{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/47312"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/47312","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An analysis of communication between program managers and contracting officers and its effect on the performance of the Defense Acquisition System","abstract":"The purpose of this research is to investigate the effects of early communication between program managers and contracting officers on the performance of the Defense Acquisition System. To show the need for improvement and to determine problem areas affecting early communication, we used mixed methods’ research to examine current statistics and to conduct in-person interviews. With this research, we found a link between the quality and quantity of communications and the outcome of the program. Communication and program outcomes are linked through contracting products, which are a primary driver of program performance, and are significantly improved by effective and continuous communication. The primary method that significantly affected the quality of communication was to embed the contracting officer within the program office. In cases where this was not possible, it was necessary to align the contracting team organizationally with the requiring activity.","abstract_html":"The purpose of this research is to investigate the effects of early communication between program managers and contracting officers on the performance of the Defense Acquisition System. To show the need for improvement and to determine problem areas affecting early communication, we used mixed methods’ research to examine current statistics and to conduct in-person interviews. With this research, we found a link between the quality and quantity of communications and the outcome of the program. Communication and program outcomes are linked through contracting products, which are a primary driver of program performance, and are significantly improved by effective and continuous communication. The primary method that significantly affected the quality of communication was to embed the contracting officer within the program office. In cases where this was not possible, it was necessary to align the contracting team organizationally with the requiring activity.","abstract_has_math":false,"creators":["Penn, Allison B.","Loya, Michael","Gilbert, Tristan"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Program Management","degree_level":"Masters","degree_discipline":"Program Management","degree_department":null,"school":null,"contributors":[],"advisors":["Yoder, E. Cory","DeJesus, Eladio"],"committee_chairs":[],"committee_members":[],"year":2015,"date_issued":"2015-09","date_published":"2015-09","updated_at":"2026-11-19T06:35:56Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/47312","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/47312","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F47312","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F47312","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Yoder, E. Cory","DeJesus, Eladio"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program","Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Penn, Allison B.","Loya, Michael","Gilbert, Tristan"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2015-11-06T18:22:38Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2015-11-06T18:22:38Z"]},{"key":"dc:date.issued","label":"Date","values":["2015-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c","689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Program Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["program manager","contracting officer","Defense Acquisition System","communication","collaboration"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/47312"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this research is to investigate the effects of early communication between program managers and contracting officers on the performance of the Defense Acquisition System. To show the need for improvement and to determine problem areas affecting early communication, we used mixed methods’ research to examine current statistics and to conduct in-person interviews. With this research, we found a link between the quality and quantity of communications and the outcome of the program. Communication and program outcomes are linked through contracting products, which are a primary driver of program performance, and are significantly improved by effective and continuous communication. The primary method that significantly affected the quality of communication was to embed the contracting officer within the program office. In cases where this was not possible, it was necessary to align the contracting team organizationally with the requiring activity."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/annalysisofcommu1094547312"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["125 p."]},{"key":"dc:title","label":"Title","values":["An analysis of communication between program managers and contracting officers and its effect on the performance of the Defense Acquisition System"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Department of the Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Yoder, E. Cory","DeJesus, Eladio"],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program","Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Penn, Allison B.","Loya, Michael","Gilbert, Tristan"],"dc:date.accessioned":["2015-11-06T18:22:38Z"],"dc:date.available":["2015-11-06T18:22:38Z"],"dc:date.issued":["2015-09"],"dc:description.abstract":["The purpose of this research is to investigate the effects of early communication between program managers and contracting officers on the performance of the Defense Acquisition System. To show the need for improvement and to determine problem areas affecting early communication, we used mixed methods’ research to examine current statistics and to conduct in-person interviews. With this research, we found a link between the quality and quantity of communications and the outcome of the program. Communication and program outcomes are linked through contracting products, which are a primary driver of program performance, and are significantly improved by effective and continuous communication. The primary method that significantly affected the quality of communication was to embed the contracting officer within the program office. In cases where this was not possible, it was necessary to align the contracting team organizationally with the requiring activity."],"dc:description.uri":["http://archive.org/details/annalysisofcommu1094547312"],"dc:format.extent":["125 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/47312"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c","689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:subject.keyword":["program manager","contracting officer","Defense Acquisition System","communication","collaboration"],"dc:title":["An analysis of communication between program managers and contracting officers and its effect on the performance of the Defense Acquisition System"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Department of the Army"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Program Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:35:56Z"}