{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/49470"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/49470","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Optimizing maintenance manpower for USMC F/A-18 squadrons","abstract":"United States Marine Corps F/A-18 squadrons face increasing maintenance requirements to keep their aging aircraft operationally ready. Each squadron maintenance department has six production work centers (WCs) that specialize in different maintenance activities. Each Marine in one of the six production WCs belongs to one of three categories of experience level, with some maintenance actions requiring certification by a member of the most experienced category before an aircraft can fly. This thesis formulates the Manpower Validation Planner (MVP), an integer linear program that daily assigns tasks to available Marines from each WC and experience level to a squadron's maintenance actions, with the requirement to keep a standard number of aircraft operationally ready. We demonstrate the MVP using two years of daily maintenance and manning data from five F/A-18 squadrons to calculate the number of used, unused, and deficit hours of work. Our baseline analysis shows the majority of WCs in an F/A-18 maintenance department have sufficient manpower available, but that two WCs are overtasked. Additional analysis shows the impossibility of keeping the required number of aircraft operationally ready given the time available to fix aircraft and evaluates mitigation strategies.","abstract_html":"United States Marine Corps F/A-18 squadrons face increasing maintenance requirements to keep their aging aircraft operationally ready. Each squadron maintenance department has six production work centers (WCs) that specialize in different maintenance activities. Each Marine in one of the six production WCs belongs to one of three categories of experience level, with some maintenance actions requiring certification by a member of the most experienced category before an aircraft can fly. This thesis formulates the Manpower Validation Planner (MVP), an integer linear program that daily assigns tasks to available Marines from each WC and experience level to a squadron&#x27;s maintenance actions, with the requirement to keep a standard number of aircraft operationally ready. We demonstrate the MVP using two years of daily maintenance and manning data from five F/A-18 squadrons to calculate the number of used, unused, and deficit hours of work. Our baseline analysis shows the majority of WCs in an F/A-18 maintenance department have sufficient manpower available, but that two WCs are overtasked. Additional analysis shows the impossibility of keeping the required number of aircraft operationally ready given the time available to fix aircraft and evaluates mitigation strategies.","abstract_has_math":false,"creators":["Goodwin, Kevin J."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research (OR)","school":null,"contributors":[],"advisors":["Carlyle, W. Matthew","Dell, Robert F."],"committee_chairs":[],"committee_members":["Hyink, Jeffrey F."],"year":2016,"date_issued":"2016-06","date_published":"2016-06","updated_at":"2026-11-19T06:36:48Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/49470","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/49470","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F49470","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F49470","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Carlyle, W. Matthew","Dell, Robert F."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Hyink, Jeffrey F."]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research (OR)"]},{"key":"dc:creator","label":"Author","values":["Goodwin, Kevin J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2016-08-02T19:35:03Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2016-08-02T19:35:03Z"]},{"key":"dc:date.issued","label":"Date","values":["2016-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["58745961-c46a-45ad-ae9c-d139d1ba1041"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["optimizing, maintenance manpower, F/A-18, manpower validation planner, RBA"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/49470"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["United States Marine Corps F/A-18 squadrons face increasing maintenance requirements to keep their aging aircraft operationally ready. Each squadron maintenance department has six production work centers (WCs) that specialize in different maintenance activities. Each Marine in one of the six production WCs belongs to one of three categories of experience level, with some maintenance actions requiring certification by a member of the most experienced category before an aircraft can fly. This thesis formulates the Manpower Validation Planner (MVP), an integer linear program that daily assigns tasks to available Marines from each WC and experience level to a squadron's maintenance actions, with the requirement to keep a standard number of aircraft operationally ready. We demonstrate the MVP using two years of daily maintenance and manning data from five F/A-18 squadrons to calculate the number of used, unused, and deficit hours of work. Our baseline analysis shows the majority of WCs in an F/A-18 maintenance department have sufficient manpower available, but that two WCs are overtasked. Additional analysis shows the impossibility of keeping the required number of aircraft operationally ready given the time available to fix aircraft and evaluates mitigation strategies."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/optimizingmainte1094549470"]},{"key":"dc:title","label":"Title","values":["Optimizing maintenance manpower for USMC F/A-18 squadrons"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Major, United States Marine Corps"]}]}],"canonical_facts":{"dc:contributor.advisor":["Carlyle, W. Matthew","Dell, Robert F."],"dc:contributor.committeemember":["Hyink, Jeffrey F."],"dc:contributor.department":["Operations Research (OR)"],"dc:creator":["Goodwin, Kevin J."],"dc:date.accessioned":["2016-08-02T19:35:03Z"],"dc:date.available":["2016-08-02T19:35:03Z"],"dc:date.issued":["2016-06"],"dc:description.abstract":["United States Marine Corps F/A-18 squadrons face increasing maintenance requirements to keep their aging aircraft operationally ready. Each squadron maintenance department has six production work centers (WCs) that specialize in different maintenance activities. Each Marine in one of the six production WCs belongs to one of three categories of experience level, with some maintenance actions requiring certification by a member of the most experienced category before an aircraft can fly. This thesis formulates the Manpower Validation Planner (MVP), an integer linear program that daily assigns tasks to available Marines from each WC and experience level to a squadron's maintenance actions, with the requirement to keep a standard number of aircraft operationally ready. We demonstrate the MVP using two years of daily maintenance and manning data from five F/A-18 squadrons to calculate the number of used, unused, and deficit hours of work. Our baseline analysis shows the majority of WCs in an F/A-18 maintenance department have sufficient manpower available, but that two WCs are overtasked. Additional analysis shows the impossibility of keeping the required number of aircraft operationally ready given the time available to fix aircraft and evaluates mitigation strategies."],"dc:description.uri":["http://archive.org/details/optimizingmainte1094549470"],"dc:identifier.uri":["https://hdl.handle.net/10945/49470"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["58745961-c46a-45ad-ae9c-d139d1ba1041"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["optimizing, maintenance manpower, F/A-18, manpower validation planner, RBA"],"dc:title":["Optimizing maintenance manpower for USMC F/A-18 squadrons"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Major, United States Marine Corps"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:36:48Z"}