{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/56160"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/56160","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An analysis of the Army’s formal bureaucracy and the impact on acquisition cycles","abstract":"The federal government is considered the largest bureaucracy in the world. This joint applied project explains the impacts of operating in a bureaucratic environment. Bureaucracy, with respect to complex weapon system acquisition, is blamed for many of the programs that fail to meet major milestone decisions. By defining bureaucracy, explaining several bureaucratic models, and introducing decision making in actual Department of Defense (DOD) acquisition, this paper displays acquisition impacts. The paper describes how specific elements in acquisition have negative consequences. In more precise terms, this paper analyzes events in an Army Program Executive Office (PEO), where the Head of Contracting Activities (HCA) was transferred to a single oversight agency, referred to as the Transition Plan. In the Transition Plan, several themes emerged that identify why initial timelines were not met: key leadership turnover, lack of ownership, and a rigid budget cycle. This paper compares Allison’s Organizational Behavior Model (Model II) to the Transition Plan events to determine whether the model accurately depicts the effect of bureaucracy. Our research is not intended to reform acquisition systems by ridding them of bureaucracy, but rather to understand them and their context so we can do a better job of operating and estimating within them.","abstract_html":"The federal government is considered the largest bureaucracy in the world. This joint applied project explains the impacts of operating in a bureaucratic environment. Bureaucracy, with respect to complex weapon system acquisition, is blamed for many of the programs that fail to meet major milestone decisions. By defining bureaucracy, explaining several bureaucratic models, and introducing decision making in actual Department of Defense (DOD) acquisition, this paper displays acquisition impacts. The paper describes how specific elements in acquisition have negative consequences. In more precise terms, this paper analyzes events in an Army Program Executive Office (PEO), where the Head of Contracting Activities (HCA) was transferred to a single oversight agency, referred to as the Transition Plan. In the Transition Plan, several themes emerged that identify why initial timelines were not met: key leadership turnover, lack of ownership, and a rigid budget cycle. This paper compares Allison’s Organizational Behavior Model (Model II) to the Transition Plan events to determine whether the model accurately depicts the effect of bureaucracy. Our research is not intended to reform acquisition systems by ridding them of bureaucracy, but rather to understand them and their context so we can do a better job of operating and estimating within them.","abstract_has_math":false,"creators":["Montgomery, William T.","Laegeler, Shannon L."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Program Management","degree_level":"Masters","degree_discipline":"Program Management","degree_department":null,"school":null,"contributors":[],"advisors":["Pickar, Charles","Mortlock, Robert"],"committee_chairs":[],"committee_members":[],"year":2017,"date_issued":"2017-09","date_published":"2017-09","updated_at":"2026-11-19T06:37:49Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/56160","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/56160","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F56160","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F56160","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Pickar, Charles","Mortlock, Robert"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program","Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Montgomery, William T.","Laegeler, Shannon L."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["Sep-17"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2017-11-07T23:40:12Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2017-11-07T23:40:12Z"]},{"key":"dc:date.issued","label":"Date","values":["2017-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c","689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Program Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["bureaucracy","models","risk","decision-making","acquisition","Department of Defense","Army"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/56160"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The federal government is considered the largest bureaucracy in the world. This joint applied project explains the impacts of operating in a bureaucratic environment. Bureaucracy, with respect to complex weapon system acquisition, is blamed for many of the programs that fail to meet major milestone decisions. By defining bureaucracy, explaining several bureaucratic models, and introducing decision making in actual Department of Defense (DOD) acquisition, this paper displays acquisition impacts. The paper describes how specific elements in acquisition have negative consequences. In more precise terms, this paper analyzes events in an Army Program Executive Office (PEO), where the Head of Contracting Activities (HCA) was transferred to a single oversight agency, referred to as the Transition Plan. In the Transition Plan, several themes emerged that identify why initial timelines were not met: key leadership turnover, lack of ownership, and a rigid budget cycle. This paper compares Allison’s Organizational Behavior Model (Model II) to the Transition Plan events to determine whether the model accurately depicts the effect of bureaucracy. Our research is not intended to reform acquisition systems by ridding them of bureaucracy, but rather to understand them and their context so we can do a better job of operating and estimating within them."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/annalysisofarmys1094556160"]},{"key":"dc:title","label":"Title","values":["An analysis of the Army’s formal bureaucracy and the impact on acquisition cycles"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Department of the Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Pickar, Charles","Mortlock, Robert"],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program","Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Montgomery, William T.","Laegeler, Shannon L."],"dc:date":["Sep-17"],"dc:date.accessioned":["2017-11-07T23:40:12Z"],"dc:date.available":["2017-11-07T23:40:12Z"],"dc:date.issued":["2017-09"],"dc:description.abstract":["The federal government is considered the largest bureaucracy in the world. This joint applied project explains the impacts of operating in a bureaucratic environment. Bureaucracy, with respect to complex weapon system acquisition, is blamed for many of the programs that fail to meet major milestone decisions. By defining bureaucracy, explaining several bureaucratic models, and introducing decision making in actual Department of Defense (DOD) acquisition, this paper displays acquisition impacts. The paper describes how specific elements in acquisition have negative consequences. In more precise terms, this paper analyzes events in an Army Program Executive Office (PEO), where the Head of Contracting Activities (HCA) was transferred to a single oversight agency, referred to as the Transition Plan. In the Transition Plan, several themes emerged that identify why initial timelines were not met: key leadership turnover, lack of ownership, and a rigid budget cycle. This paper compares Allison’s Organizational Behavior Model (Model II) to the Transition Plan events to determine whether the model accurately depicts the effect of bureaucracy. Our research is not intended to reform acquisition systems by ridding them of bureaucracy, but rather to understand them and their context so we can do a better job of operating and estimating within them."],"dc:description.uri":["http://archive.org/details/annalysisofarmys1094556160"],"dc:identifier.uri":["https://hdl.handle.net/10945/56160"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c","689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["bureaucracy","models","risk","decision-making","acquisition","Department of Defense","Army"],"dc:title":["An analysis of the Army’s formal bureaucracy and the impact on acquisition cycles"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Department of the Army"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Program Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:37:49Z"}