{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/47335"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/47335","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An adaptive method for scheduling the sequence and route of builder trials for a new ship","abstract":"Before a newly built ship is brought into service, it has to undergo various trials as part of its delivery. The builder shipyard aims at completing the maximum number of trials in the minimum possible time. Many trials have one or more prerequisites and every trial may have certain environmental requirements for its conduct. At sea, the success of any specific trial cannot be guaranteed. A dynamic tool is needed to help decision makers rapidly construct alternative trial sequences after the failure of any trial, and aid them in deciding whether the trials can be continued, or the ship has to return to the harbor for repairs. This thesis develops such an adaptive tool, which generates an optimal sequence and feasible route for conduct of a given set of trials, minimizing the total time required in the absence of failures or adverse environmental conditions. The tool allows the user to generate alternate sequences of trials if an early trial fails. Simulation of the conduct of trials, under varying environmental conditions, reveals that the number of retries is the most important factor affecting the outcomes. It also identifies bottlenecks in the network, providing insight about onboard spare supportability for important systems.","abstract_html":"Before a newly built ship is brought into service, it has to undergo various trials as part of its delivery. The builder shipyard aims at completing the maximum number of trials in the minimum possible time. Many trials have one or more prerequisites and every trial may have certain environmental requirements for its conduct. At sea, the success of any specific trial cannot be guaranteed. A dynamic tool is needed to help decision makers rapidly construct alternative trial sequences after the failure of any trial, and aid them in deciding whether the trials can be continued, or the ship has to return to the harbor for repairs. This thesis develops such an adaptive tool, which generates an optimal sequence and feasible route for conduct of a given set of trials, minimizing the total time required in the absence of failures or adverse environmental conditions. The tool allows the user to generate alternate sequences of trials if an early trial fails. Simulation of the conduct of trials, under varying environmental conditions, reveals that the number of retries is the most important factor affecting the outcomes. It also identifies bottlenecks in the network, providing insight about onboard spare supportability for important systems.","abstract_has_math":false,"creators":["Tahir, Ahmed Raza"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research (OR)","school":null,"contributors":[],"advisors":["Sanchez, Susan M."],"committee_chairs":[],"committee_members":["Solitario, William"],"year":2015,"date_issued":"2015-09","date_published":"2015-09","updated_at":"2026-11-19T06:35:56Z","subjects":[],"languages":[],"rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/47335","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/47335","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F47335","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F47335","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Sanchez, Susan M."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Solitario, William"]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research (OR)"]},{"key":"dc:creator","label":"Author","values":["Tahir, Ahmed Raza"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2015-11-06T18:22:49Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2015-11-06T18:22:49Z"]},{"key":"dc:date.issued","label":"Date","values":["2015-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["NPS Outstanding Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["58745961-c46a-45ad-ae9c-d139d1ba1041"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["c5e66392-520c-4aaf-9b4f-370ce82b601f"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["builder trials","optimal sequence and route","robust solution","layered network","shortest path","design of experiments","simulation"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/47335"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Before a newly built ship is brought into service, it has to undergo various trials as part of its delivery. The builder shipyard aims at completing the maximum number of trials in the minimum possible time. Many trials have one or more prerequisites and every trial may have certain environmental requirements for its conduct. At sea, the success of any specific trial cannot be guaranteed. A dynamic tool is needed to help decision makers rapidly construct alternative trial sequences after the failure of any trial, and aid them in deciding whether the trials can be continued, or the ship has to return to the harbor for repairs. This thesis develops such an adaptive tool, which generates an optimal sequence and feasible route for conduct of a given set of trials, minimizing the total time required in the absence of failures or adverse environmental conditions. The tool allows the user to generate alternate sequences of trials if an early trial fails. Simulation of the conduct of trials, under varying environmental conditions, reveals that the number of retries is the most important factor affecting the outcomes. It also identifies bottlenecks in the network, providing insight about onboard spare supportability for important systems."]},{"key":"dc:description.award","label":"Dc Description Award","values":["Outstanding Thesis"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/andaptivemethodf1094547335"]},{"key":"dc:title","label":"Title","values":["An adaptive method for scheduling the sequence and route of builder trials for a new ship"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, Pakistan Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Sanchez, Susan M."],"dc:contributor.committeemember":["Solitario, William"],"dc:contributor.department":["Operations Research (OR)"],"dc:creator":["Tahir, Ahmed Raza"],"dc:date.accessioned":["2015-11-06T18:22:49Z"],"dc:date.available":["2015-11-06T18:22:49Z"],"dc:date.issued":["2015-09"],"dc:description.abstract":["Before a newly built ship is brought into service, it has to undergo various trials as part of its delivery. The builder shipyard aims at completing the maximum number of trials in the minimum possible time. Many trials have one or more prerequisites and every trial may have certain environmental requirements for its conduct. At sea, the success of any specific trial cannot be guaranteed. A dynamic tool is needed to help decision makers rapidly construct alternative trial sequences after the failure of any trial, and aid them in deciding whether the trials can be continued, or the ship has to return to the harbor for repairs. This thesis develops such an adaptive tool, which generates an optimal sequence and feasible route for conduct of a given set of trials, minimizing the total time required in the absence of failures or adverse environmental conditions. The tool allows the user to generate alternate sequences of trials if an early trial fails. Simulation of the conduct of trials, under varying environmental conditions, reveals that the number of retries is the most important factor affecting the outcomes. It also identifies bottlenecks in the network, providing insight about onboard spare supportability for important systems."],"dc:description.award":["Outstanding Thesis"],"dc:description.uri":["http://archive.org/details/andaptivemethodf1094547335"],"dc:identifier.uri":["https://hdl.handle.net/10945/47335"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["NPS Outstanding Theses and Dissertations"],"dc:relation.orgunit":["58745961-c46a-45ad-ae9c-d139d1ba1041"],"dc:relation.seriesentity":["c5e66392-520c-4aaf-9b4f-370ce82b601f"],"dc:rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["builder trials","optimal sequence and route","robust solution","layered network","shortest path","design of experiments","simulation"],"dc:title":["An adaptive method for scheduling the sequence and route of builder trials for a new ship"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, Pakistan Navy"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:35:56Z"}