{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/42818"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/42818","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Second price sealed bidding in government contracting","abstract":"This study analyzes the use of second price theory as it pertains to competitive Government contracting. Second price theory, which was originally introduced by William Vickery in 1961, entails awarding the lowest responsible and responsive bidder in a sealed bid competition a Firm-Fixed Price (FFP) type contract, where the award price is set at the second lowest bidder's bid price. This study first defines the Second Price Sealed Bid (SPSB) method, a variant of second pricing, and provides the theoretical advantages for its applications in Government contracting. Following this, the thesis presents two sets of experimentation which identify bidding behavior when the SPSB method is applied in Government contracting. The study then discusses and analyzes survey responses received from both Government and private industry contracting professionals concerning the applicability of the SPSB method in Government contracting.","abstract_html":"This study analyzes the use of second price theory as it pertains to competitive Government contracting. Second price theory, which was originally introduced by William Vickery in 1961, entails awarding the lowest responsible and responsive bidder in a sealed bid competition a Firm-Fixed Price (FFP) type contract, where the award price is set at the second lowest bidder&#x27;s bid price. This study first defines the Second Price Sealed Bid (SPSB) method, a variant of second pricing, and provides the theoretical advantages for its applications in Government contracting. Following this, the thesis presents two sets of experimentation which identify bidding behavior when the SPSB method is applied in Government contracting. The study then discusses and analyzes survey responses received from both Government and private industry contracting professionals concerning the applicability of the SPSB method in Government contracting.","abstract_has_math":false,"creators":["Hertig, Donald L."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Terasawa, Katsuaki L.","Stone, Mark W."],"committee_chairs":[],"committee_members":[],"year":1994,"date_issued":"1994-12","date_published":"1994-12","updated_at":"2026-11-26T00:13:43Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["AAZ5780XP"],"render_values":[{"text":"AAZ5780XP","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/42818","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/42818","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F42818","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F42818","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Terasawa, Katsuaki L.","Stone, Mark W."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Hertig, Donald L."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1994"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-08-13T20:26:40Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-08-13T20:26:40Z"]},{"key":"dc:date.issued","label":"Date","values":["1994-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["NA"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["AAZ5780XP"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/42818"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This study analyzes the use of second price theory as it pertains to competitive Government contracting. Second price theory, which was originally introduced by William Vickery in 1961, entails awarding the lowest responsible and responsive bidder in a sealed bid competition a Firm-Fixed Price (FFP) type contract, where the award price is set at the second lowest bidder's bid price. This study first defines the Second Price Sealed Bid (SPSB) method, a variant of second pricing, and provides the theoretical advantages for its applications in Government contracting. Following this, the thesis presents two sets of experimentation which identify bidding behavior when the SPSB method is applied in Government contracting. The study then discusses and analyzes survey responses received from both Government and private industry contracting professionals concerning the applicability of the SPSB method in Government contracting."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/secondpriceseale1094542818"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["111 p."]},{"key":"dc:title","label":"Title","values":["Second price sealed bidding in government contracting"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Navy (USN) author"]}]}],"canonical_facts":{"dc:contributor.advisor":["Terasawa, Katsuaki L.","Stone, Mark W."],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Hertig, Donald L."],"dc:date":["December 1994"],"dc:date.accessioned":["2014-08-13T20:26:40Z"],"dc:date.available":["2014-08-13T20:26:40Z"],"dc:date.issued":["1994-12"],"dc:description.abstract":["This study analyzes the use of second price theory as it pertains to competitive Government contracting. Second price theory, which was originally introduced by William Vickery in 1961, entails awarding the lowest responsible and responsive bidder in a sealed bid competition a Firm-Fixed Price (FFP) type contract, where the award price is set at the second lowest bidder's bid price. This study first defines the Second Price Sealed Bid (SPSB) method, a variant of second pricing, and provides the theoretical advantages for its applications in Government contracting. Following this, the thesis presents two sets of experimentation which identify bidding behavior when the SPSB method is applied in Government contracting. The study then discusses and analyzes survey responses received from both Government and private industry contracting professionals concerning the applicability of the SPSB method in Government contracting."],"dc:description.uri":["http://archive.org/details/secondpriceseale1094542818"],"dc:format.extent":["111 p."],"dc:identifier.oclc":["AAZ5780XP"],"dc:identifier.uri":["https://hdl.handle.net/10945/42818"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["NA"],"dc:title":["Second price sealed bidding in government contracting"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Navy (USN) author"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:13:43Z"}