{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/43857"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/43857","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Operation and Funding of the Regional Wartime Construction Manager","abstract":"This thesis prepares a training exercise scenario for the Navy's Regional Wartime Construction Manager - Mediterranean (RWCM). The RWCM is a reserve organization which has the responsibility for wartime or contingency construction management. To aid in the training exercise cf the management of resources, a Resource Cost Model is developed. First, a context for the use of the model is provided by examining the two funds used in contingency construction; Operations and Maintenance (0 & M) and Military Construction (MILCON). Next, the policies of Titles 10 and 41 of the U.S. Code, which permit the use of unobligated MILCON funds and deficiency spending, are discussed. Finally, the direct labor and overhead costs of the RWCM1 staff, the deputy, and the area managers are estimated. The total cost is estimated to range from $12.5 to $15.2 million per year.","abstract_html":"This thesis prepares a training exercise scenario for the Navy&#x27;s Regional Wartime Construction Manager - Mediterranean (RWCM). The RWCM is a reserve organization which has the responsibility for wartime or contingency construction management. To aid in the training exercise cf the management of resources, a Resource Cost Model is developed. First, a context for the use of the model is provided by examining the two funds used in contingency construction; Operations and Maintenance (0 &amp; M) and Military Construction (MILCON). Next, the policies of Titles 10 and 41 of the U.S. Code, which permit the use of unobligated MILCON funds and deficiency spending, are discussed. Finally, the direct labor and overhead costs of the RWCM1 staff, the deputy, and the area managers are estimated. The total cost is estimated to range from $12.5 to $15.2 million per year.","abstract_has_math":true,"creators":["Cook, Paul Stephen"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Fremgen, James M."],"committee_chairs":[],"committee_members":["Suchan, James E."],"year":1990,"date_issued":"1990-12","date_published":"1990-12","updated_at":"2026-11-26T00:13:43Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.citation","label":"Dc Identifier Citation","values":["AD-A241 665"],"render_values":[{"text":"AD-A241 665","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/43857","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/43857","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F43857","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F43857","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Fremgen, James M."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Suchan, James E."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:creator","label":"Author","values":["Cook, Paul Stephen"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["Dec 1990"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-12-05T18:37:19Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-12-05T18:37:19Z"]},{"key":"dc:date.issued","label":"Date","values":["1990-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Regional Wartime Construction Manager","Wartime Construction Funding","Wartime Construction Exercise"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.citation","label":"Dc Identifier Citation","values":["AD-A241 665"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/43857"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis prepares a training exercise scenario for the Navy's Regional Wartime Construction Manager - Mediterranean (RWCM). The RWCM is a reserve organization which has the responsibility for wartime or contingency construction management. To aid in the training exercise cf the management of resources, a Resource Cost Model is developed. First, a context for the use of the model is provided by examining the two funds used in contingency construction; Operations and Maintenance (0 & M) and Military Construction (MILCON). Next, the policies of Titles 10 and 41 of the U.S. Code, which permit the use of unobligated MILCON funds and deficiency spending, are discussed. Finally, the direct labor and overhead costs of the RWCM1 staff, the deputy, and the area managers are estimated. The total cost is estimated to range from $12.5 to $15.2 million per year."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/operationndfundi1094543857"]},{"key":"dc:title","label":"Title","values":["Operation and Funding of the Regional Wartime Construction Manager"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Fremgen, James M."],"dc:contributor.committeemember":["Suchan, James E."],"dc:contributor.department":["Administrative Sciences"],"dc:creator":["Cook, Paul Stephen"],"dc:date":["Dec 1990"],"dc:date.accessioned":["2014-12-05T18:37:19Z"],"dc:date.available":["2014-12-05T18:37:19Z"],"dc:date.issued":["1990-12"],"dc:description.abstract":["This thesis prepares a training exercise scenario for the Navy's Regional Wartime Construction Manager - Mediterranean (RWCM). The RWCM is a reserve organization which has the responsibility for wartime or contingency construction management. To aid in the training exercise cf the management of resources, a Resource Cost Model is developed. First, a context for the use of the model is provided by examining the two funds used in contingency construction; Operations and Maintenance (0 & M) and Military Construction (MILCON). Next, the policies of Titles 10 and 41 of the U.S. Code, which permit the use of unobligated MILCON funds and deficiency spending, are discussed. Finally, the direct labor and overhead costs of the RWCM1 staff, the deputy, and the area managers are estimated. The total cost is estimated to range from $12.5 to $15.2 million per year."],"dc:description.uri":["http://archive.org/details/operationndfundi1094543857"],"dc:identifier.citation":["AD-A241 665"],"dc:identifier.uri":["https://hdl.handle.net/10945/43857"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Regional Wartime Construction Manager","Wartime Construction Funding","Wartime Construction Exercise"],"dc:title":["Operation and Funding of the Regional Wartime Construction Manager"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:13:43Z"}