{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/4937"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/4937","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A quantitative methodology for mapping project costs to engineering decisions in Naval Ship Design and procurement","abstract":"Alternative methods for cost estimation are important in the early conceptual stages of a design when there is not enough detail to allow for a traditional quantity takeoff estimate to be performed. Much of the budgeting process takes place during the early stages of a design and it is important to be able to develop a budget quality estimate so a design is allocated the necessary resources to meet stakeholder requirements. Accurate project cost estimates early in the planning and design processes can also serve as a cost-control measure to assist in managing the design process. With an understanding of the most significant engineering decisions that affect project costs, project team members and stakeholders can proactively make cost-effective decisions during the design process rather than after construction begins and it is too late to prevent going over budget. This research examines the potential of Artificial Neural Networks (ANNs) as a tool to support the tasks of cost prediction, mapping costs to engineering decisions, and risk management during the early stages of a design's life-cycle. ANNs are a modeling tool based on the computational paradigm of the human brain and have proved to be a robust and reliable method for prediction, ranking, classification, and interpretation or processing of data.","abstract_html":"Alternative methods for cost estimation are important in the early conceptual stages of a design when there is not enough detail to allow for a traditional quantity takeoff estimate to be performed. Much of the budgeting process takes place during the early stages of a design and it is important to be able to develop a budget quality estimate so a design is allocated the necessary resources to meet stakeholder requirements. Accurate project cost estimates early in the planning and design processes can also serve as a cost-control measure to assist in managing the design process. With an understanding of the most significant engineering decisions that affect project costs, project team members and stakeholders can proactively make cost-effective decisions during the design process rather than after construction begins and it is too late to prevent going over budget. This research examines the potential of Artificial Neural Networks (ANNs) as a tool to support the tasks of cost prediction, mapping costs to engineering decisions, and risk management during the early stages of a design&#x27;s life-cycle. ANNs are a modeling tool based on the computational paradigm of the human brain and have proved to be a robust and reliable method for prediction, ranking, classification, and interpretation or processing of data.","abstract_has_math":false,"creators":["Netemeyer, Kristopher David"],"institution":"Massachusetts Institute of Technology","degree_name":"Naval Engineer","degree_level":"Masters","degree_discipline":"Naval Engineer","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2010,"date_issued":"2010-06","date_published":"2010-06","updated_at":"2026-11-19T06:36:28Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["768775110"],"render_values":[{"text":"768775110","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/4937","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/4937","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F4937","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Netemeyer, Kristopher David"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:43:39Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:43:39Z"]},{"key":"dc:date.issued","label":"Date","values":["2010-06"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Naval Engineer","Engineering and Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Naval Engineer","Master of Science in Engineering and Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Massachusetts Institute of Technology"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["768775110"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/4937"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Alternative methods for cost estimation are important in the early conceptual stages of a design when there is not enough detail to allow for a traditional quantity takeoff estimate to be performed. Much of the budgeting process takes place during the early stages of a design and it is important to be able to develop a budget quality estimate so a design is allocated the necessary resources to meet stakeholder requirements. Accurate project cost estimates early in the planning and design processes can also serve as a cost-control measure to assist in managing the design process. With an understanding of the most significant engineering decisions that affect project costs, project team members and stakeholders can proactively make cost-effective decisions during the design process rather than after construction begins and it is too late to prevent going over budget. This research examines the potential of Artificial Neural Networks (ANNs) as a tool to support the tasks of cost prediction, mapping costs to engineering decisions, and risk management during the early stages of a design's life-cycle. ANNs are a modeling tool based on the computational paradigm of the human brain and have proved to be a robust and reliable method for prediction, ranking, classification, and interpretation or processing of data."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/aquantitativemet109454937"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["177 p."]},{"key":"dc:title","label":"Title","values":["A quantitative methodology for mapping project costs to engineering decisions in Naval Ship Design and procurement"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Netemeyer, Kristopher David"],"dc:date.accessioned":["2012-03-14T17:43:39Z"],"dc:date.available":["2012-03-14T17:43:39Z"],"dc:date.issued":["2010-06"],"dc:description.abstract":["Alternative methods for cost estimation are important in the early conceptual stages of a design when there is not enough detail to allow for a traditional quantity takeoff estimate to be performed. Much of the budgeting process takes place during the early stages of a design and it is important to be able to develop a budget quality estimate so a design is allocated the necessary resources to meet stakeholder requirements. Accurate project cost estimates early in the planning and design processes can also serve as a cost-control measure to assist in managing the design process. With an understanding of the most significant engineering decisions that affect project costs, project team members and stakeholders can proactively make cost-effective decisions during the design process rather than after construction begins and it is too late to prevent going over budget. This research examines the potential of Artificial Neural Networks (ANNs) as a tool to support the tasks of cost prediction, mapping costs to engineering decisions, and risk management during the early stages of a design's life-cycle. ANNs are a modeling tool based on the computational paradigm of the human brain and have proved to be a robust and reliable method for prediction, ranking, classification, and interpretation or processing of data."],"dc:description.uri":["http://archive.org/details/aquantitativemet109454937"],"dc:format.extent":["177 p."],"dc:identifier.oclc":["768775110"],"dc:identifier.uri":["https://hdl.handle.net/10945/4937"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:title":["A quantitative methodology for mapping project costs to engineering decisions in Naval Ship Design and procurement"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Naval Engineer","Engineering and Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Naval Engineer","Master of Science in Engineering and Management"],"thesis:institution_name":["Massachusetts Institute of Technology"]},"updated_at":"2026-11-19T06:36:28Z"}