{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/56139"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/56139","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Selection of an alternative production part approval process to improve weapon systems production readiness","abstract":"This thesis conducted an examination related to the Department of Defense (DOD) weapons systems production approval practices. Current practices result in poor weapons system production outcomes that reduce fleet readiness in DOD weapons systems acquisition. The Government Accountability Office (GAO) has reported concerns related to a lack of manufacturing knowledge at production start as causal to poor production outcomes. A comparison of DOD practices against non-DOD industrial production approval processes addressing causality and improvement opportunity provided new insight not found in acquisition research. An analysis of alternatives identified best practices to improve production capability and readiness. Key findings revealed that the automotive production approval process followed industry best practices that fully addressed problems identified by the GAO. Non-DOD industries used a more prescriptive Quality Management System (QMS) that enabled a more disciplined manufacturing development and demonstration of production capability prior to production commitment. Commercial surveys in the literature confirmed the benefits of the automotive prescriptive QMS. The more successful QMS approach can be applied to DOD acquisition practices reducing costs and improving fleet readiness.","abstract_html":"This thesis conducted an examination related to the Department of Defense (DOD) weapons systems production approval practices. Current practices result in poor weapons system production outcomes that reduce fleet readiness in DOD weapons systems acquisition. The Government Accountability Office (GAO) has reported concerns related to a lack of manufacturing knowledge at production start as causal to poor production outcomes. A comparison of DOD practices against non-DOD industrial production approval processes addressing causality and improvement opportunity provided new insight not found in acquisition research. An analysis of alternatives identified best practices to improve production capability and readiness. Key findings revealed that the automotive production approval process followed industry best practices that fully addressed problems identified by the GAO. Non-DOD industries used a more prescriptive Quality Management System (QMS) that enabled a more disciplined manufacturing development and demonstration of production capability prior to production commitment. Commercial surveys in the literature confirmed the benefits of the automotive prescriptive QMS. The more successful QMS approach can be applied to DOD acquisition practices reducing costs and improving fleet readiness.","abstract_has_math":false,"creators":["Ireland, William C."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Engineering Systems","degree_level":"Masters","degree_discipline":"Engineering Systems","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Johnson, Bonnie","Gehris, Rama"],"committee_chairs":[],"committee_members":[],"year":2017,"date_issued":"2017-09","date_published":"2017-09","updated_at":"2026-11-19T06:37:49Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/56139","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/56139","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F56139","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F56139","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Johnson, Bonnie","Gehris, Rama"]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["Ireland, William C."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["Sep-17"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2017-11-07T23:39:38Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2017-11-07T23:39:38Z"]},{"key":"dc:date.issued","label":"Date","values":["2017-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering Systems"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Engineering Systems"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["production part approval process (PPAP)","advanced product quality planning (APQP)","knowledge-based acquisition","production capability","process capability","production readiness review (PRR)","manufacturing readiness level (MRL)","technical authority (TA)"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/56139"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis conducted an examination related to the Department of Defense (DOD) weapons systems production approval practices. Current practices result in poor weapons system production outcomes that reduce fleet readiness in DOD weapons systems acquisition. The Government Accountability Office (GAO) has reported concerns related to a lack of manufacturing knowledge at production start as causal to poor production outcomes. A comparison of DOD practices against non-DOD industrial production approval processes addressing causality and improvement opportunity provided new insight not found in acquisition research. An analysis of alternatives identified best practices to improve production capability and readiness. Key findings revealed that the automotive production approval process followed industry best practices that fully addressed problems identified by the GAO. Non-DOD industries used a more prescriptive Quality Management System (QMS) that enabled a more disciplined manufacturing development and demonstration of production capability prior to production commitment. Commercial surveys in the literature confirmed the benefits of the automotive prescriptive QMS. The more successful QMS approach can be applied to DOD acquisition practices reducing costs and improving fleet readiness."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/selectionofnlter1094556139"]},{"key":"dc:title","label":"Title","values":["Selection of an alternative production part approval process to improve weapon systems production readiness"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Department of the Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Johnson, Bonnie","Gehris, Rama"],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["Ireland, William C."],"dc:date":["Sep-17"],"dc:date.accessioned":["2017-11-07T23:39:38Z"],"dc:date.available":["2017-11-07T23:39:38Z"],"dc:date.issued":["2017-09"],"dc:description.abstract":["This thesis conducted an examination related to the Department of Defense (DOD) weapons systems production approval practices. Current practices result in poor weapons system production outcomes that reduce fleet readiness in DOD weapons systems acquisition. The Government Accountability Office (GAO) has reported concerns related to a lack of manufacturing knowledge at production start as causal to poor production outcomes. A comparison of DOD practices against non-DOD industrial production approval processes addressing causality and improvement opportunity provided new insight not found in acquisition research. An analysis of alternatives identified best practices to improve production capability and readiness. Key findings revealed that the automotive production approval process followed industry best practices that fully addressed problems identified by the GAO. Non-DOD industries used a more prescriptive Quality Management System (QMS) that enabled a more disciplined manufacturing development and demonstration of production capability prior to production commitment. Commercial surveys in the literature confirmed the benefits of the automotive prescriptive QMS. The more successful QMS approach can be applied to DOD acquisition practices reducing costs and improving fleet readiness."],"dc:description.uri":["http://archive.org/details/selectionofnlter1094556139"],"dc:identifier.uri":["https://hdl.handle.net/10945/56139"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["production part approval process (PPAP)","advanced product quality planning (APQP)","knowledge-based acquisition","production capability","process capability","production readiness review (PRR)","manufacturing readiness level (MRL)","technical authority (TA)"],"dc:title":["Selection of an alternative production part approval process to improve weapon systems production readiness"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Department of the Navy"],"thesis:degree_discipline":["Engineering Systems"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Engineering Systems"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:37:49Z"}