{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/45943"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/45943","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Award fees and their relationship to contract success","abstract":"Award fee contracts are applicable when objective criteria are neither feasible nor effective. They were heavily used to incentivize contractor performance in the procurement of major defense acquisition programs (MDAPs) until 2005, when the Government Accountability Office (GAO) released Report 06-66. The report caused the Department of Defense to shy away from using award fee contracts, resulting in a usage decrease by 46% in 2007 and 85% in 2008. The purpose of this research is to determine whether a relationship exists between award fee contracts and contract success as measured by earned value management (EVM) or contractor performance ratings. Data was collected from a sample of contracts from a major Navy command. Six contract observations were identified as successful contracts, with one contract being labeled a failure. Further analysis showed a positive correlation between award fee decisions and contractor performance ratings on the successful contracts. Although the findings are encouraging, they were not statistically significant due to the small sample size.","abstract_html":"Award fee contracts are applicable when objective criteria are neither feasible nor effective. They were heavily used to incentivize contractor performance in the procurement of major defense acquisition programs (MDAPs) until 2005, when the Government Accountability Office (GAO) released Report 06-66. The report caused the Department of Defense to shy away from using award fee contracts, resulting in a usage decrease by 46% in 2007 and 85% in 2008. The purpose of this research is to determine whether a relationship exists between award fee contracts and contract success as measured by earned value management (EVM) or contractor performance ratings. Data was collected from a sample of contracts from a major Navy command. Six contract observations were identified as successful contracts, with one contract being labeled a failure. Further analysis showed a positive correlation between award fee decisions and contractor performance ratings on the successful contracts. Although the findings are encouraging, they were not statistically significant due to the small sample size.","abstract_has_math":false,"creators":["Sherman, Bran","Lipscomb, Jonathan"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Landale, Karen","Rendon, Rene"],"committee_chairs":[],"committee_members":["Jones, Raymond"],"year":2015,"date_issued":"2015-06","date_published":"2015-06","updated_at":"2026-11-24T23:54:17Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/45943","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/45943","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F45943","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F45943","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Landale, Karen","Rendon, Rene"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Jones, Raymond"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Sherman, Bran","Lipscomb, Jonathan"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2015-08-05T23:06:05Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2015-08-05T23:06:05Z"]},{"key":"dc:date.issued","label":"Date","values":["2015-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["6855896f-0800-4ea9-9d08-79cbe76c9d8f"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Defense Acquisition","Contracting","Defense Contracting","Award Fee","Contractor performance rating","Earned Value Management","GAO Report 06-66"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/45943"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Award fee contracts are applicable when objective criteria are neither feasible nor effective. They were heavily used to incentivize contractor performance in the procurement of major defense acquisition programs (MDAPs) until 2005, when the Government Accountability Office (GAO) released Report 06-66. The report caused the Department of Defense to shy away from using award fee contracts, resulting in a usage decrease by 46% in 2007 and 85% in 2008. The purpose of this research is to determine whether a relationship exists between award fee contracts and contract success as measured by earned value management (EVM) or contractor performance ratings. Data was collected from a sample of contracts from a major Navy command. Six contract observations were identified as successful contracts, with one contract being labeled a failure. Further analysis showed a positive correlation between award fee decisions and contractor performance ratings on the successful contracts. Although the findings are encouraging, they were not statistically significant due to the small sample size."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/awardfeesndirrel1094545943"]},{"key":"dc:title","label":"Title","values":["Award fees and their relationship to contract success"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy","Major, United States Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Landale, Karen","Rendon, Rene"],"dc:contributor.committeemember":["Jones, Raymond"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Sherman, Bran","Lipscomb, Jonathan"],"dc:date.accessioned":["2015-08-05T23:06:05Z"],"dc:date.available":["2015-08-05T23:06:05Z"],"dc:date.issued":["2015-06"],"dc:description.abstract":["Award fee contracts are applicable when objective criteria are neither feasible nor effective. They were heavily used to incentivize contractor performance in the procurement of major defense acquisition programs (MDAPs) until 2005, when the Government Accountability Office (GAO) released Report 06-66. The report caused the Department of Defense to shy away from using award fee contracts, resulting in a usage decrease by 46% in 2007 and 85% in 2008. The purpose of this research is to determine whether a relationship exists between award fee contracts and contract success as measured by earned value management (EVM) or contractor performance ratings. Data was collected from a sample of contracts from a major Navy command. Six contract observations were identified as successful contracts, with one contract being labeled a failure. Further analysis showed a positive correlation between award fee decisions and contractor performance ratings on the successful contracts. Although the findings are encouraging, they were not statistically significant due to the small sample size."],"dc:description.uri":["http://archive.org/details/awardfeesndirrel1094545943"],"dc:identifier.uri":["https://hdl.handle.net/10945/45943"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.advisorentity":["6855896f-0800-4ea9-9d08-79cbe76c9d8f"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Defense Acquisition","Contracting","Defense Contracting","Award Fee","Contractor performance rating","Earned Value Management","GAO Report 06-66"],"dc:title":["Award fees and their relationship to contract success"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy","Major, United States Army"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-24T23:54:17Z"}