{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/5336"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/5336","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Estimating the fully burdened cost of fuel for a naval aviation fixed wing platform","abstract":"This thesis provides the background and motivation for furthering the Fully Burdened Cost of Fuel (FBCF) cost estimating methodology and calculations in the context of a naval aviation fixed wing platform. The FBCF contribution to Total Ownership Cost in the Analysis of Alternatives for Major Defense Acquisition Programs requires steady advancement to meet an October 2011 implementation deadline. Applying OSD guidance and calculator mathematical process facilitates comparison of the additional costs to deliver and protect fuel demanded by the F/A-18E/F aircraft with those added costs for a ship platform. Total costs throughout a realistic operation and support life cycle and applying a notional scenario to the newest calculator demonstrate a range of cost estimating methods. Our conclusions support previous analysis that air refueling contributes significantly to logistics support costs and that investment in fuel conservation technologies and platform endurance can be a strategic opportunity for the Department of Defense and the Department of the Navy. The aircraft FBCF is multiple times higher than the fuel commodity price as compared to the FBCF for ships, which is only fractionally higher than the fuel commodity price. Assured Delivery Price of supplied fuel calculations are complicated for platforms that require multiple refueling support assets.","abstract_html":"This thesis provides the background and motivation for furthering the Fully Burdened Cost of Fuel (FBCF) cost estimating methodology and calculations in the context of a naval aviation fixed wing platform. The FBCF contribution to Total Ownership Cost in the Analysis of Alternatives for Major Defense Acquisition Programs requires steady advancement to meet an October 2011 implementation deadline. Applying OSD guidance and calculator mathematical process facilitates comparison of the additional costs to deliver and protect fuel demanded by the F/A-18E/F aircraft with those added costs for a ship platform. Total costs throughout a realistic operation and support life cycle and applying a notional scenario to the newest calculator demonstrate a range of cost estimating methods. Our conclusions support previous analysis that air refueling contributes significantly to logistics support costs and that investment in fuel conservation technologies and platform endurance can be a strategic opportunity for the Department of Defense and the Department of the Navy. The aircraft FBCF is multiple times higher than the fuel commodity price as compared to the FBCF for ships, which is only fractionally higher than the fuel commodity price. Assured Delivery Price of supplied fuel calculations are complicated for platforms that require multiple refueling support assets.","abstract_has_math":false,"creators":["Truckenbrod, Daniel R."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Nussbaum, Daniel A.","San Miguel, Joseph G."],"committee_chairs":[],"committee_members":[],"year":2010,"date_issued":"2010-06","date_published":"2010-06","updated_at":"2026-11-19T06:37:06Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["648153905"],"render_values":[{"text":"648153905","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/5336","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/5336","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F5336","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Nussbaum, Daniel A.","San Miguel, Joseph G."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Truckenbrod, Daniel R."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:45:05Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:45:05Z"]},{"key":"dc:date.issued","label":"Date","values":["2010-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["NPS Outstanding Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["c5e66392-520c-4aaf-9b4f-370ce82b601f"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Fully Burdened Cost of Fuel","FBCF","Analysis of Alternatives","AOA","Defense Acquisition","acquisition","life-cycle costs","LCC","cost reporting"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["648153905"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/5336"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis provides the background and motivation for furthering the Fully Burdened Cost of Fuel (FBCF) cost estimating methodology and calculations in the context of a naval aviation fixed wing platform. The FBCF contribution to Total Ownership Cost in the Analysis of Alternatives for Major Defense Acquisition Programs requires steady advancement to meet an October 2011 implementation deadline. Applying OSD guidance and calculator mathematical process facilitates comparison of the additional costs to deliver and protect fuel demanded by the F/A-18E/F aircraft with those added costs for a ship platform. Total costs throughout a realistic operation and support life cycle and applying a notional scenario to the newest calculator demonstrate a range of cost estimating methods. Our conclusions support previous analysis that air refueling contributes significantly to logistics support costs and that investment in fuel conservation technologies and platform endurance can be a strategic opportunity for the Department of Defense and the Department of the Navy. The aircraft FBCF is multiple times higher than the fuel commodity price as compared to the FBCF for ships, which is only fractionally higher than the fuel commodity price. Assured Delivery Price of supplied fuel calculations are complicated for platforms that require multiple refueling support assets."]},{"key":"dc:description.award","label":"Dc Description Award","values":["Outstanding Thesis"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/estimatingfullyb109455336"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["105 p."]},{"key":"dc:title","label":"Title","values":["Estimating the fully burdened cost of fuel for a naval aviation fixed wing platform"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Commander, United States Navy"]},{"key":"local:etd.verified","label":"Local Etd Verified","values":["no"]}]}],"canonical_facts":{"dc:contributor.advisor":["Nussbaum, Daniel A.","San Miguel, Joseph G."],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Truckenbrod, Daniel R."],"dc:date.accessioned":["2012-03-14T17:45:05Z"],"dc:date.available":["2012-03-14T17:45:05Z"],"dc:date.issued":["2010-06"],"dc:description.abstract":["This thesis provides the background and motivation for furthering the Fully Burdened Cost of Fuel (FBCF) cost estimating methodology and calculations in the context of a naval aviation fixed wing platform. The FBCF contribution to Total Ownership Cost in the Analysis of Alternatives for Major Defense Acquisition Programs requires steady advancement to meet an October 2011 implementation deadline. Applying OSD guidance and calculator mathematical process facilitates comparison of the additional costs to deliver and protect fuel demanded by the F/A-18E/F aircraft with those added costs for a ship platform. Total costs throughout a realistic operation and support life cycle and applying a notional scenario to the newest calculator demonstrate a range of cost estimating methods. Our conclusions support previous analysis that air refueling contributes significantly to logistics support costs and that investment in fuel conservation technologies and platform endurance can be a strategic opportunity for the Department of Defense and the Department of the Navy. The aircraft FBCF is multiple times higher than the fuel commodity price as compared to the FBCF for ships, which is only fractionally higher than the fuel commodity price. Assured Delivery Price of supplied fuel calculations are complicated for platforms that require multiple refueling support assets."],"dc:description.award":["Outstanding Thesis"],"dc:description.uri":["http://archive.org/details/estimatingfullyb109455336"],"dc:format.extent":["105 p."],"dc:identifier.oclc":["648153905"],"dc:identifier.uri":["https://hdl.handle.net/10945/5336"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["NPS Outstanding Theses and Dissertations"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["c5e66392-520c-4aaf-9b4f-370ce82b601f"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Fully Burdened Cost of Fuel","FBCF","Analysis of Alternatives","AOA","Defense Acquisition","acquisition","life-cycle costs","LCC","cost reporting"],"dc:title":["Estimating the fully burdened cost of fuel for a naval aviation fixed wing platform"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Commander, United States Navy"],"local:etd.verified":["no"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:37:06Z"}