{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/42940"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/42940","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Parametric cost estimation applied to composite helicopter airframes","abstract":"Composite materials offer great promise to all future air vehicles by allowing engineers to design and build aircraft that weigh less. have better performance, and lower lifecycle cost. However, even though these materials have been used by the industry for over a decade, there still does not exist an accurate means to estimate their cost. The primary objective of this study is to develop cost estimating relationships for composite helicopter airframes. It also provides information about composite materials, cost estimation in the DoD acquisition process, and current composite material cost estimating models. An accurate cost estimate is a crucial element of any successfuJ weapons acquisition program. The results of this study are the development of a predictive model that relates cost in direct labor hours to various performance parameters of a helicopter constructed of composite materials. This thesis should provide information to cost estimators and program managers that will assist them in formulating accurate cost estimates for composite helicopter airframes.","abstract_html":"Composite materials offer great promise to all future air vehicles by allowing engineers to design and build aircraft that weigh less. have better performance, and lower lifecycle cost. However, even though these materials have been used by the industry for over a decade, there still does not exist an accurate means to estimate their cost. The primary objective of this study is to develop cost estimating relationships for composite helicopter airframes. It also provides information about composite materials, cost estimation in the DoD acquisition process, and current composite material cost estimating models. An accurate cost estimate is a crucial element of any successfuJ weapons acquisition program. The results of this study are the development of a predictive model that relates cost in direct labor hours to various performance parameters of a helicopter constructed of composite materials. This thesis should provide information to cost estimators and program managers that will assist them in formulating accurate cost estimates for composite helicopter airframes.","abstract_has_math":false,"creators":["Klumpp, Joseph J."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Boger, Dan C.","Owen, Walter E."],"committee_chairs":[],"committee_members":[],"year":1994,"date_issued":"1994-03","date_published":"1994-03","updated_at":"2026-11-26T00:16:43Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["AAY7984XP"],"render_values":[{"text":"AAY7984XP","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/42940","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/42940","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F42940","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F42940","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Boger, Dan C.","Owen, Walter E."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Klumpp, Joseph J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["March 1994"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-08-13T20:27:13Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-08-13T20:27:13Z"]},{"key":"dc:date.issued","label":"Date","values":["1994-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["NA"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["AAY7984XP"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/42940"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Composite materials offer great promise to all future air vehicles by allowing engineers to design and build aircraft that weigh less. have better performance, and lower lifecycle cost. However, even though these materials have been used by the industry for over a decade, there still does not exist an accurate means to estimate their cost. The primary objective of this study is to develop cost estimating relationships for composite helicopter airframes. It also provides information about composite materials, cost estimation in the DoD acquisition process, and current composite material cost estimating models. An accurate cost estimate is a crucial element of any successfuJ weapons acquisition program. The results of this study are the development of a predictive model that relates cost in direct labor hours to various performance parameters of a helicopter constructed of composite materials. This thesis should provide information to cost estimators and program managers that will assist them in formulating accurate cost estimates for composite helicopter airframes."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/parametriccostes1094542940"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["117 p."]},{"key":"dc:title","label":"Title","values":["Parametric cost estimation applied to composite helicopter airframes"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Army (USA) author"]}]}],"canonical_facts":{"dc:contributor.advisor":["Boger, Dan C.","Owen, Walter E."],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Klumpp, Joseph J."],"dc:date":["March 1994"],"dc:date.accessioned":["2014-08-13T20:27:13Z"],"dc:date.available":["2014-08-13T20:27:13Z"],"dc:date.issued":["1994-03"],"dc:description.abstract":["Composite materials offer great promise to all future air vehicles by allowing engineers to design and build aircraft that weigh less. have better performance, and lower lifecycle cost. However, even though these materials have been used by the industry for over a decade, there still does not exist an accurate means to estimate their cost. The primary objective of this study is to develop cost estimating relationships for composite helicopter airframes. It also provides information about composite materials, cost estimation in the DoD acquisition process, and current composite material cost estimating models. An accurate cost estimate is a crucial element of any successfuJ weapons acquisition program. The results of this study are the development of a predictive model that relates cost in direct labor hours to various performance parameters of a helicopter constructed of composite materials. This thesis should provide information to cost estimators and program managers that will assist them in formulating accurate cost estimates for composite helicopter airframes."],"dc:description.uri":["http://archive.org/details/parametriccostes1094542940"],"dc:format.extent":["117 p."],"dc:identifier.oclc":["AAY7984XP"],"dc:identifier.uri":["https://hdl.handle.net/10945/42940"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["NA"],"dc:title":["Parametric cost estimation applied to composite helicopter airframes"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Army (USA) author"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:16:43Z"}