{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/43740"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/43740","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Cost estimates for Operation Desert Shield/Desert Storm: a budgetary analysis","abstract":"Operation Desert Shield/Desert Storm (DS/DS) presented unique challenges for estimating the cost of that conflict. This analysis reviews the cost estimates and methodologies developed for that purpose by DoD, CBO and GAO. It considers the budget climate and the role of foreign cash and in-kind contributions. Finally, it reviews the budgeting innovations used to provide and monitor DS/DS defense spending. At the outset of the crisis, costs were estimated to determine the defense funding requirements for DS/DS. Because of the specific provisions of the Budget Enforcement Act of 1990, these estimates focused on the incremental impact on DoD's budget. This was difficult because incremental costs were not defined and DoD's accounting structure does not measure incremental costs. As allied financial support for U.S. defense expenditures increased, cost estimates were also used to measure the relative contributions of donor countries. This led to debates over the proper definition of incremental costs. Comparing the DS/DS cost estimates and the foreign cash and in-kind contributions, it appears that foreign contributions will cover DoD's incremental budgetary costs, but not the total incremental costs of the war.","abstract_html":"Operation Desert Shield/Desert Storm (DS/DS) presented unique challenges for estimating the cost of that conflict. This analysis reviews the cost estimates and methodologies developed for that purpose by DoD, CBO and GAO. It considers the budget climate and the role of foreign cash and in-kind contributions. Finally, it reviews the budgeting innovations used to provide and monitor DS/DS defense spending. At the outset of the crisis, costs were estimated to determine the defense funding requirements for DS/DS. Because of the specific provisions of the Budget Enforcement Act of 1990, these estimates focused on the incremental impact on DoD&#x27;s budget. This was difficult because incremental costs were not defined and DoD&#x27;s accounting structure does not measure incremental costs. As allied financial support for U.S. defense expenditures increased, cost estimates were also used to measure the relative contributions of donor countries. This led to debates over the proper definition of incremental costs. Comparing the DS/DS cost estimates and the foreign cash and in-kind contributions, it appears that foreign contributions will cover DoD&#x27;s incremental budgetary costs, but not the total incremental costs of the war.","abstract_has_math":false,"creators":["Johnson, J. Andrew."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Financial Management","degree_level":"Masters","degree_discipline":"Financial Management","degree_department":null,"school":null,"contributors":[],"advisors":["Gates, William R.","Terasawa, Katsuaki L."],"committee_chairs":[],"committee_members":["Doyle, Richard B."],"year":1991,"date_issued":"1991-12","date_published":"1991-12","updated_at":"2026-11-21T22:28:21Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640406568"],"render_values":[{"text":"ocn640406568","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/43740","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/43740","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F43740","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F43740","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Gates, William R.","Terasawa, Katsuaki L."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Doyle, Richard B."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Johnson, J. Andrew."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1991"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-11-20T21:33:17Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-11-20T21:33:17Z"]},{"key":"dc:date.issued","label":"Date","values":["1991-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Financial Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Financial Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640406568"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/43740"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Operation Desert Shield/Desert Storm (DS/DS) presented unique challenges for estimating the cost of that conflict. This analysis reviews the cost estimates and methodologies developed for that purpose by DoD, CBO and GAO. It considers the budget climate and the role of foreign cash and in-kind contributions. Finally, it reviews the budgeting innovations used to provide and monitor DS/DS defense spending. At the outset of the crisis, costs were estimated to determine the defense funding requirements for DS/DS. Because of the specific provisions of the Budget Enforcement Act of 1990, these estimates focused on the incremental impact on DoD's budget. This was difficult because incremental costs were not defined and DoD's accounting structure does not measure incremental costs. As allied financial support for U.S. defense expenditures increased, cost estimates were also used to measure the relative contributions of donor countries. This led to debates over the proper definition of incremental costs. Comparing the DS/DS cost estimates and the foreign cash and in-kind contributions, it appears that foreign contributions will cover DoD's incremental budgetary costs, but not the total incremental costs of the war."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/costestimatesfor1094543740"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["159 p.;28 cm."]},{"key":"dc:title","label":"Title","values":["Cost estimates for Operation Desert Shield/Desert Storm: a budgetary analysis"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Navy (USN) author"]}]}],"canonical_facts":{"dc:contributor.advisor":["Gates, William R.","Terasawa, Katsuaki L."],"dc:contributor.committeemember":["Doyle, Richard B."],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Johnson, J. Andrew."],"dc:date":["December 1991"],"dc:date.accessioned":["2014-11-20T21:33:17Z"],"dc:date.available":["2014-11-20T21:33:17Z"],"dc:date.issued":["1991-12"],"dc:description.abstract":["Operation Desert Shield/Desert Storm (DS/DS) presented unique challenges for estimating the cost of that conflict. This analysis reviews the cost estimates and methodologies developed for that purpose by DoD, CBO and GAO. It considers the budget climate and the role of foreign cash and in-kind contributions. Finally, it reviews the budgeting innovations used to provide and monitor DS/DS defense spending. At the outset of the crisis, costs were estimated to determine the defense funding requirements for DS/DS. Because of the specific provisions of the Budget Enforcement Act of 1990, these estimates focused on the incremental impact on DoD's budget. This was difficult because incremental costs were not defined and DoD's accounting structure does not measure incremental costs. As allied financial support for U.S. defense expenditures increased, cost estimates were also used to measure the relative contributions of donor countries. This led to debates over the proper definition of incremental costs. Comparing the DS/DS cost estimates and the foreign cash and in-kind contributions, it appears that foreign contributions will cover DoD's incremental budgetary costs, but not the total incremental costs of the war."],"dc:description.uri":["http://archive.org/details/costestimatesfor1094543740"],"dc:format.extent":["159 p.;28 cm."],"dc:identifier.oclc":["ocn640406568"],"dc:identifier.uri":["https://hdl.handle.net/10945/43740"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Cost estimates for Operation Desert Shield/Desert Storm: a budgetary analysis"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Navy (USN) author"],"thesis:degree_discipline":["Financial Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Financial Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:28:21Z"}