{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/55544"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/55544","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Analysis of return on investment for Naval Air Station Fallon energy project alternatives","abstract":"Energy Savings Performance Contracts (ESPC) are energy-related construction projects that are financed by a non–Department of Defense third party. This type of contract requires the contractor to perform the construction as well as the maintenance of installed equipment during the life of the financing agreement with the Navy. The Commander, Naval Installation Command (CNIC) must give approval for all Navy ESPC projects to proceed. CNICs are not provided future cost analysis to aid in deciding whether to approve or disapprove ESPC projects. Failure to approve the use of the ESPC for the required work will typically mean that the work must wait several years for appropriations funding to become available. During this time, the Navy will not realize the potential energy savings and associated benefits of the energy project. This analysis compares the Return on Investment for five energy project alternatives at Naval Air Station (NAS) Fallon, NV. Of these five, the ESPC alternative has the most benefit per this analysis, saving $1.3M over 20 years. CNIC can use these results to reinforce their decision to proceed with the NAS Fallon ESPC project.","abstract_html":"Energy Savings Performance Contracts (ESPC) are energy-related construction projects that are financed by a non–Department of Defense third party. This type of contract requires the contractor to perform the construction as well as the maintenance of installed equipment during the life of the financing agreement with the Navy. The Commander, Naval Installation Command (CNIC) must give approval for all Navy ESPC projects to proceed. CNICs are not provided future cost analysis to aid in deciding whether to approve or disapprove ESPC projects. Failure to approve the use of the ESPC for the required work will typically mean that the work must wait several years for appropriations funding to become available. During this time, the Navy will not realize the potential energy savings and associated benefits of the energy project. This analysis compares the Return on Investment for five energy project alternatives at Naval Air Station (NAS) Fallon, NV. Of these five, the ESPC alternative has the most benefit per this analysis, saving $1.3M over 20 years. CNIC can use these results to reinforce their decision to proceed with the NAS Fallon ESPC project.","abstract_has_math":false,"creators":["Sweet, Nicholas P."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Sullivan, Ryan"],"committee_chairs":[],"committee_members":["Nussbaum, Daniel"],"year":2017,"date_issued":"2017-06","date_published":"2017-06","updated_at":"2026-11-19T06:37:49Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/55544","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/55544","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F55544","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F55544","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Sullivan, Ryan"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Nussbaum, Daniel"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Sweet, Nicholas P."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["Jun-17"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2017-08-14T16:46:48Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2017-08-14T16:46:48Z"]},{"key":"dc:date.issued","label":"Date","values":["2017-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["energy efficiency","contracting","Energy Savings Performance Contract"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/55544"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Energy Savings Performance Contracts (ESPC) are energy-related construction projects that are financed by a non–Department of Defense third party. This type of contract requires the contractor to perform the construction as well as the maintenance of installed equipment during the life of the financing agreement with the Navy. The Commander, Naval Installation Command (CNIC) must give approval for all Navy ESPC projects to proceed. CNICs are not provided future cost analysis to aid in deciding whether to approve or disapprove ESPC projects. Failure to approve the use of the ESPC for the required work will typically mean that the work must wait several years for appropriations funding to become available. During this time, the Navy will not realize the potential energy savings and associated benefits of the energy project. This analysis compares the Return on Investment for five energy project alternatives at Naval Air Station (NAS) Fallon, NV. Of these five, the ESPC alternative has the most benefit per this analysis, saving $1.3M over 20 years. CNIC can use these results to reinforce their decision to proceed with the NAS Fallon ESPC project."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/analysisofreturn1094555544"]},{"key":"dc:title","label":"Title","values":["Analysis of return on investment for Naval Air Station Fallon energy project alternatives"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Sullivan, Ryan"],"dc:contributor.committeemember":["Nussbaum, Daniel"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Sweet, Nicholas P."],"dc:date":["Jun-17"],"dc:date.accessioned":["2017-08-14T16:46:48Z"],"dc:date.available":["2017-08-14T16:46:48Z"],"dc:date.issued":["2017-06"],"dc:description.abstract":["Energy Savings Performance Contracts (ESPC) are energy-related construction projects that are financed by a non–Department of Defense third party. This type of contract requires the contractor to perform the construction as well as the maintenance of installed equipment during the life of the financing agreement with the Navy. The Commander, Naval Installation Command (CNIC) must give approval for all Navy ESPC projects to proceed. CNICs are not provided future cost analysis to aid in deciding whether to approve or disapprove ESPC projects. Failure to approve the use of the ESPC for the required work will typically mean that the work must wait several years for appropriations funding to become available. During this time, the Navy will not realize the potential energy savings and associated benefits of the energy project. This analysis compares the Return on Investment for five energy project alternatives at Naval Air Station (NAS) Fallon, NV. Of these five, the ESPC alternative has the most benefit per this analysis, saving $1.3M over 20 years. CNIC can use these results to reinforce their decision to proceed with the NAS Fallon ESPC project."],"dc:description.uri":["http://archive.org/details/analysisofreturn1094555544"],"dc:identifier.uri":["https://hdl.handle.net/10945/55544"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["energy efficiency","contracting","Energy Savings Performance Contract"],"dc:title":["Analysis of return on investment for Naval Air Station Fallon energy project alternatives"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:37:49Z"}