{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/44020"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/44020","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An analysis of the U.S. Navy P-3C Orion service life extension program","abstract":"The P-3 service life extension program (SLEP) served to extend the P-3’s capabilities. The P-3 fulfilled a wide breadth of mission sets, ranging from overland ground troops support to littoral surveillance to hunting submarines. Answering the demand for multi-mission capability, the 24-year-old P-3 entered a sustained readiness program (SRP), extending its airframe from its current 29- year service life to its limited fatigue life of 38 years. Unexpected findings, however, arose during SRP. The P-3s had so much corrosion that SRP contract could not sustain the 221 aircraft fleet. As such, the aircraft went through a service life assessment program (SLAP) to determine not only the severity of the corrosion problem, but also the structural life remaining on the airframe. In addition, SLAP offered corrective structural remedies if the aircraft were suitable for SLEP. SLAP results were promising: The airframe can be extended by another lifetime. With new wings and a fatigue life management program, the P-3 could safely execute its missions for an additional two decades, satisfying the constant demand. Five years into SLEP, however, many P-3s were grounded due to out-of-tolerance wing cracks, leaving a third of its fleet on the ramp. This thesis analyzes the challenges of SLEP.","abstract_html":"The P-3 service life extension program (SLEP) served to extend the P-3’s capabilities. The P-3 fulfilled a wide breadth of mission sets, ranging from overland ground troops support to littoral surveillance to hunting submarines. Answering the demand for multi-mission capability, the 24-year-old P-3 entered a sustained readiness program (SRP), extending its airframe from its current 29- year service life to its limited fatigue life of 38 years. Unexpected findings, however, arose during SRP. The P-3s had so much corrosion that SRP contract could not sustain the 221 aircraft fleet. As such, the aircraft went through a service life assessment program (SLAP) to determine not only the severity of the corrosion problem, but also the structural life remaining on the airframe. In addition, SLAP offered corrective structural remedies if the aircraft were suitable for SLEP. SLAP results were promising: The airframe can be extended by another lifetime. With new wings and a fatigue life management program, the P-3 could safely execute its missions for an additional two decades, satisfying the constant demand. Five years into SLEP, however, many P-3s were grounded due to out-of-tolerance wing cracks, leaving a third of its fleet on the ramp. This thesis analyzes the challenges of SLEP.","abstract_has_math":false,"creators":["Tran, James K."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Program Management","degree_level":"Masters","degree_discipline":"Program Management","degree_department":null,"school":null,"contributors":[],"advisors":["Boudreau, Michael","Reining, James","Naegle, Brad"],"committee_chairs":[],"committee_members":[],"year":2014,"date_issued":"2014-09","date_published":"2014-09","updated_at":"2026-11-19T06:35:21Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/44020","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/44020","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F44020","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F44020","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Boudreau, Michael","Reining, James","Naegle, Brad"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program","Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Tran, James K."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-12-05T20:10:59Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-12-05T20:10:59Z"]},{"key":"dc:date.issued","label":"Date","values":["2014-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c","689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Program Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["P-3C Orion","SLEP","SLAP","SRP"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/44020"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The P-3 service life extension program (SLEP) served to extend the P-3’s capabilities. The P-3 fulfilled a wide breadth of mission sets, ranging from overland ground troops support to littoral surveillance to hunting submarines. Answering the demand for multi-mission capability, the 24-year-old P-3 entered a sustained readiness program (SRP), extending its airframe from its current 29- year service life to its limited fatigue life of 38 years. Unexpected findings, however, arose during SRP. The P-3s had so much corrosion that SRP contract could not sustain the 221 aircraft fleet. As such, the aircraft went through a service life assessment program (SLAP) to determine not only the severity of the corrosion problem, but also the structural life remaining on the airframe. In addition, SLAP offered corrective structural remedies if the aircraft were suitable for SLEP. SLAP results were promising: The airframe can be extended by another lifetime. With new wings and a fatigue life management program, the P-3 could safely execute its missions for an additional two decades, satisfying the constant demand. Five years into SLEP, however, many P-3s were grounded due to out-of-tolerance wing cracks, leaving a third of its fleet on the ramp. This thesis analyzes the challenges of SLEP."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/annalysisofusnav1094544020"]},{"key":"dc:title","label":"Title","values":["An analysis of the U.S. Navy P-3C Orion service life extension program"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Boudreau, Michael","Reining, James","Naegle, Brad"],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program","Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Tran, James K."],"dc:date.accessioned":["2014-12-05T20:10:59Z"],"dc:date.available":["2014-12-05T20:10:59Z"],"dc:date.issued":["2014-09"],"dc:description.abstract":["The P-3 service life extension program (SLEP) served to extend the P-3’s capabilities. The P-3 fulfilled a wide breadth of mission sets, ranging from overland ground troops support to littoral surveillance to hunting submarines. Answering the demand for multi-mission capability, the 24-year-old P-3 entered a sustained readiness program (SRP), extending its airframe from its current 29- year service life to its limited fatigue life of 38 years. Unexpected findings, however, arose during SRP. The P-3s had so much corrosion that SRP contract could not sustain the 221 aircraft fleet. As such, the aircraft went through a service life assessment program (SLAP) to determine not only the severity of the corrosion problem, but also the structural life remaining on the airframe. In addition, SLAP offered corrective structural remedies if the aircraft were suitable for SLEP. SLAP results were promising: The airframe can be extended by another lifetime. With new wings and a fatigue life management program, the P-3 could safely execute its missions for an additional two decades, satisfying the constant demand. Five years into SLEP, however, many P-3s were grounded due to out-of-tolerance wing cracks, leaving a third of its fleet on the ramp. This thesis analyzes the challenges of SLEP."],"dc:description.uri":["http://archive.org/details/annalysisofusnav1094544020"],"dc:identifier.uri":["https://hdl.handle.net/10945/44020"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c","689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["P-3C Orion","SLEP","SLAP","SRP"],"dc:title":["An analysis of the U.S. Navy P-3C Orion service life extension program"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Commander, United States Navy"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Program Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:35:21Z"}