{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/4590"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/4590","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Improving and increasing the efficiency of the P-8A Test Work Description (TWD) process","abstract":"This study's purpose was to identify opportunities to improve the P-8A test working description (TWD) process in support of the P-8A test program. This study researched other NAVAIR test programs that used a contractor and government integrated test approach. This study determined the proper balance of improvements to support the approval of TWDs to keep pace with the testing. The process was functionally decomposed to look for process redundancies, choke points and out-of-sequence sub-processes. Two changes were identified and implemented that reduced the process from five phases to four phases. Corel's iGrafx software was selected to model the process. The model varied TWD development time and test team resource level to analyze alternative TWD development process concepts. Alternatives examined excursions from a baseline condition that was limited by the existing team resource level (the lower bound) to an upper bound that assumed unconstrained resources. The upper bound conditions represented the earliest time the TWDs could be completed. Additional alternatives were analyzed until an \"optimal\" resource level was found that would support the test program. It is recommended this type of modeling be applied to other test programs and systems engineering processes to improve their efficiency.","abstract_html":"This study&#x27;s purpose was to identify opportunities to improve the P-8A test working description (TWD) process in support of the P-8A test program. This study researched other NAVAIR test programs that used a contractor and government integrated test approach. This study determined the proper balance of improvements to support the approval of TWDs to keep pace with the testing. The process was functionally decomposed to look for process redundancies, choke points and out-of-sequence sub-processes. Two changes were identified and implemented that reduced the process from five phases to four phases. Corel&#x27;s iGrafx software was selected to model the process. The model varied TWD development time and test team resource level to analyze alternative TWD development process concepts. Alternatives examined excursions from a baseline condition that was limited by the existing team resource level (the lower bound) to an upper bound that assumed unconstrained resources. The upper bound conditions represented the earliest time the TWDs could be completed. Additional alternatives were analyzed until an &quot;optimal&quot; resource level was found that would support the test program. It is recommended this type of modeling be applied to other test programs and systems engineering processes to improve their efficiency.","abstract_has_math":false,"creators":["McDermott, James W., Jr."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Systems Engineering Management","degree_level":"Masters","degree_discipline":"Systems Engineering Management","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Rhoades, Mark M."],"committee_chairs":[],"committee_members":["Hart, David"],"year":2009,"date_issued":"2009-09","date_published":"2009-09","updated_at":"2026-11-19T06:35:56Z","subjects":[],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["463644886"],"render_values":[{"text":"463644886","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/4590","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/4590","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F4590","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Rhoades, Mark M."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Hart, David"]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Engineering and Applied Science (GSEAS)"]},{"key":"dc:creator","label":"Author","values":["McDermott, James W., Jr."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:42:22Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:42:22Z"]},{"key":"dc:date.issued","label":"Date","values":["2009-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["54cbc27e-a8d1-42ce-b932-4ae5aa4d2386","73c095de-fa3b-4d63-8300-9b6aee5b4d62"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Systems Engineering Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Aircraft Test","Test Working Description","Process Modeling"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["463644886"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/4590"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This study's purpose was to identify opportunities to improve the P-8A test working description (TWD) process in support of the P-8A test program. This study researched other NAVAIR test programs that used a contractor and government integrated test approach. This study determined the proper balance of improvements to support the approval of TWDs to keep pace with the testing. The process was functionally decomposed to look for process redundancies, choke points and out-of-sequence sub-processes. Two changes were identified and implemented that reduced the process from five phases to four phases. Corel's iGrafx software was selected to model the process. The model varied TWD development time and test team resource level to analyze alternative TWD development process concepts. Alternatives examined excursions from a baseline condition that was limited by the existing team resource level (the lower bound) to an upper bound that assumed unconstrained resources. The upper bound conditions represented the earliest time the TWDs could be completed. Additional alternatives were analyzed until an \"optimal\" resource level was found that would support the test program. It is recommended this type of modeling be applied to other test programs and systems engineering processes to improve their efficiency."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/improvingndincre109454590"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["87 p."]},{"key":"dc:title","label":"Title","values":["Improving and increasing the efficiency of the P-8A Test Work Description (TWD) process"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Naval Air Warfare Center, Patuxent River"]}]}],"canonical_facts":{"dc:contributor.advisor":["Rhoades, Mark M."],"dc:contributor.committeemember":["Hart, David"],"dc:contributor.department":["Systems Engineering (SE)"],"dc:contributor.other":["Graduate School of Engineering and Applied Science (GSEAS)"],"dc:creator":["McDermott, James W., Jr."],"dc:date.accessioned":["2012-03-14T17:42:22Z"],"dc:date.available":["2012-03-14T17:42:22Z"],"dc:date.issued":["2009-09"],"dc:description.abstract":["This study's purpose was to identify opportunities to improve the P-8A test working description (TWD) process in support of the P-8A test program. This study researched other NAVAIR test programs that used a contractor and government integrated test approach. This study determined the proper balance of improvements to support the approval of TWDs to keep pace with the testing. The process was functionally decomposed to look for process redundancies, choke points and out-of-sequence sub-processes. Two changes were identified and implemented that reduced the process from five phases to four phases. Corel's iGrafx software was selected to model the process. The model varied TWD development time and test team resource level to analyze alternative TWD development process concepts. Alternatives examined excursions from a baseline condition that was limited by the existing team resource level (the lower bound) to an upper bound that assumed unconstrained resources. The upper bound conditions represented the earliest time the TWDs could be completed. Additional alternatives were analyzed until an \"optimal\" resource level was found that would support the test program. It is recommended this type of modeling be applied to other test programs and systems engineering processes to improve their efficiency."],"dc:description.uri":["http://archive.org/details/improvingndincre109454590"],"dc:format.extent":["87 p."],"dc:identifier.oclc":["463644886"],"dc:identifier.uri":["https://hdl.handle.net/10945/4590"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["54cbc27e-a8d1-42ce-b932-4ae5aa4d2386","73c095de-fa3b-4d63-8300-9b6aee5b4d62"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Aircraft Test","Test Working Description","Process Modeling"],"dc:title":["Improving and increasing the efficiency of the P-8A Test Work Description (TWD) process"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Naval Air Warfare Center, Patuxent River"],"thesis:degree_discipline":["Systems Engineering Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Systems Engineering Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:35:56Z"}