{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/55640"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/55640","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Analysis of SSN 688 class submarine maintenance delays","abstract":"The combination of negative real budget growth and unchanged operational use has stressed the resources of the United States Navy, resulting in an annual average over-budget execution of $0.77 billion per year in Navy-wide ship depot maintenance since FY2010. The Navy's active ship maintenance budget only supports 70 percent of the ship maintenance projected in FY2017; a significant portion of over-budget execution and delays has occurred with submarine availabilities. Delays to a submarine's return to the fleet results in a decrease of the overall operational availability (Ao) of already diminishing submarine force levels. In this thesis, data collected from Pearl Harbor Naval Shipyard (PHNSY) is analyzed to investigate possible factors impacting the ability of maintenance activities to complete SSN 688-class submarine maintenance availabilities as scheduled. The analysis illustrates a systematic underestimation of availability duration due to the use of outdated historically based estimates following a significant shift in maintenance strategy in 2012. Additionally, the analysis shows a significant increasing trend in the average number of man-days required to complete a job. This thesis provides a narrowed focus for future studies attempting to determine the cause of this trend. Finally, this thesis proposes a solution to the systematic underestimation of availability durations by illustrating the inherent error in the current equation and providing a notional equation to remove that error.","abstract_html":"The combination of negative real budget growth and unchanged operational use has stressed the resources of the United States Navy, resulting in an annual average over-budget execution of $0.77 billion per year in Navy-wide ship depot maintenance since FY2010. The Navy&#x27;s active ship maintenance budget only supports 70 percent of the ship maintenance projected in FY2017; a significant portion of over-budget execution and delays has occurred with submarine availabilities. Delays to a submarine&#x27;s return to the fleet results in a decrease of the overall operational availability (Ao) of already diminishing submarine force levels. In this thesis, data collected from Pearl Harbor Naval Shipyard (PHNSY) is analyzed to investigate possible factors impacting the ability of maintenance activities to complete SSN 688-class submarine maintenance availabilities as scheduled. The analysis illustrates a systematic underestimation of availability duration due to the use of outdated historically based estimates following a significant shift in maintenance strategy in 2012. Additionally, the analysis shows a significant increasing trend in the average number of man-days required to complete a job. This thesis provides a narrowed focus for future studies attempting to determine the cause of this trend. Finally, this thesis proposes a solution to the systematic underestimation of availability durations by illustrating the inherent error in the current equation and providing a notional equation to remove that error.","abstract_has_math":false,"creators":["Lary, R. Leon, IV"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Dew, Nick","Kang, Keebom"],"committee_chairs":[],"committee_members":[],"year":2017,"date_issued":"2017-06","date_published":"2017-06","updated_at":"2026-11-19T06:37:49Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/55640","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/55640","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F55640","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F55640","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Dew, Nick","Kang, Keebom"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Lary, R. Leon, IV"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["Jun-17"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2017-08-14T16:49:06Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2017-08-14T16:49:06Z"]},{"key":"dc:date.issued","label":"Date","values":["2017-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Submarine","maintenance availability","688","delay","cost","overrun","I-Level","D-Level","TFP Rev B","CPE","duration equation","estimate","DSRA","CMAV","man-days/job","man-day creep","workforce experience levels","shipyard","PHNSY","IMF","facility"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/55640"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The combination of negative real budget growth and unchanged operational use has stressed the resources of the United States Navy, resulting in an annual average over-budget execution of $0.77 billion per year in Navy-wide ship depot maintenance since FY2010. The Navy's active ship maintenance budget only supports 70 percent of the ship maintenance projected in FY2017; a significant portion of over-budget execution and delays has occurred with submarine availabilities. Delays to a submarine's return to the fleet results in a decrease of the overall operational availability (Ao) of already diminishing submarine force levels. In this thesis, data collected from Pearl Harbor Naval Shipyard (PHNSY) is analyzed to investigate possible factors impacting the ability of maintenance activities to complete SSN 688-class submarine maintenance availabilities as scheduled. The analysis illustrates a systematic underestimation of availability duration due to the use of outdated historically based estimates following a significant shift in maintenance strategy in 2012. Additionally, the analysis shows a significant increasing trend in the average number of man-days required to complete a job. This thesis provides a narrowed focus for future studies attempting to determine the cause of this trend. Finally, this thesis proposes a solution to the systematic underestimation of availability durations by illustrating the inherent error in the current equation and providing a notional equation to remove that error."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/analysisofssncla1094555640"]},{"key":"dc:title","label":"Title","values":["Analysis of SSN 688 class submarine maintenance delays"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Dew, Nick","Kang, Keebom"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Lary, R. Leon, IV"],"dc:date":["Jun-17"],"dc:date.accessioned":["2017-08-14T16:49:06Z"],"dc:date.available":["2017-08-14T16:49:06Z"],"dc:date.issued":["2017-06"],"dc:description.abstract":["The combination of negative real budget growth and unchanged operational use has stressed the resources of the United States Navy, resulting in an annual average over-budget execution of $0.77 billion per year in Navy-wide ship depot maintenance since FY2010. The Navy's active ship maintenance budget only supports 70 percent of the ship maintenance projected in FY2017; a significant portion of over-budget execution and delays has occurred with submarine availabilities. Delays to a submarine's return to the fleet results in a decrease of the overall operational availability (Ao) of already diminishing submarine force levels. In this thesis, data collected from Pearl Harbor Naval Shipyard (PHNSY) is analyzed to investigate possible factors impacting the ability of maintenance activities to complete SSN 688-class submarine maintenance availabilities as scheduled. The analysis illustrates a systematic underestimation of availability duration due to the use of outdated historically based estimates following a significant shift in maintenance strategy in 2012. Additionally, the analysis shows a significant increasing trend in the average number of man-days required to complete a job. This thesis provides a narrowed focus for future studies attempting to determine the cause of this trend. Finally, this thesis proposes a solution to the systematic underestimation of availability durations by illustrating the inherent error in the current equation and providing a notional equation to remove that error."],"dc:description.uri":["http://archive.org/details/analysisofssncla1094555640"],"dc:identifier.uri":["https://hdl.handle.net/10945/55640"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Submarine","maintenance availability","688","delay","cost","overrun","I-Level","D-Level","TFP Rev B","CPE","duration equation","estimate","DSRA","CMAV","man-days/job","man-day creep","workforce experience levels","shipyard","PHNSY","IMF","facility"],"dc:title":["Analysis of SSN 688 class submarine maintenance delays"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:37:49Z"}