{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/5842"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/5842","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Impact of the integrated maintenance concept on EA-6B readiness and maintenance support at NAS Whidbey Island, WA and NADEP Jacksonville, FL","abstract":"Faced with an aging Navy air force, the EA -6B, a piece of the aging aircraft inventory puzzle, is included in a mandated program called Integrated Maintenance Concept (IMC.) IMC incorporates a maintenance process called Reliability Centered Maintenance (RCM) to establish and adjust preventative maintenance requirements. The premise of the program is to justify each preventative maintenance action to maintain obsolescent airframes while reducing aircraft out-of-service-time and operating support costs. The imp lementation of a preventative maintenance program validated by RCM coupled with the fixed period end date (PED) will, in theory, reduce total ownership costs (TOC) to include reduced depot level turn around and scheduled maintenance time. The objective of this thesis is to ascertain how the move from SDLM to IMC is impacting the community from all perspectives and their views on readiness and supportability. To gather data, the researcher conducted onsite interviews with key players at all levels of maintenance support. IMC, with the incorporation of RCM justified preventative maintenance actions can positively impact the life of the aircraft however, to make it possible, the depot field site has to be fully supported and the organizational and intermediate levels manned at appropriate levels and training in structures repair, priority.","abstract_html":"Faced with an aging Navy air force, the EA -6B, a piece of the aging aircraft inventory puzzle, is included in a mandated program called Integrated Maintenance Concept (IMC.) IMC incorporates a maintenance process called Reliability Centered Maintenance (RCM) to establish and adjust preventative maintenance requirements. The premise of the program is to justify each preventative maintenance action to maintain obsolescent airframes while reducing aircraft out-of-service-time and operating support costs. The imp lementation of a preventative maintenance program validated by RCM coupled with the fixed period end date (PED) will, in theory, reduce total ownership costs (TOC) to include reduced depot level turn around and scheduled maintenance time. The objective of this thesis is to ascertain how the move from SDLM to IMC is impacting the community from all perspectives and their views on readiness and supportability. To gather data, the researcher conducted onsite interviews with key players at all levels of maintenance support. IMC, with the incorporation of RCM justified preventative maintenance actions can positively impact the life of the aircraft however, to make it possible, the depot field site has to be fully supported and the organizational and intermediate levels manned at appropriate levels and training in structures repair, priority.","abstract_has_math":false,"creators":["Schulz, Kimberly J."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Eaton, Don R.","Gates, William"],"committee_chairs":[],"committee_members":[],"year":2002,"date_issued":"2002-06","date_published":"2002-06","updated_at":"2026-11-19T06:38:38Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/5842","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/5842","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F5842","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F5842","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Eaton, Don R.","Gates, William"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Schulz, Kimberly J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:46:53Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:46:53Z"]},{"key":"dc:date.issued","label":"Date","values":["2002-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["EA-6B","Depot Maintenance","Intermediate Maintenance","Organizational Maintenance","ISR","ASPA","IMC"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/5842"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Faced with an aging Navy air force, the EA -6B, a piece of the aging aircraft inventory puzzle, is included in a mandated program called Integrated Maintenance Concept (IMC.) IMC incorporates a maintenance process called Reliability Centered Maintenance (RCM) to establish and adjust preventative maintenance requirements. The premise of the program is to justify each preventative maintenance action to maintain obsolescent airframes while reducing aircraft out-of-service-time and operating support costs. The imp lementation of a preventative maintenance program validated by RCM coupled with the fixed period end date (PED) will, in theory, reduce total ownership costs (TOC) to include reduced depot level turn around and scheduled maintenance time. The objective of this thesis is to ascertain how the move from SDLM to IMC is impacting the community from all perspectives and their views on readiness and supportability. To gather data, the researcher conducted onsite interviews with key players at all levels of maintenance support. IMC, with the incorporation of RCM justified preventative maintenance actions can positively impact the life of the aircraft however, to make it possible, the depot field site has to be fully supported and the organizational and intermediate levels manned at appropriate levels and training in structures repair, priority."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/impactofintegrat109455842"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xiv, 50 p. : col. ill."]},{"key":"dc:title","label":"Title","values":["Impact of the integrated maintenance concept on EA-6B readiness and maintenance support at NAS Whidbey Island, WA and NADEP Jacksonville, FL"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Eaton, Don R.","Gates, William"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Schulz, Kimberly J."],"dc:date.accessioned":["2012-03-14T17:46:53Z"],"dc:date.available":["2012-03-14T17:46:53Z"],"dc:date.issued":["2002-06"],"dc:description.abstract":["Faced with an aging Navy air force, the EA -6B, a piece of the aging aircraft inventory puzzle, is included in a mandated program called Integrated Maintenance Concept (IMC.) IMC incorporates a maintenance process called Reliability Centered Maintenance (RCM) to establish and adjust preventative maintenance requirements. The premise of the program is to justify each preventative maintenance action to maintain obsolescent airframes while reducing aircraft out-of-service-time and operating support costs. The imp lementation of a preventative maintenance program validated by RCM coupled with the fixed period end date (PED) will, in theory, reduce total ownership costs (TOC) to include reduced depot level turn around and scheduled maintenance time. The objective of this thesis is to ascertain how the move from SDLM to IMC is impacting the community from all perspectives and their views on readiness and supportability. To gather data, the researcher conducted onsite interviews with key players at all levels of maintenance support. IMC, with the incorporation of RCM justified preventative maintenance actions can positively impact the life of the aircraft however, to make it possible, the depot field site has to be fully supported and the organizational and intermediate levels manned at appropriate levels and training in structures repair, priority."],"dc:description.uri":["http://archive.org/details/impactofintegrat109455842"],"dc:format.extent":["xiv, 50 p. : col. ill."],"dc:identifier.uri":["https://hdl.handle.net/10945/5842"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["EA-6B","Depot Maintenance","Intermediate Maintenance","Organizational Maintenance","ISR","ASPA","IMC"],"dc:title":["Impact of the integrated maintenance concept on EA-6B readiness and maintenance support at NAS Whidbey Island, WA and NADEP Jacksonville, FL"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:38:38Z"}