{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/43985"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/43985","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Improving legacy aircraft systems through Condition-Based Maintenance: an H-60 case study","abstract":"Condition-Based Maintenance (CBM) has been the focus of Department of Defense efforts to reduce the cost of maintaining weapons systems for nearly two decades. Through an investigation of the MH-60S helicopter, this paper uses a gap analysis framework to determine the value of increasing CBM usage. The Naval Aviation Maintenance Program (NAMP) has used scheduled inspections as the backbone of aviation maintenance since 1959. The most significant of these inspections is the phase cycle, which provides inspection of aircraft components based on flight hours. This study uses the MH-60S to conduct a capability gap analysis for CBM in naval aviation. Through the use of a JCIDS Capabilities Based Assessment, the capability gap between the CBM enabling IMD-HUMS and the NAMP phase cycle is determined. From this gap analysis, Earned Value Management (EVM) tools determine the value of closing the CBM capability gap between the phase maintenance and IMD-HUMS in terms of cost and safety. Finally, an alternative phase maintenance structure is proposed for MH-60S maintenance which leverages the CBM capabilities of the IMD-HUMS to reduce total lifecycle costs.","abstract_html":"Condition-Based Maintenance (CBM) has been the focus of Department of Defense efforts to reduce the cost of maintaining weapons systems for nearly two decades. Through an investigation of the MH-60S helicopter, this paper uses a gap analysis framework to determine the value of increasing CBM usage. The Naval Aviation Maintenance Program (NAMP) has used scheduled inspections as the backbone of aviation maintenance since 1959. The most significant of these inspections is the phase cycle, which provides inspection of aircraft components based on flight hours. This study uses the MH-60S to conduct a capability gap analysis for CBM in naval aviation. Through the use of a JCIDS Capabilities Based Assessment, the capability gap between the CBM enabling IMD-HUMS and the NAMP phase cycle is determined. From this gap analysis, Earned Value Management (EVM) tools determine the value of closing the CBM capability gap between the phase maintenance and IMD-HUMS in terms of cost and safety. Finally, an alternative phase maintenance structure is proposed for MH-60S maintenance which leverages the CBM capabilities of the IMD-HUMS to reduce total lifecycle costs.","abstract_has_math":false,"creators":["Reeder, Joshua A."],"institution":"Monterey, California: Naval Postgraduate School","degree_name":"Master of Science in Systems Engineering Management","degree_level":"Masters","degree_discipline":"Systems Engineering Management","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Langford, Gary"],"committee_chairs":[],"committee_members":["Millar, Richard C."],"year":2014,"date_issued":"2014-09","date_published":"2014-09","updated_at":"2026-11-19T06:35:21Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/43985","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/43985","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F43985","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F43985","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Langford, Gary"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Millar, Richard C."]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["Reeder, Joshua A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["Sep-14"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-12-05T20:10:46Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-12-05T20:10:46Z"]},{"key":"dc:date.issued","label":"Date","values":["2014-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California: Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["NPS Outstanding Theses and Dissertations"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["c5e66392-520c-4aaf-9b4f-370ce82b601f"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Systems Engineering Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Naval Aviation","Condition-Based Maintenance (CBM)","Gap Analysis","Naval Aviation Maintenance Program (NAMP)","Value Engineering","Earned Value Management","MH-60S","Phase Maintenance"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/43985"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Condition-Based Maintenance (CBM) has been the focus of Department of Defense efforts to reduce the cost of maintaining weapons systems for nearly two decades. Through an investigation of the MH-60S helicopter, this paper uses a gap analysis framework to determine the value of increasing CBM usage. The Naval Aviation Maintenance Program (NAMP) has used scheduled inspections as the backbone of aviation maintenance since 1959. The most significant of these inspections is the phase cycle, which provides inspection of aircraft components based on flight hours. This study uses the MH-60S to conduct a capability gap analysis for CBM in naval aviation. Through the use of a JCIDS Capabilities Based Assessment, the capability gap between the CBM enabling IMD-HUMS and the NAMP phase cycle is determined. From this gap analysis, Earned Value Management (EVM) tools determine the value of closing the CBM capability gap between the phase maintenance and IMD-HUMS in terms of cost and safety. Finally, an alternative phase maintenance structure is proposed for MH-60S maintenance which leverages the CBM capabilities of the IMD-HUMS to reduce total lifecycle costs."]},{"key":"dc:description.award","label":"Dc Description Award","values":["Outstanding Thesis"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/improvinglegacyi1094543985"]},{"key":"dc:title","label":"Title","values":["Improving legacy aircraft systems through Condition-Based Maintenance: an H-60 case study"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Langford, Gary"],"dc:contributor.committeemember":["Millar, Richard C."],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["Reeder, Joshua A."],"dc:date":["Sep-14"],"dc:date.accessioned":["2014-12-05T20:10:46Z"],"dc:date.available":["2014-12-05T20:10:46Z"],"dc:date.issued":["2014-09"],"dc:description.abstract":["Condition-Based Maintenance (CBM) has been the focus of Department of Defense efforts to reduce the cost of maintaining weapons systems for nearly two decades. Through an investigation of the MH-60S helicopter, this paper uses a gap analysis framework to determine the value of increasing CBM usage. The Naval Aviation Maintenance Program (NAMP) has used scheduled inspections as the backbone of aviation maintenance since 1959. The most significant of these inspections is the phase cycle, which provides inspection of aircraft components based on flight hours. This study uses the MH-60S to conduct a capability gap analysis for CBM in naval aviation. Through the use of a JCIDS Capabilities Based Assessment, the capability gap between the CBM enabling IMD-HUMS and the NAMP phase cycle is determined. From this gap analysis, Earned Value Management (EVM) tools determine the value of closing the CBM capability gap between the phase maintenance and IMD-HUMS in terms of cost and safety. Finally, an alternative phase maintenance structure is proposed for MH-60S maintenance which leverages the CBM capabilities of the IMD-HUMS to reduce total lifecycle costs."],"dc:description.award":["Outstanding Thesis"],"dc:description.uri":["http://archive.org/details/improvinglegacyi1094543985"],"dc:identifier.uri":["https://hdl.handle.net/10945/43985"],"dc:publisher":["Monterey, California: Naval Postgraduate School"],"dc:relation.ispartofseries":["NPS Outstanding Theses and Dissertations"],"dc:relation.seriesentity":["c5e66392-520c-4aaf-9b4f-370ce82b601f"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Naval Aviation","Condition-Based Maintenance (CBM)","Gap Analysis","Naval Aviation Maintenance Program (NAMP)","Value Engineering","Earned Value Management","MH-60S","Phase Maintenance"],"dc:title":["Improving legacy aircraft systems through Condition-Based Maintenance: an H-60 case study"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Systems Engineering Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Systems Engineering Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:35:21Z"}