Maintenance (RCM)","Operational Availability","Materiel Maintenance","Anniston Army Depot","Depot-Level Maintenance"],"dc:title":["Analysis of the effects of Marine Corps M1A1 Abram’s tank age on operational availability"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, United States Army;Captain, United States Army"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:35:03Z"}