{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/43776"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/43776","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A guide for the prospective Navy contractor","abstract":"The United States Naval Facilities Engineering Command awarded over 1-billion dollars in construction contracts in 1990 and is expected to increase that figure in 1991. These contracts will be awarded all over the world. They will range in size from five thousand dollar playgrounds to hundred million dollar buildings. The objective of this paper is to develop a guide that will allow contractors to make a smooth transition from contracting with other sources into contracting with the United States Navy. It will cover various areas that often lead to difficulties for contractors unfamiliar with Navy construction contracting. Also the guide will provide an overview of the entire contracting experience from reading the advertisement for the job, to the warranty period after construction. It should be understood that the information presented in this guide applies to the most common type of construction contract used by the Navy - fixed price/lump sum.","abstract_html":"The United States Naval Facilities Engineering Command awarded over 1-billion dollars in construction contracts in 1990 and is expected to increase that figure in 1991. These contracts will be awarded all over the world. They will range in size from five thousand dollar playgrounds to hundred million dollar buildings. The objective of this paper is to develop a guide that will allow contractors to make a smooth transition from contracting with other sources into contracting with the United States Navy. It will cover various areas that often lead to difficulties for contractors unfamiliar with Navy construction contracting. Also the guide will provide an overview of the entire contracting experience from reading the advertisement for the job, to the warranty period after construction. It should be understood that the information presented in this guide applies to the most common type of construction contract used by the Navy - fixed price/lump sum.","abstract_has_math":false,"creators":["Manning, Cameron Alan"],"institution":"University of Florida","degree_name":"Master of Engineering","degree_level":"Masters","degree_discipline":"Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1991,"date_issued":"1991","date_published":"1991","updated_at":"2026-11-21T22:38:23Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["AAE6122XP"],"render_values":[{"text":"AAE6122XP","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/43776","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/43776","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F43776","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Manning, Cameron Alan"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["Summer 1991"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-11-20T21:36:30Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-11-20T21:36:30Z"]},{"key":"dc:date.issued","label":"Date","values":["1991"]},{"key":"dc:publisher","label":"Institution","values":["University of Florida"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Florida"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["AAE6122XP"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/43776"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The United States Naval Facilities Engineering Command awarded over 1-billion dollars in construction contracts in 1990 and is expected to increase that figure in 1991. These contracts will be awarded all over the world. They will range in size from five thousand dollar playgrounds to hundred million dollar buildings. The objective of this paper is to develop a guide that will allow contractors to make a smooth transition from contracting with other sources into contracting with the United States Navy. It will cover various areas that often lead to difficulties for contractors unfamiliar with Navy construction contracting. Also the guide will provide an overview of the entire contracting experience from reading the advertisement for the job, to the warranty period after construction. It should be understood that the information presented in this guide applies to the most common type of construction contract used by the Navy - fixed price/lump sum."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/aguideforprospec1094543776"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["134 leaves."]},{"key":"dc:title","label":"Title","values":["A guide for the prospective Navy contractor"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Manning, Cameron Alan"],"dc:date":["Summer 1991"],"dc:date.accessioned":["2014-11-20T21:36:30Z"],"dc:date.available":["2014-11-20T21:36:30Z"],"dc:date.issued":["1991"],"dc:description.abstract":["The United States Naval Facilities Engineering Command awarded over 1-billion dollars in construction contracts in 1990 and is expected to increase that figure in 1991. These contracts will be awarded all over the world. They will range in size from five thousand dollar playgrounds to hundred million dollar buildings. The objective of this paper is to develop a guide that will allow contractors to make a smooth transition from contracting with other sources into contracting with the United States Navy. It will cover various areas that often lead to difficulties for contractors unfamiliar with Navy construction contracting. Also the guide will provide an overview of the entire contracting experience from reading the advertisement for the job, to the warranty period after construction. It should be understood that the information presented in this guide applies to the most common type of construction contract used by the Navy - fixed price/lump sum."],"dc:description.uri":["http://archive.org/details/aguideforprospec1094543776"],"dc:format.extent":["134 leaves."],"dc:identifier.oclc":["AAE6122XP"],"dc:identifier.uri":["https://hdl.handle.net/10945/43776"],"dc:publisher":["University of Florida"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["A guide for the prospective Navy contractor"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Engineering"],"thesis:institution_name":["University of Florida"]},"updated_at":"2026-11-21T22:38:23Z"}