{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/44522"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/44522","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Understanding the current 30-year shipbuilding plan through three models","abstract":"The United States Navy is bound by federal law to annually submit a long-range plan for the construction of naval vessels. As the report represents a possible vision of the future fleet, there is much discussion on its contents and how and why the Navy settled on the numbers contained in the proposal. Viewing the plan as a decision reached by a government entity allows a thorough investigation of the matter utilizing Graham Allison’s approach from his work, Essence of Decision. Through the lenses of rational actor model, organizational behavior model, and government politics model, the Annual Long-Range Plan for Construction of Naval Vessels for FY2015 will be analyzed to better understand the requirements, organizational routines, major players, and special interests that ultimately result in a plan submitted to congress. Through this analysis, a better understanding of the processes, procedures and inner workings of the Navy will become apparent and show the FY2015 Long Range Plan is rather complex and beholden to many stakeholders, each wishing to exert influence over the outcome.","abstract_html":"The United States Navy is bound by federal law to annually submit a long-range plan for the construction of naval vessels. As the report represents a possible vision of the future fleet, there is much discussion on its contents and how and why the Navy settled on the numbers contained in the proposal. Viewing the plan as a decision reached by a government entity allows a thorough investigation of the matter utilizing Graham Allison’s approach from his work, Essence of Decision. Through the lenses of rational actor model, organizational behavior model, and government politics model, the Annual Long-Range Plan for Construction of Naval Vessels for FY2015 will be analyzed to better understand the requirements, organizational routines, major players, and special interests that ultimately result in a plan submitted to congress. Through this analysis, a better understanding of the processes, procedures and inner workings of the Navy will become apparent and show the FY2015 Long Range Plan is rather complex and beholden to many stakeholders, each wishing to exert influence over the outcome.","abstract_has_math":false,"creators":["Blind, Patrick E."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Candreva, Philip"],"committee_chairs":[],"committee_members":["Hocevar, Susan"],"year":2014,"date_issued":"2014-12","date_published":"2014-12","updated_at":"2026-11-19T06:35:21Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/44522","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/44522","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F44522","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Candreva, Philip"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Hocevar, Susan"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Blind, Patrick E."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2015-02-18T00:17:12Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2015-02-18T00:17:12Z"]},{"key":"dc:date.issued","label":"Date","values":["2014-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["ships","shipbuilding","ship procurement","rational actor","organizational behavior","government politics"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/44522"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The United States Navy is bound by federal law to annually submit a long-range plan for the construction of naval vessels. As the report represents a possible vision of the future fleet, there is much discussion on its contents and how and why the Navy settled on the numbers contained in the proposal. Viewing the plan as a decision reached by a government entity allows a thorough investigation of the matter utilizing Graham Allison’s approach from his work, Essence of Decision. Through the lenses of rational actor model, organizational behavior model, and government politics model, the Annual Long-Range Plan for Construction of Naval Vessels for FY2015 will be analyzed to better understand the requirements, organizational routines, major players, and special interests that ultimately result in a plan submitted to congress. Through this analysis, a better understanding of the processes, procedures and inner workings of the Navy will become apparent and show the FY2015 Long Range Plan is rather complex and beholden to many stakeholders, each wishing to exert influence over the outcome."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/understandingcur1094544522"]},{"key":"dc:title","label":"Title","values":["Understanding the current 30-year shipbuilding plan through three models"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Candreva, Philip"],"dc:contributor.committeemember":["Hocevar, Susan"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Blind, Patrick E."],"dc:date.accessioned":["2015-02-18T00:17:12Z"],"dc:date.available":["2015-02-18T00:17:12Z"],"dc:date.issued":["2014-12"],"dc:description.abstract":["The United States Navy is bound by federal law to annually submit a long-range plan for the construction of naval vessels. As the report represents a possible vision of the future fleet, there is much discussion on its contents and how and why the Navy settled on the numbers contained in the proposal. Viewing the plan as a decision reached by a government entity allows a thorough investigation of the matter utilizing Graham Allison’s approach from his work, Essence of Decision. Through the lenses of rational actor model, organizational behavior model, and government politics model, the Annual Long-Range Plan for Construction of Naval Vessels for FY2015 will be analyzed to better understand the requirements, organizational routines, major players, and special interests that ultimately result in a plan submitted to congress. Through this analysis, a better understanding of the processes, procedures and inner workings of the Navy will become apparent and show the FY2015 Long Range Plan is rather complex and beholden to many stakeholders, each wishing to exert influence over the outcome."],"dc:description.uri":["http://archive.org/details/understandingcur1094544522"],"dc:identifier.uri":["https://hdl.handle.net/10945/44522"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["ships","shipbuilding","ship procurement","rational actor","organizational behavior","government politics"],"dc:title":["Understanding the current 30-year shipbuilding plan through three models"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:35:21Z"}