{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/56918"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/56918","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Effects of Navy energy goals on the Navy shore energy programs","abstract":"The purpose of this research project is two-fold: to explore the development and progression of the Navy's Green Procurement Program (GPP) and then to assess Navy organizations' degree of success with incorporating GPPs into their installation procurement processes. This project provides an account of the federal policies and guidance regarding green procurement and the salient parts of the Federal Acquisition Regulation (FAR), the framework through which any possible GPP policy would be set. As we surveyed the Navy installation's progress toward a more energy-efficient and resource-conscious procurement process, we measured that progress by the goals and metrics outlined in the Department of Defense's (DOD) GPP instruction. The green procurement process was measured by integrating the Contract Management Maturity Model (CMMM), which describes a procurement agency's level of development across the six phases of the Contract Management Process (CMP) framework. The CMP divides the procurement process into six major phases: procurement planning, solicitation planning, solicitation, source selection, contract administration, and contract closeout or termination. While previous applications of the CMMM focused on broader aspects of buying commands, our questions and diagnosis of Navy installation organizations were specifically focused through a lens of green procurement and energy efficiency. Our results show that Department of Navy procurement personnel have only a basic level of contract management maturity in green procurement.","abstract_html":"The purpose of this research project is two-fold: to explore the development and progression of the Navy&#x27;s Green Procurement Program (GPP) and then to assess Navy organizations&#x27; degree of success with incorporating GPPs into their installation procurement processes. This project provides an account of the federal policies and guidance regarding green procurement and the salient parts of the Federal Acquisition Regulation (FAR), the framework through which any possible GPP policy would be set. As we surveyed the Navy installation&#x27;s progress toward a more energy-efficient and resource-conscious procurement process, we measured that progress by the goals and metrics outlined in the Department of Defense&#x27;s (DOD) GPP instruction. The green procurement process was measured by integrating the Contract Management Maturity Model (CMMM), which describes a procurement agency&#x27;s level of development across the six phases of the Contract Management Process (CMP) framework. The CMP divides the procurement process into six major phases: procurement planning, solicitation planning, solicitation, source selection, contract administration, and contract closeout or termination. While previous applications of the CMMM focused on broader aspects of buying commands, our questions and diagnosis of Navy installation organizations were specifically focused through a lens of green procurement and energy efficiency. Our results show that Department of Navy procurement personnel have only a basic level of contract management maturity in green procurement.","abstract_has_math":false,"creators":["Amundson, Patrick D.","Yu, Edgar A."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Hudgens, Bryan","Nussbaum, Daniel A."],"committee_chairs":[],"committee_members":[],"year":2017,"date_issued":"2017-12","date_published":"2017-12","updated_at":"2026-11-19T06:38:17Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/56918","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/56918","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F56918","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F56918","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Hudgens, Bryan","Nussbaum, Daniel A."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Amundson, Patrick D.","Yu, Edgar A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2018-02-07T20:37:11Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2018-02-07T20:37:11Z"]},{"key":"dc:date.issued","label":"Date","values":["2017-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Navy green procurement","Contract Management Maturity Model"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/56918"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this research project is two-fold: to explore the development and progression of the Navy's Green Procurement Program (GPP) and then to assess Navy organizations' degree of success with incorporating GPPs into their installation procurement processes. This project provides an account of the federal policies and guidance regarding green procurement and the salient parts of the Federal Acquisition Regulation (FAR), the framework through which any possible GPP policy would be set. As we surveyed the Navy installation's progress toward a more energy-efficient and resource-conscious procurement process, we measured that progress by the goals and metrics outlined in the Department of Defense's (DOD) GPP instruction. The green procurement process was measured by integrating the Contract Management Maturity Model (CMMM), which describes a procurement agency's level of development across the six phases of the Contract Management Process (CMP) framework. The CMP divides the procurement process into six major phases: procurement planning, solicitation planning, solicitation, source selection, contract administration, and contract closeout or termination. While previous applications of the CMMM focused on broader aspects of buying commands, our questions and diagnosis of Navy installation organizations were specifically focused through a lens of green procurement and energy efficiency. Our results show that Department of Navy procurement personnel have only a basic level of contract management maturity in green procurement."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/effectsofnavyene1094556918"]},{"key":"dc:title","label":"Title","values":["Effects of Navy energy goals on the Navy shore energy programs"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy","Major, United States Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Hudgens, Bryan","Nussbaum, Daniel A."],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Amundson, Patrick D.","Yu, Edgar A."],"dc:date.accessioned":["2018-02-07T20:37:11Z"],"dc:date.available":["2018-02-07T20:37:11Z"],"dc:date.issued":["2017-12"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["The purpose of this research project is two-fold: to explore the development and progression of the Navy's Green Procurement Program (GPP) and then to assess Navy organizations' degree of success with incorporating GPPs into their installation procurement processes. This project provides an account of the federal policies and guidance regarding green procurement and the salient parts of the Federal Acquisition Regulation (FAR), the framework through which any possible GPP policy would be set. As we surveyed the Navy installation's progress toward a more energy-efficient and resource-conscious procurement process, we measured that progress by the goals and metrics outlined in the Department of Defense's (DOD) GPP instruction. The green procurement process was measured by integrating the Contract Management Maturity Model (CMMM), which describes a procurement agency's level of development across the six phases of the Contract Management Process (CMP) framework. The CMP divides the procurement process into six major phases: procurement planning, solicitation planning, solicitation, source selection, contract administration, and contract closeout or termination. While previous applications of the CMMM focused on broader aspects of buying commands, our questions and diagnosis of Navy installation organizations were specifically focused through a lens of green procurement and energy efficiency. Our results show that Department of Navy procurement personnel have only a basic level of contract management maturity in green procurement."],"dc:description.uri":["http://archive.org/details/effectsofnavyene1094556918"],"dc:identifier.uri":["https://hdl.handle.net/10945/56918"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Navy green procurement","Contract Management Maturity Model"],"dc:title":["Effects of Navy energy goals on the Navy shore energy programs"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy","Major, United States Army"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:38:17Z"}