{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/44534"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/44534","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Truth in Negotiations Act: getting the incentives right","abstract":"The Truth In Negotiations Act (TINA) is a contracting statute that has been put into place in order to protect the Department of Defense’s funds by mandating that contractors provide certified cost or pricing data. When cost estimates exceed the TINA threshold ($700,000), and when all other means of negotiating fair and reasonable pricing are not available, TINA ensures that a fair and reasonable price can be determined from the contractor submitted data. Despite its good intentions, TINA remains controversial. Supporters of TINA argue that certified cost or pricing data protects the government’s funding: if a later audit shows pricing deviations, the U.S. government can charge contractors penalties and recoup funds if necessary. Critics of TINA, however, argue that TINA does not provide the right incentives to contractors to induce their best efforts. In fact, with certain types of contracts on the contract type spectrum, the contractor and the government both may benefit if TINA provisions are modified to allow for flexibility with certified cost or pricing data. This study proposes to evaluate TINA from an economic view, with a contracting emphasis on investigating incentives that are generated under TINA.","abstract_html":"The Truth In Negotiations Act (TINA) is a contracting statute that has been put into place in order to protect the Department of Defense’s funds by mandating that contractors provide certified cost or pricing data. When cost estimates exceed the TINA threshold ($700,000), and when all other means of negotiating fair and reasonable pricing are not available, TINA ensures that a fair and reasonable price can be determined from the contractor submitted data. Despite its good intentions, TINA remains controversial. Supporters of TINA argue that certified cost or pricing data protects the government’s funding: if a later audit shows pricing deviations, the U.S. government can charge contractors penalties and recoup funds if necessary. Critics of TINA, however, argue that TINA does not provide the right incentives to contractors to induce their best efforts. In fact, with certain types of contracts on the contract type spectrum, the contractor and the government both may benefit if TINA provisions are modified to allow for flexibility with certified cost or pricing data. This study proposes to evaluate TINA from an economic view, with a contracting emphasis on investigating incentives that are generated under TINA.","abstract_has_math":false,"creators":["Champion, Crystal","Ellen, Meredith","Walk, Jenny"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Wang, Chong","Rendon, Rene"],"committee_chairs":[],"committee_members":[],"year":2014,"date_issued":"2014-12","date_published":"2014-12","updated_at":"2026-11-24T23:54:17Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/44534","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/44534","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F44534","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Wang, Chong","Rendon, Rene"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Champion, Crystal","Ellen, Meredith","Walk, Jenny"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2015-02-18T00:17:22Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2015-02-18T00:17:22Z"]},{"key":"dc:date.issued","label":"Date","values":["2014-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["bf55c4b0-99b5-450e-8fa9-6fff28f4ee3d","6855896f-0800-4ea9-9d08-79cbe76c9d8f"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Truth in Negotiations Act","TINA","DCAA","Fixed-Price","Cost-Reimbursement","Incentives","trends","Policy","Contracting","Defense Contractors","acquisition initiatives"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/44534"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["The Truth In Negotiations Act (TINA) is a contracting statute that has been put into place in order to protect the Department of Defense’s funds by mandating that contractors provide certified cost or pricing data. When cost estimates exceed the TINA threshold ($700,000), and when all other means of negotiating fair and reasonable pricing are not available, TINA ensures that a fair and reasonable price can be determined from the contractor submitted data. Despite its good intentions, TINA remains controversial. Supporters of TINA argue that certified cost or pricing data protects the government’s funding: if a later audit shows pricing deviations, the U.S. government can charge contractors penalties and recoup funds if necessary. Critics of TINA, however, argue that TINA does not provide the right incentives to contractors to induce their best efforts. In fact, with certain types of contracts on the contract type spectrum, the contractor and the government both may benefit if TINA provisions are modified to allow for flexibility with certified cost or pricing data. This study proposes to evaluate TINA from an economic view, with a contracting emphasis on investigating incentives that are generated under TINA."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/truthinnegotiati1094544534"]},{"key":"dc:title","label":"Title","values":["Truth in Negotiations Act: getting the incentives right"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["1st Lieutenant, United States Air Force","Captain, United States Air Force"]}]}],"canonical_facts":{"dc:contributor.advisor":["Wang, Chong","Rendon, Rene"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Champion, Crystal","Ellen, Meredith","Walk, Jenny"],"dc:date.accessioned":["2015-02-18T00:17:22Z"],"dc:date.available":["2015-02-18T00:17:22Z"],"dc:date.issued":["2014-12"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["The Truth In Negotiations Act (TINA) is a contracting statute that has been put into place in order to protect the Department of Defense’s funds by mandating that contractors provide certified cost or pricing data. When cost estimates exceed the TINA threshold ($700,000), and when all other means of negotiating fair and reasonable pricing are not available, TINA ensures that a fair and reasonable price can be determined from the contractor submitted data. Despite its good intentions, TINA remains controversial. Supporters of TINA argue that certified cost or pricing data protects the government’s funding: if a later audit shows pricing deviations, the U.S. government can charge contractors penalties and recoup funds if necessary. Critics of TINA, however, argue that TINA does not provide the right incentives to contractors to induce their best efforts. In fact, with certain types of contracts on the contract type spectrum, the contractor and the government both may benefit if TINA provisions are modified to allow for flexibility with certified cost or pricing data. This study proposes to evaluate TINA from an economic view, with a contracting emphasis on investigating incentives that are generated under TINA."],"dc:description.uri":["http://archive.org/details/truthinnegotiati1094544534"],"dc:identifier.uri":["https://hdl.handle.net/10945/44534"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.advisorentity":["bf55c4b0-99b5-450e-8fa9-6fff28f4ee3d","6855896f-0800-4ea9-9d08-79cbe76c9d8f"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Truth in Negotiations Act","TINA","DCAA","Fixed-Price","Cost-Reimbursement","Incentives","trends","Policy","Contracting","Defense Contractors","acquisition initiatives"],"dc:title":["Truth in Negotiations Act: getting the incentives right"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["1st Lieutenant, United States Air Force","Captain, United States Air Force"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-24T23:54:17Z"}