{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/45241"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/45241","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Meeting the challenge of installing CANES during new ship construction on LPD 28","abstract":"The budget to build ships and modernize and sustain the C4I systems installed is limited. Lead times for contracting are long, while technology changes rapidly after contract award. The shipboard C4I network examined in this thesis typifies this dichotomy. The challenge is to provide the latest shipboard network that meets the C4I capability needs of the warfighter at ship delivery, while at the same time supporting the shipbuilder’s need for Government Furnished Information (GFI) and Government Furnished Equipment (GFE) supporting the Ship Construction schedule. This thesis analyzes whether to install the legacy Shipboard Wide Area Network (SWAN), where the FGI is firm, or install the newer Consolidated Afloat Network Enterprise System (CANES), where the GFI is evolving, on LPD 28 during New Ship Construction. Recommendations include implementation of the Design Budget Approach during New Ship Construction, use of the Systems Engineering (SE) V Method during C4I network system development to verify and validate warfighter requirements can be net, and a commitment to the GFE Program of Record (POR) C4I network solutions.","abstract_html":"The budget to build ships and modernize and sustain the C4I systems installed is limited. Lead times for contracting are long, while technology changes rapidly after contract award. The shipboard C4I network examined in this thesis typifies this dichotomy. The challenge is to provide the latest shipboard network that meets the C4I capability needs of the warfighter at ship delivery, while at the same time supporting the shipbuilder’s need for Government Furnished Information (GFI) and Government Furnished Equipment (GFE) supporting the Ship Construction schedule. This thesis analyzes whether to install the legacy Shipboard Wide Area Network (SWAN), where the FGI is firm, or install the newer Consolidated Afloat Network Enterprise System (CANES), where the GFI is evolving, on LPD 28 during New Ship Construction. Recommendations include implementation of the Design Budget Approach during New Ship Construction, use of the Systems Engineering (SE) V Method during C4I network system development to verify and validate warfighter requirements can be net, and a commitment to the GFE Program of Record (POR) C4I network solutions.","abstract_has_math":false,"creators":["Philpott, Alan D."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Systems Engineering Management","degree_level":"Masters","degree_discipline":"Systems Engineering Management","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Olwell, David H."],"committee_chairs":[],"committee_members":["Madachy, Ray"],"year":2015,"date_issued":"2015-03","date_published":"2015-03","updated_at":"2026-11-19T06:35:40Z","subjects":[],"languages":[],"rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/45241","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/45241","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F45241","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Olwell, David H."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Madachy, Ray"]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["Philpott, Alan D."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2015-05-06T19:17:55Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2015-05-06T19:17:55Z"]},{"key":"dc:date.issued","label":"Date","values":["2015-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["73c095de-fa3b-4d63-8300-9b6aee5b4d62"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Systems Engineering Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Program Management","Acquisition Strategy","Engineering and Manufacturing Development","Naval Information Technology","C4I, technology refresh","New Ship Construction","SCN, Design Budget","Shipbuilding"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/45241"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The budget to build ships and modernize and sustain the C4I systems installed is limited. Lead times for contracting are long, while technology changes rapidly after contract award. The shipboard C4I network examined in this thesis typifies this dichotomy. The challenge is to provide the latest shipboard network that meets the C4I capability needs of the warfighter at ship delivery, while at the same time supporting the shipbuilder’s need for Government Furnished Information (GFI) and Government Furnished Equipment (GFE) supporting the Ship Construction schedule. This thesis analyzes whether to install the legacy Shipboard Wide Area Network (SWAN), where the FGI is firm, or install the newer Consolidated Afloat Network Enterprise System (CANES), where the GFI is evolving, on LPD 28 during New Ship Construction. Recommendations include implementation of the Design Budget Approach during New Ship Construction, use of the Systems Engineering (SE) V Method during C4I network system development to verify and validate warfighter requirements can be net, and a commitment to the GFE Program of Record (POR) C4I network solutions."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/meetingchallenge1094545241"]},{"key":"dc:title","label":"Title","values":["Meeting the challenge of installing CANES during new ship construction on LPD 28"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Program Executive Office C4I"]}]}],"canonical_facts":{"dc:contributor.advisor":["Olwell, David H."],"dc:contributor.committeemember":["Madachy, Ray"],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["Philpott, Alan D."],"dc:date.accessioned":["2015-05-06T19:17:55Z"],"dc:date.available":["2015-05-06T19:17:55Z"],"dc:date.issued":["2015-03"],"dc:description.abstract":["The budget to build ships and modernize and sustain the C4I systems installed is limited. Lead times for contracting are long, while technology changes rapidly after contract award. The shipboard C4I network examined in this thesis typifies this dichotomy. The challenge is to provide the latest shipboard network that meets the C4I capability needs of the warfighter at ship delivery, while at the same time supporting the shipbuilder’s need for Government Furnished Information (GFI) and Government Furnished Equipment (GFE) supporting the Ship Construction schedule. This thesis analyzes whether to install the legacy Shipboard Wide Area Network (SWAN), where the FGI is firm, or install the newer Consolidated Afloat Network Enterprise System (CANES), where the GFI is evolving, on LPD 28 during New Ship Construction. Recommendations include implementation of the Design Budget Approach during New Ship Construction, use of the Systems Engineering (SE) V Method during C4I network system development to verify and validate warfighter requirements can be net, and a commitment to the GFE Program of Record (POR) C4I network solutions."],"dc:description.uri":["http://archive.org/details/meetingchallenge1094545241"],"dc:identifier.uri":["https://hdl.handle.net/10945/45241"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["73c095de-fa3b-4d63-8300-9b6aee5b4d62"],"dc:rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Program Management","Acquisition Strategy","Engineering and Manufacturing Development","Naval Information Technology","C4I, technology refresh","New Ship Construction","SCN, Design Budget","Shipbuilding"],"dc:title":["Meeting the challenge of installing CANES during new ship construction on LPD 28"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Program Executive Office C4I"],"thesis:degree_discipline":["Systems Engineering Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Systems Engineering Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:35:40Z"}